SEWERAGE SYSTEM

STANDARD PRACTICE MANUAL

VERSION 3

SEPTEMBER 2014

HEALTH PROTECTION BRANCH

MINISTRY OF HEALTH

Developed in collaboration with the Applied Science Technologists and Technicians of British Columbia


Primary Authors

Ian Ralston, B.Sc., Pg.Dip.Ag.Eng., ROWP, Eng.L Michael Payne, M.Eng., P.Eng., P.Geo.


SPM Sunset Clause

Sections 8(3) and 9(2) of the Sewerage System Regulation (SSR) outline that the Standard Practice Manual (SPM) can be amended from time to time.

This new, September 2014, SPM Version 3 brings into effect new amendments. This affects all versions previously issued by the BC Ministry of Health.

To allow industry a transition period from the old manual to the new, the previous September 2007 version will not formally sunset until midnight December 31, 2015. Immediate use of the new version is highly recommended, but during this transition period both versions are in effect and it is understood the Authorized Person can use either version. On January 1, 2016, only the SPM Version 3 will be in effect.


Table of Contents

VOLUME I INTRODUCTION

    1. Definitions I-1

      I- 1.1 Glossary ....................................................................................................................................................I-1

      I- 1.2 Table of acronyms................................................................................................................................ I-11

    2. INTRODUCTION AND SCOPE OF THE MANUAL............................................................................................... I-12

      I- 2.1 Purposes of the manual..................................................................................................................... I-12

    3. ROLES AND RESPONSIBILITIES ..................................................................................................................... I-13

I- 3.1 Stakeholders and Organizations ..................................................................................................... I-13

I- 3.2 Role of the Authorized Person ........................................................................................................ I-15

I- 3.3 Roles of Health Officers or other Health Authority staff .......................................................... I-15 I- 3.4 Health Hazards .................................................................................................................................... I-16

  1. 3.5 Owner responsibilities ....................................................................................................................... I-16 I- 4 INTRODUCTION TO THE STANDARD PRACTICE MANUAL ................................................................................ I-18 I- 4.1 Organization of the SPM................................................................................................................... I-18

  1. 4.2 Cross references and references in the SPM................................................................................ I-19

    1. 4.3 Application of the SPM by Authorized Persons .......................................................................... I-19

    1. 4.4 Using the Standard Practice Manual.............................................................................................. I-19

      VOLUME II STANDARDS

        1. INTRODUCTION........................................................................................................................................... II-1

    2. 1.1 How to use this Volume ......................................................................................................................II-1

    II- 1.2 Principles behind the standards ........................................................................................................II-1

      1. GENERAL STANDARDS ................................................................................................................................. II-5

        II- 2.1 Existing systems and system repair................................................................................................. II-5

        II- 2.2 Special circumstances ......................................................................................................................... II-6

      2. PROCEDURE STANDARDS ............................................................................................................................. II-7

        II- 3.1 Sewage source characterization and site use ............................................................................... II-7

        II- 3.2 Administration and Regulatory Requirements............................................................................. II-7 II- 3.3 Site and soil evaluation ...................................................................................................................... II-7

        II- 3.4 Selecting a suitable system based on site conditions ................................................................ II-9 II- 3.5 Plans and specifications ..................................................................................................................... II-9

        II- 3.6 Installation ........................................................................................................................................... II-10

        II- 3.7 Letter of Certification, record drawing and as installed specifications ................................ II-10 II- 3.8 Maintenance and monitoring .......................................................................................................... II-11

      3. STANDARDS FOR SELECTING A SYSTEM FOR A SITE ...................................................................................... II-12

        II- 4.1 Dispersal system selection ............................................................................................................... II-12

        II- 4.2 Treatment method............................................................................................................................. II-19

      4. STANDARDS FOR PLANNING SYSTEMS ........................................................................................................ II-20


    Daily Design Flow I-20

    II- 5.2 Distribution and dosing....................................................................................................................II-22

    II- 5.3 Vertical separation (VS) ....................................................................................................................II-25

    II- 5.4 Horizontal separation .......................................................................................................................II-30

    II- 5.5 Hydraulic Loading Rate (HLR).........................................................................................................II-34

    II- 5.6 Minimum system contour length and Linear Loading Rate ...................................................II-38 II- 6 SPECIFICATION AND INSTALLATION STANDARDS ........................................................................................ II-42 II- 6.1 Flow monitoring .................................................................................................................................II-42

    II- 6.2 Access provisions for maintenance and monitoring ................................................................II-42

    II- 6.3 Connections, piping and collection systems...............................................................................II-42

    II- 6.4 Tanks, septic tanks and effluent filters, treatment systems ................................................... II-44 II- 6.5 Dispersal systems, general.............................................................................................................. II-46

    II- 6.6 Trench infiltration systems ..............................................................................................................II-48

    II- 6.7 Seepage Bed systems....................................................................................................................... II-49

    II- 6.8 Shallow, at grade and raised systems ...........................................................................................II-50

    II- 6.9 Gravity distribution............................................................................................................................ II-51

    II- 6.10 Pressure distribution .........................................................................................................................II-53

    II- 6.11 Subsurface Drip Dispersal ................................................................................................................II-54

    II- 6.12 Dosing systems ...................................................................................................................................II-56

    II- 6.13 At-grade beds .....................................................................................................................................II-58

    II- 6.14 Alberta At Grade system (AAG)......................................................................................................II-60

    II- 6.15 Sand mounds and sand lined trenches and beds ......................................................................II-62

    II- 6.16 Combined Treatment and Dispersal Systems (CTDS)...............................................................II-66

    II- 6.17 Evapotranspiration (ET) and Evapotranspiration Absorption (ETA) beds ...........................II-68 II- 6.18 BC Zero Discharge Lagoons ............................................................................................................II-70

    II- 6.19 Site drainage .......................................................................................................................................II-72

    II- 7 MAINTENANCE AND MONITORING STANDARDS ......................................................................................... II-73

    II- 7.1 Maintenance and monitoring frequency .....................................................................................II-73

    II- 7.2 Maintenance procedures .................................................................................................................II-73

    VOLUME III GUIDELINES

      1. INTRODUCTION.......................................................................................................................................... III-1

        III- 1.1 Departure from Volume III guidelines ........................................................................................... III-1

      2. GENERAL GUIDELINES ................................................................................................................................. III-1

        III- 2.1 Existing systems and system repair................................................................................................ III-1

        III- 2.2 Special circumstances ........................................................................................................................III-3

      3. PROCEDURE GUIDELINES ............................................................................................................................. III-6

        III- 3.1 Sewage source characterization and site use ..............................................................................III-6

        III- 3.2 Administrative and regulatory requirements ..............................................................................III-7 III- 3.3 Site and soil evaluation .....................................................................................................................III-8


        III- 3.4 Selecting a system based on site conditions I-16

        III- 3.5 Plans and specifications .................................................................................................................. III-17

        III- 3.6 Installation .......................................................................................................................................... III-17

        III- 3.7 Letter of certification, record drawing and as installed specifications .............................. III-20 III- 3.8 Maintenance and monitoring ....................................................................................................... III-23

      4. GUIDELINE TO SELECTING A SYSTEM FOR A SITE.......................................................................................... III-24

        III- 4.1 Dispersal system selection ............................................................................................................. III-24

        III- 4.2 Treatment method and treatment system selection .............................................................. III-40

      5. GUIDELINES FOR PLANNING SYSTEMS ........................................................................................................ III-43

    III- 5.1 Daily Design Flow............................................................................................................................. III-43

    III- 5.2 Distribution and dosing guidelines ............................................................................................. III-54

    III- 5.3 Vertical separation ........................................................................................................................... III-62

    III- 5.4 Horizontal separation ..................................................................................................................... III-70

    III- 5.5 Hydraulic Loading Rate .................................................................................................................. III-73

    III- 5.6 Minimum system contour length and Linear Loading Rate (LLR) ....................................... III-75 III- 6 SPECIFICATION AND INSTALLATION GUIDELINES ........................................................................................ III-84 III- 6.1 Flow monitoring ............................................................................................................................... III-84

    III- 6.2 Access provisions and provisions for maintenance and monitoring.................................. III-84 III- 6.3 Connections, piping and collection systems............................................................................. III-86

    III- 6.4 Tanks, septic tanks and effluent filters, treatment systems .................................................. III-88 III- 6.5 Dispersal systems, general............................................................................................................. III-95

    III- 6.6 Trench systems ................................................................................................................................ III-101

    III- 6.7 Seepage Bed systems.....................................................................................................................III-102

    III- 6.8 Shallow, at grade and raised systems ........................................................................................III-103

    III- 6.9 Gravity distribution.........................................................................................................................III-105

    III- 6.10 Pressure distribution ......................................................................................................................III-108

    III- 6.11 Subsurface Drip Dispersal ............................................................................................................. III-112

    III- 6.12 Dosing and pump chambers ........................................................................................................ III-119

    III- 6.13 At-grade beds ..................................................................................................................................III-128

    III- 6.14 Alberta At Grade system (AAG)...................................................................................................III-134

    III- 6.15 Sand mounds and sand lined trenches and beds ...................................................................III-135

    III- 6.16 Combined Treatment and Dispersal Systems (CTDS)............................................................III-143

    III- 6.17 Evapotranspiration (ET) and Evapotranspiration Absorption (ETA) beds ........................III-145 III- 6.18 BC zero discharge lagoons ...........................................................................................................III-147

    III- 6.19 Site drainage ....................................................................................................................................III-153

      1. MAINTENANCE GUIDELINES ....................................................................................................................III-155

        III- 7.1 Maintenance and monitoring frequency ..................................................................................III-155

        III- 7.2 Maintenance Procedures ..............................................................................................................III-155

        III- 7.3 Minimum Maintenance Tasks ......................................................................................................III-158


      2. Appendices 1

    III- 8.1 Owner declaration 1

    III- 8.2 Residual Chlorine, water softener and other backwash water 2

    III- 8.3 Soils 2

    III- 8.4 Sodium and soil dispersion 15

    III- 8.5 System Selection Worksheet template 16

    III- 8.6 Imperial conversion of standards tables 18

    III- 8.7 Septic tank projected pump out intervals 27

    III- 8.8 Pressure distribution system information 27

    III- 8.9 Sand mound installation instructions 32

    III- 8.10 Sand lined trench/bed diagrams 34

    VOLUME IV RATIONALE

      1. INTRODUCTION.......................................................................................................................................... IV-1

      2. PERFORMANCE CONTEXT ............................................................................................................................ IV-1

    IV- 2.1 Performance statements ................................................................................................................... IV-1

    IV- 2.2 Performance requirements and objectives .................................................................................. IV-1 IV- 3 FORMS OF RATIONALE ................................................................................................................................ IV-4 IV- 4 RATIONALE FOR SELECTION OF MINIMUM STANDARDS ................................................................................ IV-4

      1. RATIONALE FOR DESIGN STANDARDS.......................................................................................................... IV-5

        IV- 5.1 Priority for soil treatment ................................................................................................................ IV-5

        IV- 5.2 Soils and site evaluation................................................................................................................... IV-5

        IV- 5.3 System selection standards ............................................................................................................. IV-6

        IV- 5.4 Design flow .........................................................................................................................................IV-10 IV- 5.5 Sewage and Type 1 effluent parameters .....................................................................................IV-12

        IV- 5.6 Soil treatment performance ...........................................................................................................IV-13

        IV- 5.7 Dosing ..................................................................................................................................................IV-18

        IV- 5.8 Vertical separation ........................................................................................................................... IV-20

        IV- 5.9 Horizontal separation ......................................................................................................................IV-21

        IV- 5.10 Hydraulic Loading Rate .................................................................................................................. IV-23

        IV- 5.11 System minimum contour length and Linear Loading Rates ............................................... IV-26

      2. SPECIFICATION AND INSTALLATION STANDARDS........................................................................................IV-29

      3. MAINTENANCE AND MONITORING............................................................................................................IV-29

      4. DESIGN MANUALS AND OTHER REFERENCES ..............................................................................................IV-30



    SEWERAGE SYSTEM

    STANDARD PRACTICE MANUAL

    VOLUME I - INTRODUCTION

    VERSION 3 SEPTEMBER 2014

    HEALTH PROTECTION BRANCH

    MINISTRY OF HEALTH

    Sewerage System Standard Practice Manual Version 3 Volume I Table of Contents

    Volume I Table of Contents

    VOLUME I INTRODUCTION

    1. Definitions I-1

      I- 1.1 Glossary ....................................................................................................................................................I-1

      I- 1.2 Table of acronyms................................................................................................................................ I-11

    2. INTRODUCTION AND SCOPE OF THE MANUAL............................................................................................... I-12

      I- 2.1 Purposes of the manual..................................................................................................................... I-12

      I- 2.1.1 Definition of standard practice.............................................................................................................. I-12

      I- 2.1.2 The SPM as a source of standard practice........................................................................................ I-12

    3. ROLES AND RESPONSIBILITIES ..................................................................................................................... I-13

I- 3.1 Stakeholders and Organizations ..................................................................................................... I-13

I- 3.2 Role of the Authorized Person ........................................................................................................ I-15

I- 3.2.1 Regulatory associations for Authorized Persons............................................................................ I-15

I- 3.3 Roles of Health Officers or other Health Authority staff .......................................................... I-15 I- 3.4 Health Hazards .................................................................................................................................... I-16

I- 3.5 Owner responsibilities ....................................................................................................................... I-16 I- 4 INTRODUCTION TO THE STANDARD PRACTICE MANUAL ................................................................................ I-18 I- 4.1 Organization of the SPM................................................................................................................... I-18

I- 4.2 Cross references and references in the SPM................................................................................ I-19

I- 4.3 Application of the SPM by Authorized Persons .......................................................................... I-19

I- 4.4 Using the Standard Practice Manual.............................................................................................. I-19

I- 4.4.1 For a typical design and installation ................................................................................................... I-19

  1. 4.4.2 During system maintenance................................................................................................................... I-19

  1. 4.4.3 For Health Officers ..................................................................................................................................... I-19

    1. 4.4.4 For owners and the public ...................................................................................................................... I-20


      Volume I Introduction

      1. DEFINITIONS

        These definitions are specific to this Manual.


        I- 1.1 Glossary


        A

        Absorption: The process by which one substance is taken into and included within another substance, such as the absorption of water by soil or nutrients by plants.

        Adsorption: The increased concentration of molecules or ions at a surface, including exchangeable cations and anions on soil particles. The adherence of a dissolved solid to the surface of a solid.

        Alarm reserve: The holding volume of a pump or dosing tank, or connected tanks, that is above the high level alarm and below the point at which backup to the building sewer, or overflow occurs

        Aerobic: Having molecular oxygen as a part of the environment, or growing or occurring only in the presence of molecular oxygen, as in “aerobic organisms.”

        Anaerobic: Characterized by the absence of molecular oxygen, or growing in the absence of molecular oxygen (as in “anaerobic bacteria”).

        Aquifer: A geologic formation, group of formations, or part of a formation that is saturated and sufficiently permeable to transmit economic quantities of water to wells and springs.

        Area of Infiltrative Surface (AIS): Infiltrative surface area receiving effluent from the distribution system. Areal loading rate: Quantity of effluent applied to the footprint of the soil treatment area (or the absorption area of an above-grade system) expressed as volume per area per unit time, for example, litres per day per square metre (L/day/m2).

        ASTM: American Society for Testing Materials


        B

        Basal Area: For sand mounds, sand-lined trenches, bottomless sand filters, Alberta At Grade systems and CTDS this is the native soil AIS, the effective surface area available or required to transmit the treated effluent into the original receiving soils.

        Biochemical oxygen demand (BOD): A commonly used gross measurement of the concentration of biodegradable organic impurities in wastewater. The amount of oxygen, expressed in milligrams per liter (mg/L), used by bacteria while stabilizing, digesting, or treating organic matter under aerobic conditions is determined by the availability of material in the wastewater to be used as biological food and the amount of oxygen used by the microorganisms during oxidation. Most laboratories test for BOD5. This is the BOD measured over a 5 day period.

        Biomat: Soil clogging layer at and below the infiltrative surface to soil or to sand or other media. The layer of biological growth, organic compounds (including polysaccharides and polyuronides produced by bacteria in the mat) and inorganic residue that develops at the wastewater soil interface and extends up to about 25mm into the soil matrix. The term is used loosely to include all soil “clogging” affects, including pore size reduction, alteration of soil structure and gas production by the micro-organisms. Also referred to as Biocrust, Clogging Mat, and Clogging Zone.

        Blackwater: Liquid and solid human body waste and the carriage waters generated through toilet usage.


        Blinding layer: A layer of Clean Coarse Sand or Mound Sand that is installed between the infiltration surface (bottom of aggregate, base of chamber etc.) and the native soil, and which is up to 10 cm thick.

        Breakout or effluent breakout: (Also used to refer to a place where there is a potential for breakout.) Visible movement of effluent to the surface of the ground.


        C

        Cemented (soil): Having a hard, brittle consistence because the particles are held together by cementing substances such as humus, calcium carbonate, or the oxides of silicon, iron, and aluminum. The hardness and brittleness persist even when the soil is wet.

        Chlorine residual: The total amount of chlorine (combined and free available chlorine) remaining in water, sewage, or industrial wastes at the end of a specified contact period following disinfection.

        Chroma: relative purity, strength, or saturation of a colour; directly related to the dominance of the determining wavelength of the light and inversely related to grayness; one of the three variables of colour; see also Munsell Colour System, hue, and value.

        Clay: A textural class of soils consisting of particles less than 0.002 millimetres in diameter.

        Coarse fragments: (in soil) rock fragments larger than 2 mm in diameter.

        Coefficient of uniformity (soil or sand): This ratio is a numeric representation of how a soil or sand is graded, calculated as Cu = D60/D10.

        Coliform bacteria: A group of bacteria predominantly inhabiting the intestines of humans or other warm- blooded animals, but also occasionally found elsewhere. Used as an indicator of human fecal contamination. Fecal coliforms are often used as a key indicator of fecal contamination in water, see Fecal Coliforms. Usually measured as number of colonies/100 mL or most probable number (MPN)

        Colony-forming unit (CFU): The estimated number of live non-photosynthetic bacteria in a water sample, based on laboratory examination.

        Combined Treatment and Dispersal System (CTDS): A sewerage system that provides treatment to a Type 2 or 3 standard using media or through other processes in the same cell or unit that disperses the effluent to the soil.

        Confined Aquifer: An aquifer that is confined under a low-permeability geological layer, and in which ground water is confined under a pressure that is higher than the elevation of the top of the aquifer. Consistence (soil): Attribute of soil expressed in degree of cohesion and adhesion, or in resistance to deformation or rupture. Consistence includes the resistance of soil material to rupture; resistance to penetration; and the manner in which the soil material behaves when subjected to compression. Refer to USDA manuals for tests and terms.


        D

        D10: In Sieve analysis of sand or soil. The size of the opening which will pass 10% (by dry weight) of a sample. Also known as effective diameter.

        D60: In Sieve analysis of sand or soil. The size of the opening which will pass 60% (by dry weight) of a sample.

        Daily Design Flow (DDF): The Daily Design Flow is the estimated peak daily flow to be discharged. For the purposes of the SPM this is considered to be synonymous with the SSR terms “estimated daily domestic sewage flow” and “daily design domestic sewage flow”, and generally represents the maximum flow that the system will discharge.


        Discharge Area (dispersal area): An area used to receive effluent discharged from a treatment method. The dispersal area is distinct from the “treatment method”, and any additional treatment achieved by the dispersal area is not considered in the treatment method classification (Type 1, 2 or 3). See “dispersal system” and “treatment method”.

        Disinfection: The process of destroying pathogenic and other microorganisms in wastewater, typically through application of chlorine compounds, ultraviolet light, iodine, ozone, and the like.

        Dispersal system: An underground system for discharging pretreated wastewater. The dispersal system includes the distribution piping, any sand or media installed around or below the distribution piping, the biomat at the wastewater-soil interface, and the unsaturated soil below. Also known as the “Subsurface Wastewater Infiltration System” (SWIS) and colloquially as a “septic field”.

        Distal: Furthest from a point of reference, example at the far end of a lateral. The opposite of distal is proximal.

        Distribution system: A method and the components used to convey and distribute effluent to the infiltrative surface.


        E

        Effluent: Sewage, water, or other liquid, partially or completely treated or in its natural state, flowing out of a septic tank, subsurface wastewater infiltration system, aerobic treatment unit, or other treatment system or system component.

        Effective size: In a sieve analysis, the particle diameter of which 10 percent of the sample is finer by weight; also known as D10 or effective diameter.

        Effluent filter (also called an effluent screen): A removable, cleanable device inserted into the outlet piping of the septic tank that is designed to trap excessive solids due to tank upsets that would otherwise be transported to the subsurface wastewater infiltration system or other downstream treatment components.

        Effluent screen: See Effluent filter.

        Ephemeral water body: A water body that flows or holds water only in direct response to precipitation and whose channel is at all times above the water table.

        Evapotranspiration: The combined loss of water from a given area and during a specified period of time by evaporation from the soil or water surface and by transpiration from plants.


        F

        Fecal Coliforms: Fecal Coliform bacteria are members of the coliform group of bacteria. These bacteria are characterized by their ability to ferment lactose at 112.1°F (44.5°C) and are considered more specific indicators of fecal contamination than Coliforms which ferment lactose only at 95°F (35°C). Escherichia coli and some Klebsiella pneumoniae strains are the principal fecal coliforms

        Field saturated hydraulic conductivity: See Hydraulic conductivity.

        Floor area: See “living space”.

        Flow restrictive layer: See “Restrictive layer”.

        Fresh water, permanent: A fresh water body that holds water for periods more than 6 months in duration.


        G

        Gravel: rounded or subrounded rock fragment that is between 0.1 inch (2 millimetres) and three inches (76 millimetres) in diameter.

        Graywater (greywater): Wastewater drained from sinks, tubs, showers, dishwashers, clothes washers, and other non-toilet sources.


        Ground water: A subsurface water occupying the zone of saturated soil, permanently, seasonally, or as the result of the tides.

        Groundwater mounding: localized increase in the elevation of a water table that builds up as a result of the downward percolation of liquid into groundwater.


        H

        Health hazard: As defined in the Public Health Act.

        Health hazard: As defined in the Public Health Act.

        High pumping rate community well: For the purpose of determining horizontal setbacks, this means a water supply well or well group that supplies potable to more than 500 persons. A water well may also be considered to be of a high pumping rate if it is pumped for more than three months at a rate of more than 190 L/min.

        High water mark: The visible high water mark of a water body where the presence and action of the water are so common and usual, and so long continued in ordinary years, as to mark on the soil of the bed of the water body a character distinct from that of its banks, in vegetation as well as the nature of the soil itself, and includes the active floodplain.

        Horizontal separation boundary: A point or location to which a separation distance for the dispersal area or tanks is defined by the standards

        Hydraulic Application Rate (HAR): Depth of effluent applied to the infiltrative surface per dose (example mm), may also be expressed in terms of volume per area (example L/m2) or in volume per orifice or emitter. Hydraulic conductivity (soil): The ability of the soil to transmit water in liquid form through pores. This is termed “K” and is expressed in mm/day or other units of length/time. “Ksat” is the saturated hydraulic conductivity and is often the value intended when the term “hydraulic conductivity” is used loosely. “Kfs” is the field saturated hydraulic conductivity, as measured by the constant head borehole permeameter, and is approximately 0.5 Ksat. Hydraulic conductivity is often loosely referred to as “permeability”.


        I

        Infiltrative Surface: In drainfields, the drain rock-original soil interface at the bottom of the trench; in mound systems, the gravel-Mound Sand and the sand-original soil interfaces; in sand-lined trenches/beds (sand filter), the gravel-sand interface and the sand-original soil interface at the bottom of the trench or bed. Influent: Wastewater, partially or completely treated, or in its natural state (raw wastewater, sewage), flowing into a reservoir, tank, treatment unit, or disposal unit.

        Instantaneous loading rate: Quantity of effluent discharged during a dosing event expressed as volume per unit time.

        Intermittent fresh water body: For the purposes of this Manual, a fresh water body that flows or holds water during only part of the year and for a period less than six months in duration, other than an “ephemeral” water body.

        Invert (pipe): Lowest point of the internal cross-section of a pipe or fitting.


        L

        Landscape position: specific geomorphic component of the landscape in which a site is located; two- dimensional landscape positions (hill slope profile positions) may be summit, shoulder, backslope, footslope, or toeslope; three dimensional views of geomorphic landscape position can be described as head slope, nose slope, side slope, base slope, etc.

        Large flow system: a sewerage system with daily domestic sewage flow of over 9100 L/day.


        Lateral: Perforated pipe or tubing used to carry and distribute effluent.

        Latrine: See “Privy.”

        Limiting layer: The shallowest of a restrictive layer (see Restrictive Layer), water table, seasonal high water table or extremely permeable material (e.g. fractured rock, gravel). See Table II- 7 (page II-17) for specific soil conditions considered to be a limiting layer.

        Living space: The total net floor area of a building less the floor area of a garage, breezeway, carport, crawl space or decks exterior to the building’s foundation walls.

        Loam: A specific class of soil texture that contains a balanced mixture of sand, silt and clay. Clay content is less than 27% by weight. Loams have enough sand to feel some grit and enough clay to give the soil some body, but the properties and behavior of the soil are dominated by neither sand nor clay.

        Lysimeter: A device for collecting water from the pore spaces of soils and for determining the soluble (and in some cases, suspended) constituents removed in the pore water.


        M

        Macropore (soil): The term includes all pores that are (generally) drained at field capacity, commonly these pores are of 1mm or larger equivalent diameter. This includes root channels and soil macro structure. These pores are the main path for preferential (rapid saturated) flow in structured soils and fractured rock.

        Manifold: A pipe used to distribute effluent to more than one lateral or dripline.

        Mass loading: See “Organic loading rate”. This may also refer to the mass loading to a sewage treatment system.

        Matrix (soil): The portion of a given soil that has the dominant colour; also used to refer to the fine material ( generally <2mm) forming a continuous phase and enclosing coarser material and/or pores—that is, soil peds or particles versus the voids between peds or in cracks.

        Matrix flow: This is the relatively slow and even movement of solutes through the soil. The objective of careful effluent dosing and distribution is to encourage unsaturated matrix flow, improving soil based treatment. Also termed “uniform flow.”

        Media, distribution: Material used to provide void space (usually in a dispersal component) through which effluent flows and is stored prior to infiltration (for example, washed stone, aggregate, polystyrene blocks, chambers, etc.).

        Media, treatment: Non-degradable material used for physical, chemical and/or biological treatment in a component of a wastewater system. Example sand in a sand mound.

        Monitoring well: For the purpose of this Manual, a well that is dug or drilled to a depth that is lower than the expected seasonal high water table, with a well screen and a surface annular seal, which is used for measuring the depth of the water table and or collecting groundwater samples. In contrast, an "observation standpipe" does not have a surface annular seal, and is not intended for sampling of groundwater.

        Mottling: Spots or blotches of different colours or shades of colour interspersed with the dominant soil colour caused in part by exposure to alternating unsaturated and saturated conditions. See “Redoximorphic.” Munsell Colour System: Colour designation system that specifies the relative degrees of the three variables of colour: hue, value, and chroma.


        N

        Nitrogen (N): Gaseous element (molecular formula N2) that constitutes 78 percent of the atmosphere by volume and occurs as a constituent of all living tissues in combined form; nitrogen is present in wastewater, surface water and groundwater as ammonia (NH3) or ammonium ion (NH +), nitrite (NO ), nitrate (NO ) and

        organic nitrogen.

        4 2 3


        O

        Observation Port: Larger diameter (over 3") pipe, open bottom or slotted, used to observe the infiltration surface or interior of a chamber.

        Observation standpipe: See “Standpipe”.

        Oil and Grease (O&G): Fats, oils, waxes and other related constituents found in wastewater. Oil and Grease content is determined by extraction from the wastewater sample with trichlorofluoroethane, and is expressed in mg/L. Previously termed “Fat Oil and Grease” (FOG).

        Organic loading rate (to infiltrative surface): The rate of application of soluble and particulate organic matter. It is typically expressed on an area basis as g/m2 or pounds of BOD5 per square foot per day (lb./ft2/day).

        Organic soil: A soil that contains a high percentage (more than 15 – 20%) of organic matter throughout the soil column.

        Oxidation: Chemical reaction in which a loss of electrons results in an increase in oxidation number (valence) of an element; occurs concurrently with reduction of the associated reactant. Chemical or biological conversion of organic matter to simpler, stable forms with a concurrent release of energy.


        P

        Packaged treatment plant: Term commonly used to describe a pre-built aerobic treatment unit.

        Particle size: The effective diameter of a particle, usually measured by sedimentation or sieving.

        Particle-size distribution: The amounts of the various soil size fractions in a soil sample, usually expressed as weight percentage.

        Pathogenic: Causing disease; commonly applied to microorganisms that cause infectious diseases.

        Peat: Organic (fibric) soil material in which the original plant parts are recognizable.

        Ped: (soils) a single unit of soil structure.

        Performance boundaries: The point at which a wastewater treatment performance standard corresponding to the desired level of treatment at that point in the treatment sequence is applied. Performance boundaries can be designated at a point of the pre-treatment system (for example, septic tank, packaged treatment plant), at physical boundaries in the receiving environment (impermeable strata, ground water table, breakout), at a point of use (ground water well), or at a property boundary.

        Performance objective: An objective established as part of the SPM or by a regulatory authority to ensure performance standards are met. Performance objectives are typically expressed as numeric limits (for example, pollutant concentrations, mass loads, wet weather flows, and structural strength) but may also be expressed as narrative descriptions of desired performance, such as no visible leaks or no odors.

        Performance standard: A standard established as part of the SPM or by a regulatory authority, for example Type 2 treatment system performance standards established by the SSR.

        Performance statement: A standard established as part of the SPM or by a regulatory authority to ensure future compliance with the public health and environmental goals. Performance standards are typically expressed as narrative statements such as “do not cause a health hazard”.

        Permanent Water Table: See “Water Table.”

        Permeability: The ability of a porous medium such as soil to transmit fluids or gases.

        pH: A term used to indicate the acidity or alkalinity of the water. The logarithm of the reciprocal of hydrogen-ion concentration in gram atoms per liter; provides a measure on a scale from 0 to 14 of the acidity or alkalinity of a solution (where 7 is neutral and greater than 7 is more alkaline and less than 7 is more acidic).


        Phosphorus (P): Chemical element and essential nutrient for all life forms, occurring as orthophosphate, pyrophosphate, tripolyphospate and organic phosphate forms; each of these forms, as well as their sum (total phosphorus), is expressed in terms of milligrams per liter elemental phosphorus; occurs in natural waters and wastewater almost solely as phosphates. Total (TP) is the sum of all forms of phosphorus in effluent.

        Plastic soil: A soil capable of being molded or deformed continuously and permanently by relatively moderate pressure.

        Platy structure (soil): Laminated or flaky soil aggregate developed predominantly along the horizontal axes. Point of Application (POA): The point within a sewerage system where the wastewater quality consistently meets the quality level for the treatment method selected (Type 1, 2 or 3), typically the infiltrative surface.

        For Combined Treatment and Dispersal systems (CTDS), the point at which a CTDS produces effluent at the defined quality level (Type 2 or 3).

        Ponding: Accumulation of liquid on an infiltrative surface.

        Preferential flow: Saturated flow in macropores or as finger or funnel flow in unstructured soils, it is the rapid and local transport of water and solutes in soils. For good soil base treatment this type of flow should be avoided. Also known as “bypass flow”. See Matrix flow, macropore.

        Primary treatment: Level of treatment involving removal of particles, typically by settling and flotation with or without the use of coagulants. Some solids are anaerobically bio-degraded but dissolved contaminants are not significantly removed in this treatment step (for example a grease interceptor or a septic tank provides primary treatment). Type 1 effluent is produced by primary treatment.

        Privy: A structure used for disposal of human waste without the aid of water; it consists of a shelter built above a pit or vault in the ground into which human waste falls. The vault may be impermeable (vault privy) or may include soil absorption (pit latrine or pit privy). Privies are not allowed under the Sewerage System Regulation.

        Proximal: Nearest to a point of reference, example at the end of a lateral closest to the manifold. The opposite of proximal is distal.


        R

        Receiving area: the area 7.5m downslope from the system infiltrative surface, or on flat or low (≤ 2%) slope sites, the area 7.5m around the system infiltrative surface.

        Redoximorphic features: or mottling is identified by the presence of oxidized and reduced states of iron or manganese in the same ped (single unit of soil structure). See “mottling.”

        Reduction (reducing): Addition of electrons to a chemical entity decreasing its valence or oxidation number; for example under anaerobic conditions (no dissolved oxygen present), sulfur compounds are reduced by bacteria to odor-producing hydrogen sulfide (H2S) and other compounds.

        Restrictive Layer: A layer of soil or rock that impedes the vertical movement of water, air and the growth of plant roots. This may include hardpan, some compacted soils, bedrock, glacial till and unstructured clay soils. In this Manual, “restrictive layer” includes soils with a Kfs of less than 60 mm/day, if the soil underlies a soil layer of higher permeability. Also, for this Manual, “restrictive layer” includes soils with a consistency stronger than Firm (moist), or harder than Moderately Hard (dry).

        Retention time: Time for which a liquid or sludge is retained in a process component (For example, in a lagoon). See Detention Time.


        S

        Seasonal High Water Table (SHWT): The SHWT is the upper limit of the soil water table which persists for more than 21 consecutive days or 30 total days, during a year which has normal precipitation. See Section III- 3.3.2.2.(a).

        Seasonal Low Water Table: See Water table.

        Semi-prescriptive standards: Standards or specifications for planning, siting, and other procedures and practices for onsite system applications intended to, where applied, result in achievement of specified performance standards. Proposed deviations from the specified criteria, procedures, or practices do not require formal approval by a regulatory authority, but are made based upon achievement of equivalent performance by the system.

        Septage: The liquid, solid, and semisolid material that results from wastewater pre-treatment in a septic tank. Septic tank: A buried, preferably watertight tank that is designed and constructed to receive and partially treat raw wastewater. The tank separates and retains settleable and floatable solids suspended in the raw wastewater.

        Settleable solids: Matter in wastewater that will not stay in suspension during a designated settling period. Sewage: Any urine, feces, and the water carrying human wastes including kitchen, bath, and laundry wastes from residences, building, industrial establishments or other places. For the purposes of the SPM, “sewage” is generally synonymous with domestic wastewater or domestic sewage. Note that industrial wastewater falls outside the scope of the SPM.

        Silt: A textural class of soils consisting of particles between 0.05 and 0.002 millimetres in diameter.

        Slope Shape: Slope shape is described in two directions: 1) up and down slope (perpendicular (or normal) to the contour); and 2) across slope (along the horizontal contour). Concave: landscape form or feature that is curved like a segment of the interior of a hollow sphere. Convex: landscape form or feature that has a surface that is curved or rounded outward. This data element is split into two sequential parts (Slope Across and Slope Up & Down); for example, Linear, Convex.

        Small flow system: a sewerage system with daily domestic sewage flow of 9100 L/day or less.

        Soil horizon: A layer of soil or soil material approximately parallel to the land surface and different from adjacent layers in physical, chemical, and biological properties or characteristics such as colour, structure, texture, consistence, and pH.

        Soil structure: The combination or arrangement of individual soil particles into definable aggregates, or peds, which are characterized and classified on the basis of size, shape, and degree of grade (distinctness). Soil structure grade: Degree of distinctness (degree of aggregation), how well the structure is expressed in place. Refer to USDA or CANSIS manuals for terms.

        Soil Ped: A single unit of soil structure. See “Ped.”

        Soil textural class: Percentage by weight of sand silt and clay such that each class possesses unique physical characteristics and management relative to the other textural class. The textural classes may be modified by the addition of suitable adjectives when rock fragments are present in substantial amounts; for example, "gravelly loam".

        Soil texture: The relative proportions of the various soil separates (for example, silt, clay, sand) in a soil.

        Soil water: A general term emphasizing the physical rather than the chemical properties and behavior of the soil solution.

        Standpipe (observation standpipe): Pipe, slotted or open bottom, which is used to measure the depth of the water table. A standpipe is not sealed, and is slotted or perforated over most of its length. It could range in diameter from, typically, 25 to 150 mm diameter.

        Structure (soil): See “soil structure”.


        Suspended solids (SS): The residue that is retained after filtering a sample of water or wastewater through a standard glass-fiber filter. The concentration of total suspended solids is the weight of the dried solids retained on the filter, divided by the volume of the sample from which the solids were collected. This is often expressed as mg/L.

        Swale: Natural or constructed elongated depressional drainage feature used to divert run-on or runoff and direct the flow to an effective outlet.


        T

        Texture (soil): See “soil texture”.

        Toe Blanket: A blanket or mantle of sand or permeable soil that is placed at the toe of raised dispersal system or in the receiving area. The purpose is to aid seepage from the raised system into the native soil, or to provide additional depth for effluent to move away from the dispersal area and to provide a cover above soil that may be saturated.

        Toe Drain: A subsurface drain installed near the toe of a sand mound or other raised dispersal system, or at the toe of a toe blanket. The purpose is the help drain the part of the dispersal system where water is most likely to accumulate. This is sometimes called a relief drain.

        Transpiration: The process by which water absorbed by plants, usually through the roots, is evaporated into the atmosphere from the plant surface, principally from the leaves.

        Treatment method: The application of an appropriate onsite technology to achieve standards for Type 1, 2 or 3 treatment method as stipulated in the Sewerage System Regulation. The treatment method is a separate entity from the “discharge area”, which may also treat effluent but has the primary function of effluent dispersal (see “discharge area”).


        U

        Unconfined aquifer: An aquifer containing water that is not under pressure; the water level in a well is the same as the water table outside the well. Also known as “water table aquifer”.

        Uniformity Coefficient (particle size distribution): See “coefficient of uniformity”.

        Unsaturated flow: Movement of water in a soil that is not filled to capacity with water.

        Unsaturated soil: Soil in which the pore spaces contain water at less than atmospheric pressure, as well as air and other gases.


        V

        Vadose zone: Aerated region of soil located above the permanent water table, and hence unsaturated most of the time.

        Vertical Separation (native soil): The depth of unsaturated, original, undisturbed permeable soil below the infiltrative surface and above any limiting layer.

        Vertical Separation (as constructed): The depth of unsaturated, original, undisturbed permeable soil below the infiltrative surface and above any limiting layer PLUS the depth of sand media between the infiltrative surface and the native soil.


        W

        Water budget: In general use this is a hydrological formula used to determine water surpluses and deficits in a given area, providing a budget of the incoming and outgoing water from a region, including rainfall, evaporation, run-on, runoff, and seepage (absorption). For a dispersal system (Example an ETA bed or ET bed) this is used to provide a balance sheet for the inputs and outputs of water to the unit.

        Water suction line: A pipe that delivers water to the suction or inlet side of a pump.

        Water table: (Seasonal Low Water Table) (Permanent Water Table) The level in saturated soil at which the hydraulic pressure is zero (i.e., equal to atmospheric pressure). In terms of the Standard Practice Manual vertical separation standards the permanent water table refers to the lowest elevation of the water table during a year which has precipitation of at least 30% of average annual precipitation (to a maximum of 1 in 20 year return period precipitation).

        Water well: As defined in the Ground Water Protection Regulation as a “water supply well”. Includes wells used to supply water for domestic purposes, for irrigation purposes, and open loop geothermal wells.

        Wetland: Area that is inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soils conditions; natural wetlands generally include swamps, marshes, bogs and similar areas, but not constructed wetlands used in wastewater treatment.


        I- 1.2 Table of acronyms


        ABBREVIATION

        FULL TEXT

        AIS

        Area of Infiltrative Surface

        AP

        Authorized Person

        APEGBC

        Association of Professional Engineers and Geoscientists of BC

        ASTTBC

        Applied Science Technicians and Technologists of BC

        BOD or BOD5

        Biochemical Oxygen Demand (5 day)

        CFUs

        Coliform Forming Units

        CTDS

        Combined Treatment and Dispersal System

        D-box

        Distribution box

        DDF

        Daily Design Flow

        FOG

        Fats, Oils, Grease (also known as O&G)

        HAR

        Hydraulic Application Rate

        HLR

        Hydraulic Loading Rate

        HS

        Horizontal separation

        Kfs

        Field Saturated Hydraulic Conductivity

        LLR

        Linear Loading Rate

        Perc or Perc rate

        Percolation rate

        POA

        Point of Application

        ROWP

        Registered Onsite Wastewater Practitioner

        SDD

        Subsurface Drip Dispersal

        SHWT

        Seasonal high water table

        SPM

        Sewerage System Standard Practice Manual

        SSR

        Sewerage System Regulation

        TSS

        Total Suspended Solids

        USDA

        United States Department of Agriculture

        USEPA

        United States Environmental Protection Agency

        VS

        Vertical Separation


      2. INTRODUCTION AND SCOPE OF THE MANUAL

        The Sewerage System Standard Practice Manual (SPM) is a reference manual which provides standards and guidelines for site and soil evaluation, planning, installation and maintenance for sewerage systems under the Sewerage System Regulation (SSR) which identifies the SPM as a source of standard practice. The SPM is published by the Ministry of Health.

        Holding tanks (including vault privies) are regulated by the SSR, but do not require planning or installation by an Authorized Person. For this reason holding tanks and vault privies are not covered by the SPM.

        The SPM provides semi-prescriptive standards based on the achievement of performance criteria as supported by research. The result of using the standards and guidelines is that systems, when properly operated, will meet or exceed defined performance objectives.


        I- 2.1 Purposes of the manual

        The primary purpose of the SPM is to provide standard practices for the planning, installation, and maintenance of sewerage systems on single parcels of land such that the system will not create or contribute to a health hazard.

        The SPM is not intended to address potential “cumulative impacts” of discharge from multiple systems within a given area (i.e. subdivisions). This aspect is addressed under the Subdivision Regulations, and applicable policies of the Ministry of Community, Sport and Cultural Development.

        The SPM standards and guidelines are intended to support cost effective public health protection. The standards of this manual are presented as “minimum” standards only, not absolute standards. More stringent standards may need to be utilized for challenging systems or to address specific site conditions.

        The SPM is not an Act or Regulation. No standards of the SPM are intended to conflict with any Act or Regulation (including the SSR and the Public Health Act). In all cases where a conflict arises, the Act or Regulation supersedes the SPM.

        The SPM is not a design manual or an educational or training text.


        I- 2.1.1 DEFINITION OF STANDARD PRACTICE

        The Sewerage System Regulation (Part 1) defines standard practice:

        “standard practice means a method of constructing and maintaining a sewerage system that will ensure that the sewerage system does not cause, or contribute to, a health hazard.”

        The SSR relies upon the Authorized Person (AP) to confirm that the sewerage system has been planned and constructed in accordance with standard practice.


        I- 2.1.2 THE SPM AS A SOURCE OF STANDARD PRACTICE

        The SSR identifies the SPM as a source of standard practice:

        In Section 8(3), “To determine whether the plans and specifications filed under subsection (2) (b) are consistent with standard practice, an authorized person may have regard to the Ministry of Health Services' publication "Sewerage System Standard Practice Manual", as amended from time to time.”

        And in Section 9(2), “To determine whether sewerage system construction and a maintenance plan in respect of the sewerage system are consistent with standard practice, an authorized person may have regard to the Ministry of Health Services' publication "Sewerage System Standard Practice Manual", as amended from time to time.”


        These sections of the SSR confirm the SPM as guidance for meeting the standard practice requirement.

      3. ROLES AND RESPONSIBILITIES

        I- 3.1 Stakeholders and Organizations

        Key stakeholders and organizations relevant to the onsite system field of practice and their roles and responsibilities are summarized in Table I- 1 and Table I- 2.

        Table I- 2 shows the relationship of stakeholders and organizations to the SSR and the SPM.

        Table I- 1. SSR related roles and responsibilities


        ORGANIZATION OR STAKEHOLDER

        ROLE

        Ministry of Health

        Responsible for the SSR and maintenance of the BC SPM. Establishes policy for interpretation of the SSR and for Health Authorities.

        Health Authorities and Environmental Health Officers (EHOs)

        Administration of filings. Administration and enforcement of the SSR and the Public Health Act. Investigation and compliance action for the prevention or correction of health hazards caused by onsite systems.

        Receives and responds to complaints about health hazards.

        Association of Professional Engineers and Geoscientists of BC (APEGBC)

        APEGBC regulates the practice of its members and licensees, including those practicing in the area of onsite sewerage systems.

        Applied Science Technologists and Technicians of British Columbia (ASTTBC)


        Registers and regulates the practice of ROWPs

        Authorized Persons (Professional or ROWP)

        Responsible for the planning, installation and maintenance of a sewerage system in accordance with standard practice.


        System Owner

        Required by law to retain an AP (professional or ROWP) to plan, install and maintain the sewerage system (or supervise same), as outlined in the SSR.

        Responsible for operation and maintenance of the system, including retaining an AP to undertake maintenance of the system.

        The system owner may be involved with system installation and maintenance under AP supervision as per SSR section 6(1) (b) and 6(3).


        Table I- 2. Non-SSR related roles and responsibilities


        ORGANIZATION OR STAKEHOLDER

        ROLE

        Health Authorities and Environmental Health Officers (EHOs)

        May respond to referrals for planned subdivisions in relation to sewerage systems.


        Local Government

        May enact bylaws further controlling siting of onsite systems. Have authority to mandate system maintenance, inspection and repair through local bylaws and enforcement activities.

        May integrate decentralized sewerage systems in their waste management planning.

        Provincial Approving Officer (Ministry of Transportation and Infrastructure)

        Subdivision approval in unincorporated areas, considering adequate provision for sewage management as a factor, under the Local Services Act

        Federal Health, Aboriginal Affairs and Northern Development Canada (AANDC) and the First Nations Health Authority (FNHA)

        Onsite systems on First Nations reserve lands are overseen by the First Nations Health Authority. ROWPs must follow the requirements of the Standard Practice Manual and file with the Environmental Health Officer at the local FNHA office.

        Figure I- 1. Process and parties involved in sewerage systems under the SSR


        I- 3.2 Role of the Authorized Person

        The SSR specifies that sewerage systems are to be constructed and maintained only by Authorized Persons (APs) or under their supervision. The SSR defines APs as Registered Onsite Wastewater Practitioners (ROWPs) or Professionals. The Authorized Person (AP) is responsible under the SSR for planning and installation of the system in accordance with standard practice, and is responsible for maintaining a system in accordance with standard practice.


        I- 3.2.1 REGULATORY ASSOCIATIONS FOR AUTHORIZED PERSONS


        I- 3.2.1.1 Registered Onsite Wastewater Practitioners (ROWPs)

        The SSR in s7(1) and s7(2) outlines the qualifications for an ROWP and establishes Applied Science Technologists and Technicians of British Columbia (ASTTBC) as the registering body for Registered Onsite Wastewater Practitioners (ROWPs).

        ASTTBC has established three categories of ROWP as Authorized Persons under the SSR:

        • Planner, responsible for site and soil evaluation and planning of systems.

        • Installer, responsible for installation of systems.

        • Maintenance Provider, responsible for maintenance of systems.

          Through its authority under the ASTT Act, the ASTTBC has implemented policies governing ROWPs. See: http://owrp.asttbc.org/p/documents.php

          ASTTBC maintains a web listing of those members with accreditation as ROWPS. See: http://owrp.asttbc.org/c/finder.php

          I- 3.2.1.2 Professionals

          The SSR s7(3) outlines the qualifications for professionals. Members and licensees of the Association of Professional Engineers and Geoscientists of BC (APEGBC) are professionals under the SSR.

          APEGBC maintains a web roster of those Professionals that have self-declared competence as professionals under the SSR.

          See: http://www.apeg.bc.ca/members/sewerageprolist.html

          APEGBC has published a guide entitled “Professional Practice Guidelines, Onsite Sewerage Systems” (APEGBC Professional Practice Guidelines - Onsite Sewerage Systems).

          The APEGBC Professional Practice Guidelines - Onsite Sewerage Systems provides guidance on professional practice for Professional Engineers, Licensees and Professional Geoscientists who are members or licensees of APEGBC and design or advise on sewerage systems (onsite systems) under the Sewerage System Regulation. The publication guides professionals on site-specific and project-specific design of onsite systems.

          See: https://www.apeg.bc.ca/APEGBC/media/APEGBC/Guidelines-Professional%20Practice/APEGBC- Guidelines-for-Onsite-Sewerage-Systems.pdf


          I- 3.3 Roles of Health Officers or other Health Authority staff

          Health Authorities and Health Officers have statutory authority under the Public Health Act and the Health Authorities Act to:


        • Administer and enforce the Sewerage System Regulation.

        • Issue permits for holding tank systems under the SSR.

        • Carry out compliance and enforcement activities.

        • As an administrative role, accept documents sewerage system filing documents and letters of certification documents for systems and confirm that these meet the documentation standards of the Sewerage System Regulation.

        • Confirm that Authorized Persons plan (via filing), construct (via Letter of Certification) or maintain installed sewerage systems (or supervise these activities).

        • Receive and respond to complaints about health hazards. Make a determination of health hazards related to an onsite sewerage system, and ensure corrective action is taken by responsible parties to alleviate health hazards.

          Health Authorities can review filings at their discretion.


          I- 3.4 Health Hazards

          Refer to the Ministry of Health publication Health Hazard Communication Guideline for information on the roles of the Health Authorities, ASTTBC and APEGBC for the onsite industry.

          http://www.health.gov.bc.ca/protect/pdf/health-hazard-communication-guideline.pdf

          The Public Health Act and the SSR provides the authority for the Health Officer to intervene if a health hazard exists or is anticipated and holds the authority to take compliance and enforcement action. Actions that Health Officers may take include the following:

        • Health Officers may issue Orders requiring compliance within specified time frames. An order can require documents or evidence or prescribe specific actions to avert a health hazard. Examples include repair or replacement of systems, connection to a public sewer, ‘pump and haul’ as an interim measure, discontinued use of a water source, and other remedial actions.

        • Health Officers may defer acceptance of a Filing when information is missing or suspected to be false or misleading. A Filing may also be returned based on a failure to comply with standard practice, or if a Health Officer believes the system will cause a health hazard.

        • Health Officers have discretionary authority to conduct on-site inspections and are responsible to investigate complaints regarding sewerage systems.

          The roles, responsibilities, and communication protocols of Health Officers regarding Filings and sewerage systems can be found in the Health Hazard Communication Guideline.


          I- 3.5 Owner responsibilities

          The owner is responsible for ensuring that the sewerage system is used in the manner it was design for as stated in the filing and maintenance plan (example conforms to defined design flows). The SSR has specific requirements for owners, including the following:

        • Do not cause or contribute to a Health Hazard.

        • Ensure that sewage is discharged into a public sewer, or a permitted holding tank, or an onsite system that complies with all provisions of the SSR or as authorized by another enactment.


        • Ensure the system is used and maintained according to the Maintenance Plan as filed with the Health Authority. Under s.10 of the SSR, homeowners must keep records of maintenance.

        • Only construct or maintain a system on his/her own land if under the supervision of an Authorized Person.


      4. INTRODUCTION TO THE STANDARD PRACTICE MANUAL

        1. 4.1 Organization of the SPM

          The SPM is divided to four volumes:

          Volume I: Introduction

          • Glossary

          • Purposes

          • Instructions for use and application of the manual

          • Administrative context

          • Roles and responsibilities

            Special terms used in this Manual are defined in the glossary.

            Volume II: Standards

          • Practice standards and checklists

          • Site evaluation standards

          • Tables and standards for system planning

          • Specification and installation standards

          • Maintenance and monitoring standards

            This volume is for reference. It includes the key standards of the manual for site evaluation, planning, installation and maintenance. It does not include explanatory or educational material.

            Volume III: Guidelines

          • Explanation, guidance and examples for application of standards

          • Guidance for system planning, installation and maintenance

          • Description of system types

          • Glossary

          • Appendices

            Volume III explains the standards in Volume II and provides guidelines on how to meet those standards. It is intended to be used alongside Volume II. It does not include standards.

            The appendices include key standards tables converted to imperial units.

            Volume IV: Rationale

          • Performance statements

          • Performance objectives

          • Rationale for standards

          • References

        This volume explains the performance basis for the manual and provides rationale for the standards for planning systems in Volume II. It is intended for reference and for those looking for further reading. The text is technical in nature.


        I- 4.2 Cross references and references in the SPM

        Volume II (standards) and Volume III (guidelines) are arranged in the same order for easy cross-referencing. All standards in Volume II have corresponding sections in Volumes III.

        Where references are cited, the full reference is in the bibliography at the end of Volume IV.


        I- 4.3 Application of the SPM by Authorized Persons

        All Authorized Persons must comply with the Sewerage System Regulation. Where an AP has identified the SPM as his or her source of standard practice:

        • The AP is to follow the standards in Volume II.

        • Departures from the guidelines in Volume III are to be supported by written rationale.

        • Volume IV performance statements and objectives are to be considered in any cases where the AP is departing from the guidelines of the manual.


        I- 4.4 Using the Standard Practice Manual

        I- 4.4.1 FOR A TYPICAL DESIGN AND INSTALLATION

        The Authorized Person would use Volume II for:

        • The checklists to ensure procedure standards are met.

        • Standards to select a solution for the particular property and plan the system.

        • Specification and installation standards.

        • Maintenance standards to help develop the maintenance plan. The Authorized Person would use Volume III, alongside Volume II:

        • For an explanation of a standard or for examples.

        • For guidance on selecting a suitable system for a site.

        • For information on how to plan or install particular methods or equipment.

        • Directions to supplemental information, such as design manuals.

        • For guidance on maintenance for a specific system type for inclusion in the maintenance plan.


        1. 4.4.2 DURING SYSTEM MAINTENANCE

          The Authorized Person would use Volume II:

          • For information relevant to updates to a maintenance plan.

          • For minimum procedural standard checklists. The Authorized Person would use Volume III:

          • Where necessary, for description of a system type, how the system works and why it was specified

          • For guidance on maintenance and monitoring for a specific system type.


        I- 4.4.3 FOR HEALTH OFFICERS

        A Health Officer may use the manual when reviewing a system filing or maintenance plan that refers to the SPM as the main source of standard practice.


        The checklists of Volume II may be used to check on documents submitted with a filing or letter of certification.

        Volume IV may be used to provide a background understanding of the performance objectives underlying the manual’s standards.


        I- 4.4.4 FOR OWNERS AND THE PUBLIC

        The manual is intended for use by ROWPs and Professionals. However, an owner may find the manual useful in working with an AP to gain an understanding of his or her system and how best to operate the system.



        SEWERAGE SYSTEM

        STANDARD PRACTICE MANUAL

        VOLUME II - STANDARDS

        VERSION 3 SEPTEMBER 2014

        HEALTH PROTECTION BRANCH

        MINISTRY OF HEALTH

        Volume II Table of Contents

    2. 1.1 How to use this Volume I-1

    II- 1.2 Principles behind the standards ........................................................................................................II-1

  2. 1.2.1 Sewerage system performance ...............................................................................................................II-1

II- 1.2.2 Treatment method .......................................................................................................................................II-3

II- 1.2.3 Dispersal area .................................................................................................................................................II-3 II- 1.2.4 Combined Treatment and Dispersal Systems ...................................................................................II-3

    1. GENERAL STANDARDS ................................................................................................................................. II-5

      II- 2.1 Existing systems and system repair................................................................................................. II-5

      II- 2.1.1 Emergency measures ..................................................................................................................................II-5

      II- 2.1.2 Repair of an existing system ....................................................................................................................II-5

      II- 2.1.3 Upgrading or replacement of an existing system ...........................................................................II-6 II- 2.1.4 New use of existing system ......................................................................................................................II-6

      II- 2.2 Special circumstances ......................................................................................................................... II-6

    2. PROCEDURE STANDARDS ............................................................................................................................. II-7

      II- 3.1 Sewage source characterization and site use ............................................................................... II-7

      II- 3.2 Administration and Regulatory Requirements............................................................................. II-7 II- 3.3 Site and soil evaluation ...................................................................................................................... II-7

      II- 3.3.1 Site evaluation................................................................................................................................................II-7

      II- 3.3.2 Soil evaluation................................................................................................................................................II-7

      II- 3.3.3 Site and soil evaluation report.................................................................................................................II-8

      II- 3.4 Selecting a suitable system based on site conditions ................................................................ II-9 II- 3.5 Plans and specifications ..................................................................................................................... II-9

      II- 3.5.1 Filing documents...........................................................................................................................................II-9

      II- 3.5.2 Minimum standards for construction drawings ............................................................................ II-10

      II- 3.6 Installation ........................................................................................................................................... II-10

      II- 3.7 Letter of Certification, record drawing and as installed specifications ................................ II-10

      II- 3.7.1 Record drawing .......................................................................................................................................... II-10

      II- 3.7.2 Maintenance plan ...................................................................................................................................... II-10

      II- 3.8 Maintenance and monitoring .......................................................................................................... II-11

    3. STANDARDS FOR SELECTING A SYSTEM FOR A SITE ...................................................................................... II-12

      II- 4.1 Dispersal system selection ............................................................................................................... II-12

      II- 4.1.1 Conceptual design..................................................................................................................................... II-12

      II- 4.1.2 Site capability and system selection .................................................................................................. II-12 II- 4.1.3 Steep slopes................................................................................................................................................. II-18

      II- 4.1.4 Climate ........................................................................................................................................................... II-18

      II- 4.1.5 Flood plains .................................................................................................................................................. II-18

      II- 4.1.6 Off-site discharge I-18

      II- 4.2 Treatment method............................................................................................................................. II-19

      II- 4.2.1 Type 1 (septic tank and effluent filter) .............................................................................................. II-19

      II- 4.2.2 Type 2 and 3 treatment systems ......................................................................................................... II-19

    4. STANDARDS FOR PLANNING SYSTEMS ........................................................................................................ II-20

Daily Design Flow...................................................................................................................................................II-20

II- 5.1.1 Confirmation of site use.......................................................................................................................... II-20

II- 5.1.2 Residential Daily Design Flow rates.................................................................................................... II-20

II- 5.1.3 Residential sewage and Type 1 effluent characteristics ............................................................. II-21

II- 5.1.4 Daily Design Flows for non-residential buildings ......................................................................... II-21

II- 5.2 Distribution and dosing....................................................................................................................II-22

II- 5.2.1 Types of distribution as used in the standards .............................................................................. II-22

II- 5.2.2 Dosing standards for uniform distribution systems .................................................................... II-22

II- 5.3 Vertical separation (VS) ....................................................................................................................II-25

II- 5.3.1 Minimum required vertical separation .............................................................................................. II-25

II- 5.3.2 Vertical separation for dispersal systems ......................................................................................... II-25

II- 5.3.3 Vertical Separation for BC Zero discharge lagoons and ETA beds ........................................ II-29

II- 5.4 Horizontal separation .......................................................................................................................II-30

II- 5.4.1 Minimum horizontal separation .......................................................................................................... II-30

II- 5.5 Hydraulic Loading Rate (HLR).........................................................................................................II-34

II- 5.5.1 Soil characteristics for the HLR tables: .............................................................................................. II-34

II- 5.5.2 Hydraulic Loading Rate tables .............................................................................................................. II-35

II- 5.5.3 Hydraulic Loading Rates for sand mounds and sand lined trenches or beds ................... II-37

II- 5.6 Minimum system contour length and Linear Loading Rate ...................................................II-38

II- 5.6.1 System contour length ............................................................................................................................ II-38

II- 5.6.2 Minimum system contour length ........................................................................................................ II-38

II- 5.6.3 Selecting and using linear loading rate (LLR) ................................................................................. II-38

II- 5.6.4 Slopes with concave contour ................................................................................................................ II-41

II- 5.6.5 Minimum system contour length for at grade and raised systems....................................... II-41

II- 5.6.6 Minimum contour length for below grade systems using sand media ............................... II-41 II- 6 SPECIFICATION AND INSTALLATION STANDARDS ........................................................................................ II-42 II- 6.1 Flow monitoring .................................................................................................................................II-42

II- 6.2 Access provisions for maintenance and monitoring ................................................................II-42

II- 6.3 Connections, piping and collection systems...............................................................................II-42

II- 6.3.1 Sewers ............................................................................................................................................................ II-42

II- 6.3.2 Specification and installation ................................................................................................................ II-43

II- 6.4 Tanks, septic tanks and effluent filters, treatment systems ................................................... II-44 II- 6.5 Dispersal systems, general.............................................................................................................. II-46

II- 6.5.1 Sizing I-46

II- 6.5.2 Specification and installation ................................................................................................................ II-46

II- 6.6 Trench infiltration systems ..............................................................................................................II-48

II- 6.6.1 Description ................................................................................................................................................... II-48

II- 6.6.2 Sizing .............................................................................................................................................................. II-48

II- 6.6.3 Specification and installation ................................................................................................................ II-48

II- 6.7 Seepage Bed systems....................................................................................................................... II-49

II- 6.7.1 Description ................................................................................................................................................... II-49

II- 6.7.2 Sizing .............................................................................................................................................................. II-49

II- 6.7.3 Specification and installation ................................................................................................................ II-49

II- 6.8 Shallow, at grade and raised systems ...........................................................................................II-50

II- 6.8.1 Description ................................................................................................................................................... II-50

II- 6.8.2 Sizing .............................................................................................................................................................. II-50

II- 6.8.3 Specification and installation ................................................................................................................ II-50

II- 6.8.4 Toe blankets................................................................................................................................................. II-50

II- 6.9 Gravity distribution............................................................................................................................ II-51

II- 6.9.1 Description ................................................................................................................................................... II-51

II- 6.9.2 Sizing .............................................................................................................................................................. II-51

II- 6.9.3 Specification and installation ................................................................................................................ II-51

II- 6.10 Pressure distribution .........................................................................................................................II-53

II- 6.10.1 Description ................................................................................................................................................... II-53

II- 6.10.2 Sizing .............................................................................................................................................................. II-53

II- 6.10.3 Specification and installation ................................................................................................................ II-53

II- 6.11 Subsurface Drip Dispersal ................................................................................................................II-54

II- 6.11.1 Description ................................................................................................................................................... II-54

II- 6.11.2 Sizing .............................................................................................................................................................. II-54

II- 6.11.3 Specification and installation ................................................................................................................ II-54

II- 6.12 Dosing systems ...................................................................................................................................II-56

II- 6.12.1 Description ................................................................................................................................................... II-56

II- 6.12.2 Sizing .............................................................................................................................................................. II-56

II- 6.12.3 Specification and installation ................................................................................................................ II-56

II- 6.13 At-grade beds .....................................................................................................................................II-58

II- 6.13.1 Description ................................................................................................................................................... II-58

II- 6.13.2 Sizing .............................................................................................................................................................. II-58

II- 6.13.3 Specification and installation ................................................................................................................ II-59

II- 6.14 Alberta At Grade system (AAG)......................................................................................................II-60

II- 6.14.1 Description ................................................................................................................................................... II-60

II- 6.14.2 Sizing .............................................................................................................................................................. II-60

II- 6.14.3 Specification and installation I-60

II- 6.15 Sand mounds and sand lined trenches and beds ......................................................................II-62

II- 6.15.1 Description ................................................................................................................................................... II-62

II- 6.15.2 Sizing .............................................................................................................................................................. II-62

II- 6.15.3 Specification and installation ................................................................................................................ II-63

II- 6.16 Combined Treatment and Dispersal Systems (CTDS)...............................................................II-66

II- 6.16.1 Point of Application .................................................................................................................................. II-66

II- 6.16.2 Basal area and dispersal sizing ............................................................................................................. II-66

II- 6.16.3 CTDS constructed with sand media fill below the Point of Application .............................. II-67 II- 6.16.4 Monitoring.................................................................................................................................................... II-68

II- 6.17 Evapotranspiration (ET) and Evapotranspiration Absorption (ETA) beds ...........................II-68

II- 6.17.1 Description ................................................................................................................................................... II-68

II- 6.17.2 Sizing .............................................................................................................................................................. II-68

II- 6.17.3 Specification and installation ................................................................................................................ II-69

II- 6.18 BC Zero Discharge Lagoons ............................................................................................................II-70

II- 6.18.1 Description ................................................................................................................................................... II-70

II- 6.18.2 Sizing .............................................................................................................................................................. II-70

II- 6.18.3 Specification and installation ................................................................................................................ II-72

II- 6.19 Site drainage .......................................................................................................................................II-72

II- 7 MAINTENANCE AND MONITORING STANDARDS ......................................................................................... II-73

II- 7.1 Maintenance and monitoring frequency .....................................................................................II-73

II- 7.1.2 Maintenance plan ...................................................................................................................................... II-73

II- 7.1.3 Treatment system monitoring .............................................................................................................. II-73

  1. 7.2 Maintenance procedures .................................................................................................................II-73


    Volume II List of Tables

    Table II- 1. Comparison of separate and combined treatment and dispersal systems I-4

    Table II- 2. Where a filing is necessary ............................................................................................ II-5

    Table II- 3. Minimum description of soil characteristics ................................................................. II-8

    Table II- 4. Soil structure and consistence categories ................................................................... II-13 Table II- 5. Situations where gravity distribution systems are allowed or not allowed ................ II-14 Table II- 6. Key constraints for systems......................................................................................... II-16

    Table II- 7. Soil constraints summary ............................................................................................ II-17

    Table II- 8. Minimum Daily Design Flow (DDF) for Residences ..................................................... II-20

    Table II- 9. Per capita Daily Design Flow for Residences ............................................................... II-21

    Table II- 10. Minimum dosing frequency for demand dosing ......................................................... II-23

    Table II- 11. Minimum dosing frequency for timed dosing ............................................................. II-23

    Table II- 12. Micro-dosing frequency, with SPM HLR ...................................................................... II-24

    Table II- 13. Key to minimum required vertical separation tables.................................................. II-25 Table II- 14. For gravity distribution systems .................................................................................. II-26

    Table II- 15. For uniform distribution with demand dosing to native soil or native soil plus less than 30 cm sand fill II-27

    Table II- 16. For uniform distribution with timed or micro-dosing to native soil or native soil plus less than 30 cm sand fill............................................................................................................................... II-27

    Table II- 17. For sand mounds and sand lined trenches and beds .................................................. II-28 Table II- 18. For Subsurface Drip Dispersal (SDD) systems with micro-dosing ............................... II-28 Table II- 19. Minimum required horizontal separation distances................................................... II-31 Table II- 20. Minimum required horizontal separation for BC Zero discharge lagoons .................. II-33 Table II- 21. Soil structure and consistence categories ................................................................... II-35

    Table II- 22. Maximum allowable HLR based on soil type............................................................... II-36 Table II- 23. Maximum allowable HLR based on permeability or percolation rate ........................ II-36 Table II- 24. Maximum allowable sand Media Hydraulic Loading Rates......................................... II-37 Table II- 25. Sand media specifications ........................................................................................... II-37

    Table II- 26. Minimum required contour length for dispersal system ............................................ II-38 Table II- 27. LLR based on soil type (L/day/m) ................................................................................ II-39

    Table II- 28. LLR based on permeability or percolation rate (L/day/m) .......................................... II-40

    Table II- 29. Gravity sewers from building to first tank I-42

    Table II- 30. Cleanouts for gravity sewers ....................................................................................... II-42

    Table II- 31. Pumped discharge of sewage to the septic tank......................................................... II-43 Table II- 32. Septic tanks and effluent filters................................................................................... II-44

    Table II- 33. Tanks and tank access ................................................................................................. II-45

    Table II- 34. Tank installation .......................................................................................................... II-45

    Table II- 35. Aggregate, separation and cover soil layer ................................................................. II-46 Table II- 36. Gravelless systems....................................................................................................... II-47

    Table II- 37. Trench dispersal systems, general............................................................................... II-48

    Table II- 38. Seepage Bed dispersal systems ................................................................................... II-49

    Table II- 39. Shallow, at grade, raised trench and Seepage Bed systems ....................................... II-50 Table II- 40. Gravity system piping .................................................................................................. II-51

    Table II- 41. Trickling gravity systems.............................................................................................. II-51

    Table II- 42. Dosed Gravity systems ................................................................................................ II-52

    Table II- 43. Pressure distribution systems ..................................................................................... II-53

    Table II- 44. Subsurface drip dispersal ............................................................................................ II-54

    Table II- 45. Subsurface drip dispersal, filtration, dosing and flushing ........................................... II-55 Table II- 46. Pump chambers (tanks)............................................................................................... II-56

    Table II- 47. Siphons and floating outlet devices ............................................................................ II-57 Table II- 48. At-grade beds .............................................................................................................. II-59

    Table II- 49. Alberta At Grade systems ............................................................................................ II-60

    Table II- 50. Alberta At Grade systems, cover and installation ....................................................... II-61

    Table II- 51. Sand Mounds and sand lined trenches or beds .......................................................... II-63

    Table II- 52. Sand mounds and sand lined trenches or beds, cover................................................ II-64 Table II- 53. Bottomless sand filters ................................................................................................ II-64

    Table II- 54. Sand mounds and sand lined trenches and beds, dosing and distribution................. II-64 Table II- 55. Sand mounds and sand lined trenches and beds, installation .................................... II-65 Table II- 56. ET and ETA beds .......................................................................................................... II-69

    Table II- 57. Rectangular Lagoon Cell Sizing—Wetter Northern Interior BC................................... II-70

    Table II- 58. Rectangular Lagoon Cell Sizing—Drier Northern Interior BC ...................................... II-71

    Table II- 59. Circular Lagoon Cell Sizing Standards—Northern B.C. ................................................ II-71

    Table II- 60. BC zero discharge lagoons, general I-72

    Table II- 61. Site drainage (interception or relief drains) ................................................................ II-72 Table II- 62. Minimum initial frequencies for maintenance and monitoring.................................. II-73


    Volume II Standards

    1. INTRODUCTION

      II- 1.1 How to use this Volume

      Volume II contains this Manual’s standards of practice for onsite sewerage systems in British Columbia. This volume is intended to be used for reference, refer to Volume III for explanations. The AP may wish to have a copy of this Volume readily available for easy reference.

      The main sections in Volume II (e.g. II-2.1) have corresponding sections in Volume III (e.g. III-2.1).

      Use Volume III alongside Volume II for explanatory information and examples. Cross references are not given to Volume III.

      Volume I includes a glossary with definitions of special terms used in this Manual. The appendix to Volume III includes key standards tables converted to imperial units.

      II- 1.2 Principles behind the standards

      The Sewerage System Regulation (SSR) defines a sewerage system as “a system for treating domestic sewage that uses one or more treatment methods and a discharge area, but does not include a holding tank or a privy.” According to this definition, a sewerage system has two components (Figure II- 1):

      • one or more treatment method(s); and

      • a discharge area.

      Both components of the sewerage system play a role in treating the sewage, but are addressed in different ways in the SSR and therefore, in this Manual.


      II- 1.2.1 SEWERAGE SYSTEM PERFORMANCE

      The purpose of a sewerage system is to treat the sewage to an acceptable level of quality by the time it reaches the limiting layer. For the purposes of this manual, this limiting layer is also known as the base of the specified vertical separation standard. The standards developed for this manual are based on the effluent being treated to, at minimum, recreational water quality objectives at the limiting layer (see Volume IV Section IV- 2.2 (Performance requirements and objectives)).

      This level of effluent quality is to be achieved regardless of the treatment method (Type 1, 2, or 3 in the SSR) or dispersal method employed, and is universally applied to all sewerage systems that fall under the SSR. In other words, the standards for all sewerage systems are based on reaching the same water quality objectives at the limiting layer as illustrated inFigure II- 1 and Figure II- 2. Note that the objectives were used to develop the standards of this Manual only and are not a monitored requirement of the SSR.


      Figure II- 1. Sewerage system key components and concepts: separated system


      Figure II- 2. Sewerage system key components and concepts: combined system


      II- 1.2.2 TREATMENT METHOD

      The treatment method is the treatment system that precedes the dispersal area. Typically this consists of a septic tank (type 1) or a package treatment plant (type 2 or 3), and is defined in the SSR as:

      “(a) Type 1 is treatment by septic tank only,

      1. Type 2 is treatment that produces an effluent consistently containing less than 45 mg/L of total suspended solids and having a 5 day biochemical oxygen demand of less than 45 mg/L, and

      2. Type 3 is treatment that produces an effluent consistently containing less than 10 mg/L of total suspended solids and having

        1. a 5 day biochemical oxygen demand of less than 10 mg/L, and

        2. a median fecal coliform density of less than 400 Colony Forming Units per 100 mL.”

      Package treatment plants come in a variety of configurations, and may also include Combined Treatment and Dispersal Systems, which combine both the treatment method and discharge area together (see Section II- 1.2.4). The point at the end of the treatment method and before the discharge area is referred to as, for the purposes of the SPM, the “point of application (POA)”. It is at this point where the water quality must meet the treatment method water quality standards outlined in the SSR to the defined treatment method (for example, Type 2). It is up to the AP to decide the treatment method to be applied.

      Treatment continues in the dispersal area as soil based treatment. The treatment method type (1, 2, or 3) selected influences which dispersal area standards will be used.


      II- 1.2.3 DISPERSAL AREA

      Dispersal areas are defined in the SSR as “an area used to receive effluent discharged from a treatment method.”

      In the past, the dispersal area was commonly considered as a means of getting the effluent into the ground (“disposal”). However, more importantly than disposal, the dispersal area is responsible for treatment for the wastewater as it travels through the soil column to the base of the vertical separation.

      The standards of this Manual were developed in recognition of this soil based treatment and aim to achieve the recreational water quality objectives at the base of the vertical separation, while accounting for the long term acceptance rates of the soil. It is because of these factors this Manual provides differing dispersal area standards for different treatment methods, soil types, and dispersal methods. Simply disposing of effluent is not the intention of the standards for dispersal areas, nor are dispersal areas (including sand mounds) intended to meet specific treatment method (Type 1, 2, 3) SSR standards.


      II- 1.2.4 COMBINED TREATMENT AND DISPERSAL SYSTEMS

      A sewerage system consists of one or more treatment method(s) and dispersal area. These may be in the form of two discrete components (Figure II- 1), with a tank based treatment method and a soil based dispersal area.

      Combined Treatment and Dispersal Systems (CTDS) typically marry the two discrete components into one unit. However, the expectations of a CTDS system (Table II- 1) are identical to those of a conventional sewerage system as illustrated in Figure II- 1. See Section II- 6.16 for more on CTDS.


      Table II- 1. Comparison of separate and combined treatment and dispersal systems


      PARAMETER

      SEPARATE TREATMENT AND DISPERSAL SYSTEMS

      COMBINED TREATMENT AND DISPERSAL SYSTEM

      Treatment method

      Septic tank or discrete treatment system (e.g. package treatment plant)

      Package treatment and dispersal system


      Point of application

      Between outlet of treatment system and dispersal area, typically the infiltrative surface (with effluent quality monitoring at, for example, the pump chamber).

      Point where effluent quality meets Type 2 or 3 SSR standards (where applicable).


      Point in package system where effluent quality meets Type 2 or 3 SSR standard and where that quality level is monitored

      Dispersal area

      Separate dispersal system, for example trenches, seepage bed or sand mound

      Dispersal directly below and or around the treatment system.

      Water quality objective at the base of the dispersal area vertical separation


      Recreational water quality objectives established in Section IV- 2.2.

      As wastewater is treated through the CTDS, there is a point where the wastewater quality consistently meets the Type 2 or 3 standards of the SSR. This point is considered the point of application, just as it is for conventional treatment methods. CTDS systems are commonly third party certified based of testing of the complete CTDS system at a singular sampling point. The point of application should be identified by the AP based on testing information provided by the CTDS manufacturer.

      The SPM design standards for dispersal systems apply at the point of application. As with all sewerage systems, the intention of the SPM standards as applied to CTDS systems is that, at the base of the vertical separation, the wastewater quality meets the recreational water quality objectives established in Volume IV Section IV- 2.2.


    2. GENERAL STANDARDS

      II- 2.1 Existing systems and system repair

      II- 2.1.1 EMERGENCY MEASURES

      When a risk to health exists, notify the Health Authority immediately.

      When a risk to health exists, under an emergency, an Authorized Person may carry out immediate repairs and remedies as well as source mitigation to eliminate the risk in cooperation with the owner. This may include temporary measures that fall short of strict adherence to SPM standards. These measures may be taken without first submitting Filing documents to the Health Authority.

      Maintain the function of that system until permanent repairs or replacements can be carried out under a filing.


      II- 2.1.2 REPAIR OF AN EXISTING SYSTEM

      Refer to Table II- 2 for instruction on when to file documents with the Health Authority.

      Table II- 2. Where a filing is necessary


      NO FILING REQUIRED - Component Repair or Replacement includes the following:

      FILING REQUIRED - System Repair or Replacement includes the following:

      • Maintenance, including cleaning of components and cleaning or replacement of media in treatment units, flushing, vacuuming or jetting of dispersal laterals or other piping

      • Replacement of liquid level float switch or transducer

      • Replacement of a pump with one equivalent to the original

      • Replacement of D-box or other distribution device

      • Installation or replacement of tank inlet or outlet fittings or baffles

      • Installation or replacement of effluent filters

      • Installation or replacement of high level alarms

      • Replacement of short sections of pipe when the pipe is broken or damaged or not functioning as intended

      • Repair of a tank, including leak repairs, new lid and seal, new risers

      • Installation of new tank risers and lids.

      • Construction of additional area of infiltrative surface such as new dispersal trenches or extensions to existing trenches/bed.

      • Removal of biomat or existing aggregate or soil or sand followed by replacement of aggregate or chambers.

      • Upgrading a gravity dispersal system from trickle gravity to pump to D-box configuration

      • Replacement of existing tank (including septic, pump chamber, treatment plant, flow equalization tank)

      • Addition of a secondary septic tank, flow equalization tank, grease interceptor or treatment plant/device

      • Retro-fitting treatment devices

      • Replacement of the treatment and or dispersal system.

      See Section II- 2.1.2.2 for specific policy on horizontal separation to wells in repair situations. In all cases ensure that the repair does not cause or contribute to a health hazard.

      For all repairs:

      • Assess and document all components of the sewerage system

      • Confirm the Daily Design Flow.


        II- 2.1.2.2 System repair and horizontal separation to drinking water well

        The Ministry of Health Sewerage System Policy for Setback from Wells Based on Repairs or Alterations allows for repair or installation of replacement system components, for example tanks, where setbacks to the nearest well does not comply with the Sewerage System Regulation (SSR). This allowance is limited to systems where:

      • Daily Design Flow is not changed (so no expansion of use), and

      • The existing system was installed in accordance with legislation prior to June 25th 2010.

        The policy exempts these systems from the requirements of section 3.1 of the SSR, including installing extra septic or treatment tanks.

        http://www.health.gov.bc.ca/protect/pdf/sewerage-system-repair-policy.pdf


        II- 2.1.3 UPGRADING OR REPLACEMENT OF AN EXISTING SYSTEM

        When upgrading a system for a new use or for a higher Daily Design Flow or when replacing the system, plan the system to comply with the standards in this volume.


        II- 2.1.4 NEW USE OF EXISTING SYSTEM

        When assessing an existing sewerage system for a new use:

        Assess and document all components of the system.

        Measure or estimate the vertical separation in the dispersal area

        Estimate the Daily Design Flow for the new use

        Establish whether the existing system meets standards for the new use, and

        Document the upgrades needed to comply with standards.


        II- 2.2 Special circumstances

        See Volume III for guidance on the following special circumstances:

      • Systems that will be used seasonally.

      • Systems in isolated or restricted access areas.

      • Off grid systems.

      • Multiple homes on the same property.

      • Use of adjacent property (off-site discharge).


    3. PROCEDURE STANDARDS

      The following procedure standards indicate the minimum steps for site evaluation, planning, installation, and maintenance.

      The checklists also show the minimum paperwork standards to document the system. Retain these documents in the project files. See Sections II- 3.5.1 (filing documents) & II- 3.7 (letter of certification) for documents to be submitted to the Health Authority.


      II- 3.1 Sewage source characterization and site use

      Inform the owner of their responsibilities

      Gather information on the property and use (owner declaration)

      Select Daily Design Flow (DDF) and record how the flow was selected

      Evaluate the type of source of sewage

      Analyze the pattern of water use.


      II- 3.2 Administration and Regulatory Requirements

      Check for other regulations that may apply for this system

      Check for any Health Orders for the property or sewerage system

      Identify any easements, covenants, or building schemes that may affect the system

      Check for development permits that affect the sewage system

      Check whether the SSR requires that a Professional design or review the sewage system


      II- 3.3 Site and soil evaluation

      II- 3.3.1 SITE EVALUATION

      Confirm the location of legal boundaries, covenants and easements.

      Identify relevant horizontal separation distances, including to drinking water sources, water courses and potential breakout

      Locate buried infrastructure (services)


      II- 3.3.2 SOIL EVALUATION

      For the potential dispersal and receiving area:

      Investigate and describe the soil profile in the proposed dispersal area

      When logging the soil profile in test pits:

      Describe the soil properties according to Table II- 3

      Identify any special soils that may constrain system selection (see Section II- 4.1.2.2)

      Excavate test pits deep enough to confirm the vertical separation for the proposed system

      Identify the planned location and depth of the infiltrative surface (e.g. trench base)


      Measure the soil permeability in a minimum of four locations or conduct a minimum of four percolation tests in the dispersal area at the planned depth of the infiltrative surface

      If the soil, at the planned infiltration surface, has a moist consistence of Firm or stronger (or dry consistence of Moderately Hard or stronger, or is Very Weakly Cemented or stronger), then complete at least 6 permeability or percolation tests in that soil horizon.

      If the soil, at the planned infiltration surface, has platy structure, complete at least 6 permeability or percolation tests.

      Table II- 3. Minimum description of soil characteristics


      SOIL CHARACTERISTIC

      MINIMUM DESCRIPTION

      Texture

      Structure

      Consistence

      Coarse fragments

      Percentage of soil particles larger than 2 mm for each soil layer

      Rooting depth

      Maximum observed depth of roots

      Colour

      Simplified soil colours, for each soil layer.

      Mottling or gleying

      Depth range of observed mottling or gleying

      Restrictive layer

      Depth to low permeability layer; description of that layer (texture, structure, consistence)

      Water table or Seasonal High Water Table

      Depth or estimated depth

      Limiting layer

      Depth or estimated depth

      Moisture or seepage

      Dry, moist or wet and depth to seepage, for each soil layer

      Fill

      Depth and description of each distinct layer of fill (texture, structure, consistence)

      Soil profile

      Depth from surface to top and bottom of each distinct layer (horizon)


      II- 3.3.3 SITE AND SOIL EVALUATION REPORT

      The site and soil evaluation report is to include, at a minimum:

      A site plan (to scale or showing all relevant dimensions from an identified point) showing all site information needed to plan the system, including:

      Property lines, easements and covenants

      The location of test pits and permeability tests

      The location of all existing and proposed features relevant to dispersal area siting and horizontal separations (on the lot and on neighbouring properties)

      Horizontal separation distances

      Indication of slopes

      Text or tables, that include the following:

      A description of the soil profile (test pit logs)

      Results of soil permeability or percolation testing


      An estimation of the depth to water table on the date of the evaluation and the estimated Seasonal High Water Table (SHWT)

      Depth to an observed limiting layer in the soils

      Site vegetation

      Any special climate or soils factors

      A summary or list of easements, covenants, rights of way, relevant zoning or development permit(s) information, Riparian Area information, health orders etc. that may affect the system


      II- 3.4 Selecting a suitable system based on site conditions

      Match the selected system to the site conditions, and record the reasons for selecting the system. This includes the following steps:

      Assess the capability and constraints of the dispersal site

      Choose the depth or height of the infiltration surface that will meet the standard for vertical separation

      Select an appropriate soil type and permeability for use in system selection and sizing

      Select a type of system and layout that is suitable for that particular dispersal site, considering the constraints of that site.

      Calculate the area, length and width of the dispersal area to meet the standards (sizing and layout)

      Briefly record the reasons for the type of system and layout selected.


      II- 3.5 Plans and specifications

      Draw the plans and write the specification. Keep all calculations and supporting reports on file.


      II- 3.5.1 FILING DOCUMENTS

      Before construction (including repair) of a sewerage system, the AP must submit filing documents to the Health Authority with, at least the following:

      Health Authority filing form and fee (see s. 8(2) of the SSR)

      Site and soil evaluation report and attachments

      Record of design

      Drawings for construction

      Specifications

      Daily Design Flow and type and quality of influent

      Hydraulic loading rates

      Supporting hydrogeology report if reducing a horizontal separation to a drinking water well (see s. 3.1 of the SSR)

      Any other information specifically required by the Health Authority


      II- 3.5.2 MINIMUM STANDARDS FOR CONSTRUCTION DRAWINGS

      Show system features with a level of detail adequate to construct the system, including:

      A title, with identification of the property, reference to any specifications, date and revision number

      Plan drawing with all relevant features shown accurately with respect to the parcel boundaries. Draw to scale, with a scale bar and true north meridian, or if not to scale show all relevant dimensions.

      The location of all components, with horizontal separations shown on the drawing or as measurements

      One or more permanent “survey control points” (e.g. property pin)

      Detail drawings of the system that show the key features to the installer.

      A cross section showing the planned elevations of the trenches and the sand media depth, if any, and showing the vertical separation, restrictive layer, and water table.

      For simple systems the construction drawing can be combined with the site evaluation drawing.


      II- 3.6 Installation

      Install the system according to the drawings and specifications

      Keep records of installation (photographs, notes)

      File amendments for any significant changes to the plans or specifications

      Commission the system and record system information for the maintenance plan

      Measure system component locations for the record drawing

      Where an AP other than the filing AP installs the system:

      The owner retains the planner or designer to review the installation for conformance with the drawings and specifications. Keep records of this review.

      The installer provides the filing AP with information on the installed system.


      II- 3.7 Letter of Certification, record drawing and as installed specifications

      Within 30 days of completing construction, submit the letter of certification, record drawing and maintenance plan to the Health Authority (see s.9 of the SSR).

      Provide a copy of the record drawing, maintenance plan and letter of certification to the owner (see s. 9(1) (a) of the SSR).


      II- 3.7.1 RECORD DRAWING

      Show the system on a record drawing that meets the general standards of the construction drawing, is understandable by the maintenance provider and is adequate to locate all system components.

      Attach any revised specifications if changes were made from the original drawings and specifications.


      II- 3.7.2 MAINTENANCE PLAN

      Write a maintenance plan, including:

      A statement of the allowable average flow for any 30 day period (the maximum allowable average flow is 50% of DDF where Table II- 8 or Table II- 9 DDF values (page II-20, II-21) are used).


      Operation manual for the system

      A schedule for maintenance and monitoring including prescribed maintenance tasks

      Contact information and emergency contact information for the AP who filed the system, the installer, a maintenance provider and the electrician

      Information and advice for the system owner.

      Sign off by owner that they have received and understood the requirements of the plan


      II- 3.8 Maintenance and monitoring

      When maintaining a system:

      Maintain the sewerage system according to the maintenance plan and the standards in this Manual.

      Confirm safe access for ongoing maintenance and monitoring

      Confirm the safety of the sewerage system including, but not limited to, physical, electrical and biological hazards.

      Confirm that the sewerage system is performing as intended.

      Write a brief report on each maintenance activity.

      Report all maintenance to the owner (with owner acknowledgement or “sign off”).

      Report all suspected health hazards to the Health Authority.


    4. STANDARDS FOR SELECTING A SYSTEM FOR A SITE

      Sewerage systems consist of two components under the SSR: a treatment method and a discharge area (dispersal area). The dispersal system is used to distribute effluent from the treatment method into the discharge area. The dispersal area is distinct from the “treatment method”, and any additional treatment that is achieved by the dispersal area is not considered in the treatment method classification (Type 1, 2 or 3).

      When planning a sewerage system, first consider the simplest design options (example, Type 1 treatment method with gravity seepage bed dispersal system), and increase design complexity only where site conditions necessitate it.


      II- 4.1 Dispersal system selection

      II- 4.1.1 CONCEPTUAL DESIGN

      When selecting a dispersal system, document the selection of the system as follows:

      Determine the soil structure and consistence category using Table II- 4. Check soil and site conditions to Table II- 5, Table II- 6 and Table II- 7; and

      Check the required vertical separation (VS) and VS options, following Section II- 5.3; and

      Check Section II- 6 and Volume III Section III-6 for standards and guidelines for the types of sewerage system proposed.


      II- 4.1.2 SITE CAPABILITY AND SYSTEM SELECTION


      II- 4.1.2.1 Soil characteristics for the site capability tables:

      • The site capability tables (starting on the following page) apply to the soil characteristics of the horizon in which the infiltration surface will be placed, as well as the characteristics of the underlying soil.

      • When using the tables below, determine the soil horizon within 30cm below the infiltrative surface that will result in the most conservative system design. Use this soil type with the site capability tables.

      • For soil types or conditions identified in the tables as restrictive or limiting layers, consider all soil horizons when establishing the restrictive or limiting layer.

      • Establish the soil structure and consistence category for each soil horizon being considered, following Table II- 4.


        Table II- 4. Soil structure and consistence categories


        MOIST CONSISTENCE

        LOOSE TO FRIABLE

        FIRM

        VERY FIRM OR STRONGER

        OR CEMENTATION

        NON CEMENTED EXTREMELY WEAKLY CEMENTED

        VERY WEAKLY CEMENTED

        WEAKLY CEMENTED OR STRONGER

        OR DRY CONSISTENCE

        LOOSE TO SLIGHTLY HARD

        MODERATELY HARD

        HARD OR STRONGER

        STRUCTURE




        Single grain (structure-less) soils

        F

        P

        NA

        Strong or moderate grade: Granular, Blocky or Prismatic

        F

        P

        NA

        Weak grade: Granular, Blocky or Prismatic

        P

        VP

        NA

        Weak grade Platy structure

        (and Sandy Loam or Loam)

        P

        VP

        NA

        Weak grade Platy structure, all other soils

        VP

        VP

        NA

        Moderate or Strong grade Platy structure

        NA

        NA

        NA

        Massive (structure-less) soils

        VP

        VP

        NA

        F=Favorable, P=Poor, VP=Very Poor, NA=Not allowed.

        Notes:

      • See Volume III for information on Single Grain versus Massive structure-less soils.

      • If the category is “NA” then the soil horizon is a restrictive layer, and unsuitable for dispersal, regardless of texture and permeability. The soil horizon may be suitable for an ETA bed or BC zero discharge lagoon.

      • Structure and consistence (rupture resistance) descriptions follow USDA methodology.


      II- 4.1.2.2 Site capability tables

      In the following tables, “NA” means not allowed under the standards of this Manual.

      The site capability tables are intended to be used in sequence. Work down through the tables and record each constraint found.


      Table II- 5. Situations where gravity distribution systems are allowed or not allowed


      SOIL TYPE, SITE CONSTRAINT OR PLANNED TYPE OF SYSTEM


      OTHER FACTORS

      GRAVITY DISTRIBUTION?

      Very or Extremely Gravelly Sand or Coarse Sand


      Not Allowed

      Gravelly Sand, Coarse Sand, Loamy Coarse Sand, Sand and Loamy Sand

      And where vertical separation (VS) is at least 150cm in native soil (can include blinding layer)


      Allowed


      Fine Sand, Loamy Fine Sand, Sandy loam, Loam

      And Type 1 effluent HLR, where VS is at least 90cm in native soil (can include blinding layer)


      Allowed

      And Type 2 effluent HLR, where VS is at least 120 cm in native soil (can include blinding layer)


      Allowed


      Silt Loam, Silt

      And where VS is at least 120 cm in native soil (can include blinding layer)


      Allowed


      Clay loam;, sandy clay loam; silty clay loam; Sandy clay, silty clay or clay

      And dispersal to an ET bed or ETA bed or to a lagoon

      Allowed

      And dispersal to any other than an ET bed or ETA bed or to a lagoon

      Not Allowed


      Not Allowed

      o Kfs > 1,500 ≤ 17,000 mm/day

      And where vertical separation (VS) is at least 150cm in native soil (can include blinding layer)


      Allowed


      And Type 1 effluent HLR, where VS is at least 90cm in native soil (can include blinding layer)


      Allowed

      And Type 2 effluent HLR, where VS is at least 120 cm in native soil (can include blinding layer)


      Allowed


      And dispersal to an ET bed or ETA bed or to a lagoon

      Allowed

      And dispersal to any other than an ET bed or ETA bed or to a lagoon

      Not Allowed

      • Kfs > 17,000 mm/day

      • Or Perc rate faster than 0.5 min/inch

      • Or Perc rate 0.5 min/inch to less than 5 min/inch

      • Kfs ≤ 1,500 mm/day

      • Or Perc rate 5 min/inch or slower

      • Kfs < 150 mm/day

      • Or Perc rate slower than 60 min/inch


      SOIL TYPE, SITE CONSTRAINT OR PLANNED TYPE OF SYSTEM

      OTHER FACTORS

      GRAVITY DISTRIBUTION?

      The coarse fragment content of the soil is more than 60% (soil particles larger than 2 mm).


      Not Allowed

      The planned system has sand media below infiltrative surface or Point of Application (see Section II- 6.16.1)

      Other than blinding layer

      Not Allowed

      The planned system is an above grade system


      Not Allowed

      The planned system uses a blinding layer*

      See footnote

      Allowed


      The land slope is over 15% in the dispersal area

      And trickling gravity

      Not Allowed

      And dosed to D-box or splitter tee

      Not Allowed

      And dosed to sequential trenches or using a pressure manifold

      Allowed


      The total planned infiltrative surface exceeds 100 m2

      And trickling gravity

      Not Allowed

      And Dosed gravity

      Allowed

      Note: * A blinding layer is a layer of Clean Coarse Sand or Mound Sand that is installed between the infiltration surface (bottom of aggregate, base of chamber etc.) and the native soil, and which is up to 10 cm thick.


      Table II- 6. Key constraints for systems



      SYSTEM TYPE


      THIS TYPE OF SYSTEM IS NOT ALLOWABLE IF:

      Trench systems

      Raised systems, sand mounds & at-grade beds

      The land slope in the dispersal area is more than 25%

      Trickling gravity distribution

      The land slope in the dispersal area is more than 15% (except ET beds or ETA beds with sequential distribution)

      Dosed gravity, dose to D- Box or splitter tee

      The land slope in the dispersal area is more than 15%


      Alberta at Grade (AAG) systems


      Type 1 below grade Seepage Beds, Type 1 sand lined beds and Type 1 bottomless sand filters.

      Seepage Beds, sand lined beds and bottomless sand filters

      The land slope in the dispersal area is more than 15%


      BC zero discharge lagoons

      The property is smaller than 1.6 Ha

      The land slope is more than 12%

      There is no annual net positive evaporation

      The VS is less than 90 cm to SHWT or to a soil type or layer with Perc or permeability unsuitable for a lagoon


      ETA beds

      There is no annual net positive evapotranspiration

      The VS is less than 90 cm to SHWT or to a soil type or layer with Perc or permeability unsuitable for an ETA bed

      ET beds

      The annual net positive evapotranspiration is less than 600 mm

      • The land slope in the dispersal area is more than 45%

      • Or more than 25% and the vertical separation is less than 90 cm

      • Treatment method is Type 1,

      • Or The land slope in the dispersal area is more than 15%,

      • Or The soil profile has less than 5 cm of undisturbed L-F-H horizon, or equivalent,

      • Or The site is not forested.

      • The soil at the infiltrative surface is Loam, Silt Loam, Silt, Clay Loam, Sandy Clay Loam, Silty Clay Loam, Sandy Clay, Silty Clay or Clay,

      • Or the soil at the infiltrative surface is Loamy Sand, Fine Sand, Loamy Fine Sand, Sandy Loam, Fine Sandy Loam with a structure and consistence category of Poor or Very Poor,

      • Or The median Kfs is less than 250 mm/day,

      • Or The median Perc rate is slower than 40 min/inch

      • The median Kfs is greater than 150 mm/day,

      • Or The median perc rate is faster than 60min/inch

      • The median Kfs is greater than 150 mm/day,

      • Or The median perc rate is faster than 60min/inch


      Table II- 7. Soil constraints summary



      SOIL

      STRUCTURE AND CONSISTENCE CATEGORY


      CONSTRAINING FACTOR


      REQUIREMENTS (IN ADDITION TO OTHER STANDARDS)


      F or P

      Very high permeability, risk of bypass flow and reduced treatment


      Uniform distribution with Timed or micro-dosing1


      Clay loam; Sandy Clay Loam; Silty Clay Loam*

      F or P

      Low permeability and risk of bypass flow

      Uniform distribution with Timed or micro-dosing1

      VP

      Restrictive layer4

      Lagoon, ET bed or ETA bed



      Any


      Low permeability


      Sandy Clay, Silty Clay, Clay2


      F


      Low permeability, and risk of bypass flow


      Sandy Clay, Silty Clay or Clay soils2


      P


      Very low permeability and infiltration capacity


      Sandy Clay, Silty Clay or Clay soils


      VP


      Restrictive layer4


      Lagoon, ET bed or ETA bed


      Any


      Restrictive layer4


      Lagoon, ET bed or ETA bed




      Soil with significant amounts of expandable clay minerals3

      Restrictive layer4

      Lagoon, ET bed or ETA bed

      Organic soils

      Limiting layer4

      ET bed

      Soil structure and consistence category shows as “NA”

      Restrictive layer4

      Lagoon, ET bed or ETA bed


      High coarse fragment (c.f.) content (in any soil type)

      (c.f. are soil particles larger than 2 mm)

      c.f. > 35%

      Reduced soil treatment

      Reduce HLR and HAR, see Volume III for calculation.


      c.f. > 60%

      Reduced soil treatment, risk of bypass flow

      c.f. ≥ 90%

      Limiting layer4

      ET bed

      • Very or Extremely Gravelly Sand or Coarse Sand

      • Or Kfs >17,000 mm/d

      • Or Perc rate faster than 0.5 min/inch

      • Kfs 75 to 150 mm/day2

      • Or Perc rate 60 to 120 min/inch*

      • Uniform distribution with micro- dosing

      • Or sand mound with Timed dosing,

      • Or Lagoon, ET bed or ETA bed

      • Uniform distribution with Timed or micro-dosing and Type 2 or 3,

      • Or sand mound with Timed dosing,

      • Or Lagoon, ET bed or ETA bed

      • Uniform distribution with micro- dosing and Type 2 or 3 and minimum 30 cm sand media below infiltrative surface

      • Or Lagoon, ET bed or ETA bed

      • Kfs ≤ 75 mm/day

      • Or Perc rate 120 min/inch or slower

      • Reduce HLR and HAR and

      • Uniform distribution and

      • Timed or micro-dosing1


      Notes:

      1 Use timed or micro-dosing for any fill or raised system, sand mound, or sand lined trench or bed as well as for systems dispersing directly to the native soil in these categories.

      2 Alberta At Grade (AAG) systems are suitable for low permeability soils in these categories if the site and system meet all other requirements of Table II- 6.

      3 See Volume III, Sections III- 4.1.2.2.(d) and III- 3.3.2.4 for guidance on expandable clay soils.

      4 See Glossary for definition of “restrictive” and “limiting” layer.

      • Where a sand mound or sand lined trench/bed is used the soil type refers to the basal area (the native soil infiltrative surface area).

      • For raised or fill systems (other than sand mounds or sand lined trenches and beds) follow standards for the native soil.

      • An ET bed may be used on any soil (or on a site without soil) if climate is suitable.

      • See Volume III, Section III- 4.1.2.2.(e) for guidance on soils with prismatic and Section III- 4.1.2.2.(f) for platy structured soils.

      • See Volume III, Section III- 4.1.2.2.(b) for guidelines for adjusting HLR and HAR for coarse fragment content. Also see Volume III Section III- 5.2.2.2.(d) for adjustment of micro-dosing frequency.


        II- 4.1.3 STEEP SLOPES

        Table II- 5 and Table II- 6 indicate constraints to system types due to slope. See Volume III for further guidance on slopes and dispersal systems.


        II- 4.1.4 CLIMATE

        See Volume III for guidance on planning systems for cold climate and high rainfall sites.


        II- 4.1.5 FLOOD PLAINS

        Ensure the infiltrative surface of a trench or bed system or the basal area of a sand mound is at least 60 cm above the 1 in 20 year flood level. Place tanks and treatment facilities outside of a previously known or mapped 1 in 20 year flood level. This restriction does not apply where the land is protected from flooding by dykes.

        Where no part of the lot is available for the dispersal area outside of the flood plain, a system can be constructed or repaired in the 1 in 20 year flood plain. However:

      • Ensure any vent or electrical connection is be above the 1 in 20 year flood plain.

      • Do not install a sand mound in the flood plain.

      • For a BC zero discharge lagoon, ensure that the berm top elevation is a minimum of 30 cm above the 1 in 100 year flood level.


        II- 4.1.6 OFF-SITE DISCHARGE

        See Volume III, Section III- 2.2.5 for guidelines on locating a dispersal system on another property.


        II- 4.2 Treatment method

        Sewerage systems consist of two components under the SSR: a treatment method and a discharge area. The treatment method consists of a treatment system which will achieve standards for Type 1, 2 or 3 treatment method, as stipulated in the Sewerage System Regulation. The treatment method is a separate entity from the “discharge area”, which also imparts treatment but has the primary function of effluent dispersal.


        II- 4.2.1 TYPE 1 (SEPTIC TANK AND EFFLUENT FILTER)

        See Section II- 6.4 for septic tank and effluent filter standards.


        II- 4.2.2 TYPE 2 AND 3 TREATMENT SYSTEMS


        II- 4.2.2.1 Selection of Type 2 or 3 treatment systems

        Select an appropriate treatment system that will reliably produce the specified effluent type when operating under site specific conditions. While third party certified treatment systems provide a level of confidence that the system will perform as stated, certification alone provides no assurance of performance under site specific conditions. Consideration of other factors, such as occupancy patterns, sewage characteristics, location and climate are necessary.

        See Volume III for guidance. Document how the treatment system was selected.

        See Section II- 6.16 for information on combined treatment and dispersal systems (CTDS).


        II- 4.2.2.2 Performance monitoring

        Ensure any treatment system (including Combined Treatment and Dispersal Systems) is specified with provisions for easy access for monitoring of effluent quality. For accredited (CSA, BNQ, NSF) and non- accredited products, technologies, and components, utilize an appropriate effluent sampling protocol to verify that the required effluent quality will be achieved for the given (site-specific) conditions.


        II- 4.2.2.3 Documentation in maintenance plan

        Include product details and methods of monitoring and maintenance within the maintenance plan so this information is available to the maintenance provider.


    5. STANDARDS FOR PLANNING SYSTEMS

      The standards in this section are internally linked and are linked to the system selection standards of Section II- 4 and the specification and installation standards of Section II- 6.

      The standards of this Manual are intended for use with typical residential sewage and effluent only. (See Volume III, Section III- 5.1.3.1 for typical residential sewage strength and peak flows).

      In all cases the standards are minimums; more conservative standards may be used.


      Daily Design Flow

      Daily Design Flow is the estimated peak daily flow to be discharged. For the purposes of the SPM this is considered to be synonymous with the SSR terms “estimated daily domestic sewage flow” and “daily design domestic sewage flow”, and generally represents the maximum flow that the system will discharge.


      II- 5.1.1 CONFIRMATION OF SITE USE

      Contact the owner to confirm the site (building) use. See Volume III Section III- 5.1.1.1 for guidance on owner declaration. For a residence, confirm the number of bedrooms, floor area and occupancy.

      Inform the owner of the DDF and allowable average flow, as well as the standards for sewage quality.


      II- 5.1.2 RESIDENTIAL DAILY DESIGN FLOW RATES

      Select the Daily Design Flow (DDF) for residences using either:

      1. The number of bedrooms (Table II- 8), or

      2. The household occupancy (Table II- 9).

      These tables and the standards of this manual are for normal residential sewage, with a maximum allowable average flow for any 30 day period of 50% of the DDF.

      Table II- 8. Minimum Daily Design Flow (DDF) for Residences


      NUMBER OF BEDROOMS

      MAXIMUM FLOOR AREA (M2)

      DDF LITRES/DAY

      1

      140

      700

      2

      240

      1,000

      3

      280

      1,300

      4

      330

      1,600

      5

      420

      1,900

      6

      520

      2,200

      Additional bedroom, add


      300

      Additional 1m2


      3

      Notes:


      As an option, the AP may use the low frequency dosing standards shown in the tables; these options result in a larger minimum vertical separation. Do not use the low frequency dosing options with Subsurface Drip Dispersal or Alberta At Grade systems.

      For subsurface drip dispersal systems use timed or micro-dosing only; see Volume III for adjusted minimum timed dosing and micro-dosing frequencies, or calculation of micro-dose frequency.


      II- 5.2.2.2 Demand and Timed dosing

      If the soil type varies over the depth under consideration, then select dose frequency based on the soil layer closest to the infiltrative surface. If a blinding layer is used over a native soil, select the dose frequency based on the native soil.

      Table II- 10. Minimum dosing frequency for demand dosing



      SOIL TYPE OR NOTES

      MIN. DOSES PER DAY AT DDF

      Type 1 HLR

      Type 2 HLR

      Normal

      Low

      Normal

      Low

      Gravelly Coarse Sand, Gravelly Sand, Coarse Sand, Loamy Coarse Sand, Sand and Loamy Sand

      8

      4

      12

      6

      Clean Coarse Sand and Mound Sand, in sand mound or sand lined trench and bed systems

      8

      NA

      NA

      NA

      Clean Coarse Sand and Mound Sand used as fill sand, with less than 30 cm depth of sand media fill below infiltrative surface

      8

      4

      12

      6

      Other soils

      8

      4

      8

      4

      Note: “Low” refers to low frequency dosing option.

      Table II- 11. Minimum dosing frequency for timed dosing



      SOIL TYPE OR NOTES

      MIN. DOSES PER DAY AT DDF

      Type 1 HLR

      Type 2 HLR

      Normal

      Low

      Normal

      Low

      Gravelly Coarse Sand, Gravelly Sand, Coarse Sand, Loamy Coarse Sand, Sand, Clean Coarse Sand, Mound Sand

      12

      8

      18

      NA

      Loamy Sand, Fine Sands, Loamy Fine Sands

      12

      6

      18

      12

      Clean Coarse Sand, Mound Sand in sand mound or sand lined trench/bed.

      12

      8

      Micro- dosing

      NA

      Other soils

      8

      6

      12

      8

      Note: “Low” refers to low frequency dosing option.


      II- 5.2.2.3 Micro-dosing

      Micro-dosing is an optional technique that offers some advantages on some sites. When using this method, the following standards apply.

      At the hydraulic loading rates specified in this manual, use the simplified dosing frequencies from Table II-

      12. These dosing frequencies are based on the soil or sand depth below the infiltrative surface, and on the type of soil or sand.

      Alternatively, follow the procedure in Volume III to calculate micro-dosing frequency.

      If the soil type varies over the depth under consideration, then select the dosing frequency based on the soil layer closest to the infiltrative surface. If a blinding layer is used over a native soil, select the dose frequency based on the native soil.

      Table II- 12. Micro-dosing frequency, with SPM HLR


      EFFLUENT TYPE

      DOSES PER DAY, TYPE 1 HLR

      DOSES PER DAY, TYPE 2 HLR

      SOIL TYPE / SOIL DEPTH

      30 CM

      45 CM

      55 CM

      30 CM

      45 CM

      55 CM

      Gravelly Sands

      36

      24

      18

      48

      34

      26

      Mound sand

      28

      18

      14

      48

      30

      24

      Sands, Loamy Sands, Clean Coarse Sand

      18

      12

      8

      36

      22

      18

      Loamy Fine Sand, Sandy Loam, Fine Sandy Loam

      14

      10

      10

      30

      20

      20

      Very Fine Sandy Loam, Loam, Silt Loam, Silt, Clay Loams, Clays


      12


      12


      12


      20


      20


      20


      II- 5.3 Vertical separation (VS)

      II- 5.3.1 MINIMUM REQUIRED VERTICAL SEPARATION

      The vertical separation is the vertical distance, or height, of unsaturated soil, measured from the sand or soil infiltration surface to the limiting layer. The infiltration surface may be the bottom of an infiltration trench, base of an infiltration bed, designated Point of Application for a CTDS, or a drip dispersal tube.

      Select the minimum required vertical separation depending on the type of distribution, type of dosing, type of effluent and type of soil following Section II- 4.1.2 (site capability tables). See Table II- 7 (page II-17) for soil types where uniform distribution and timed or micro-dosing is specified. Use the site capability tables together with these VS tables when selecting a system.

      Table II- 13. Key to minimum required vertical separation tables


      SYSTEM TYPE

      TABLE

      NOTES

      Gravity distribution

      Table II- 14


      Uniform distribution with demand dosing, to native soil or to native soil plus less than 30 cm of sand media fill


      Table II- 15


      If the thickness of sand media is 30 cm or more, follow the sand mound standards, Table II- 17.

      Uniform distribution with timed or micro dosing to native soil or to native soil plus less than 30 cm of sand media fill


      Table II- 16

      Sand mounds and sand lined trenches/beds

      Table II- 17


      Subsurface Drip Dispersal with micro dosing and up to 30 cm fill


      Table II- 18

      If the thickness of sand media is more than 30 cm, follow the sand mound standards, Table II- 17.

      Notes:

      • These vertical separation standards apply for sewerage systems that meet the other related standards in Volume II, including the maximum allowable HLRs, and the minimum allowable system contour length.

      • Effluent type refers to the hydraulic loading rate (HLR) used. If Type 2 effluent is used with a Type 1 HLR, Type 1 minimum vertical separation can be used.


        II- 5.3.1.2 Soil characteristics for the VS tables:

      • The minimum vertical separations apply to the soil characteristics of the horizon in which the infiltration surface will be placed, as well as the characteristics of the underlying soil.

      • When using the tables below, select the vertical separation (VS) based on the soil horizon within 30cm below the infiltrative surface that will result in the largest (most conservative) VS.


        II- 5.3.2 VERTICAL SEPARATION FOR DISPERSAL SYSTEMS

        Each vertical separation table provides standards for different soil types and permeabilities, with higher permeability soils at the top of the table, working down to less permeable soils.

        To select the minimum vertical separation (VS) options from the tables II-14 to II-17:

      • Check the site capability tables for any requirements for the soil type, permeability or system type.

      • Work down the left hand column until a soil type or permeability matches the chosen soil.


      • Select vertical separation options for that soil type or permeability from each table.

      • Choose the design vertical separation and distribution and dosing methods considering the options available.

        Table II- 14. For gravity distribution systems


        SOIL TYPE

        EFFLUENT TYPE (HLR)

        MINIMUM VERTICAL SEPARATION (VS) IN NATIVE SOIL

        Loamy Coarse Sand, Sand and Loamy Sand


        All types (1, 2 or 3)


        150 cm




        Fine Sand, Loamy Fine Sand, Sandy Loam, Loam

        1 or 3

        90 cm

        2

        120 cm




        Silt Loam, Silt

        All types

        120 cm

        • Gravelly Sand or Coarse Sand, Coarse Sand,

        • Or Kfs from 1,500 to 17,000 mm/day

        • Or Perc rate 0.5 to less than 5 min/inch

        Notes:

      • Gravity distribution systems may use up to 10cm of Mound Sand or Clean Coarse Sand fill as a blinding layer; this may be considered as part of the required vertical separation.

      • With gravity distribution, do not use a blinding layer to raise the infiltrative surface above the natural ground surface.

      • Do not use sand media fill below a gravity dispersal system, unless it is a blinding layer 10 cm or less in thickness.


        Table II- 15. For uniform distribution with demand dosing to native soil or native soil plus less than 30 cm sand fill


        SOIL TYPE

        TYPE OF DOSING

        EFFLUENT TYPE (HLR)

        MINIMUM VS IN NATIVE SOIL

        MINIMUM AS CONSTRUCTED VS



        Demand dosing

        1 or 3

        60 cm

        60 cm

        2

        60 cm

        85 cm


        Low frequency demand dosing

        1 or 3

        75 cm

        75 cm

        2

        90 cm

        90 cm







        Other soils

        Demand dosing

        All types

        60 cm

        60 cm

        Low frequency demand dosing

        All types

        70 cm

        70 cm

        • Gravelly Sand, Coarse Sand, Loamy Coarse Sand, Sand and Loamy Sand

        • Or Kfs from 1,500 to 17,000 mm/day

        • Or Perc rate from 0.5 to less than 5 min/inch

        Table II- 16. For uniform distribution with timed or micro-dosing to native soil or native soil plus less than 30 cm sand fill



        SOIL TYPE

        TYPE OF DOSING

        EFFLUENT TYPE (HLR)

        MINIMUM VS IN NATIVE SOIL

        MINIMUM AS CONSTRUCTED VS

        Timed dosing

        All types

        60 cm

        85 cm

        Micro-dosing

        All types

        45 cm

        75 cm








        Timed dosing

        1 or 3

        45 cm

        60 cm

        2

        45 cm

        75 cm


        Low frequency Timed dosing

        1 or 3

        60 cm

        75 cm

        2

        70 cm

        85 cm

        Micro-dosing

        All types

        45 cm

        55 cm







        Other soils

        Timed dosing

        All types

        45 cm

        60 cm

        Low frequency timed dosing

        All types

        70 cm

        70 cm

        Micro-dosing

        All types

        45 cm

        55 cm

        • Very or Extremely Gravelly Sand or Coarse Sand

        • Or Kfs greater than 17,000 mm/day

        • Or Perc rate faster than 0.5 min/inch

        • Gravelly Sand, Coarse Sand, Loamy Coarse Sand, Sand and Loamy Sand

        • Or Kfs from 1,500 to 17,000 mm/day

        • Or Perc rate from 0.5 to less than 5 min/inch


        Notes to Table II- 15 and Table II- 16:

      • Confirm that the vertical separation, as planned, meets both the minimum depth of native soil specified (in column 4) and the minimum required total depth of soil plus sand (as constructed VS, column 5).

      • The minimum required as-constructed vertical separation (column 5) may be in native soil only, or native soil plus sand media fill.

      • Uniform distribution systems may use up to 10cm of Mound Sand or Clean Coarse Sand media fill as a blinding layer. This may be considered as part of the required native soil vertical separation.

      • For planning a raised system or a system where more than 10 cm sand media thickness is used, any sand fill used is not considered part of the native soil vertical separation.

      • If the sand media fill is 30 cm or thicker, then follow the sand mound standards, Table II- 17.

        Table II- 17. For sand mounds and sand lined trenches and beds



        SOIL TYPE


        TYPE OF DOSING

        EFFLUENT TYPE (HLR)

        MINIMUM VS IN NATIVE SOIL

        MINIMUM SAND MEDIA THICKNESS

        MINIMUM AS CONSTRUCTED VS

        All soil types

        Demand dosing

        1

        25 cm

        60 cm

        85 cm

        Timed dosing

        1

        25 cm

        45 cm

        75 cm

        Low frequency

        Timed dosing

        1

        25 cm

        60 cm

        85 cm

        Micro-dosing

        1 or 3

        25 cm

        30 cm

        60 cm

        2

        25 cm

        45 cm

        75 cm

        Note: Confirm that the vertical separation, as planned, meets the minimum depth of native soil specified (in column 4) and the minimum depth of sand (sand media thickness, column 5) and the minimum required total depth of soil plus sand (as constructed VS, column 6).

        Table II- 18. For Subsurface Drip Dispersal (SDD) systems with micro-dosing



        SOIL TYPE


        INSTALLED IN

        EFFLUENT TYPE (HLR)

        MINIMUM VS IN NATIVE SOIL

        MINIMUM AS CONSTRUCTED

        VS

        Native soil

        All types

        60 cm

        Fill material

        All types

        45 cm

        60 cm






        Other soils

        Native soil

        All types

        45 cm

        Fill material

        All types

        30 cm

        60 cm

        • Very or Extremely Gravelly Sand or Coarse Sand

        • Or Kfs greater than 17,000 mm/day

        • Or Perc rate faster than 0.5 min/inch

        Note:

      • If the SDD system does not dose frequently enough to be defined as micro-dosing, then select the vertical separation using Table II- 16.

      • If sand media fill layer is thicker than 30 cm, follow the sand mound standards in Table II- 17.


        II- 5.3.3 VERTICAL SEPARATION FOR BC ZERO DISCHARGE LAGOONS AND ETA BEDS

        For a lagoon or ETA bed, plan the system to provide at least the following vertical separation distance:

      • 90 cm to the seasonal high water table (SHWT).

      • 90 cm to a soil layer of type or permeability that is unsuitable for a lagoon or ETA bed (see Table II- 6).


        II- 5.4 Horizontal separation

        The horizontal separation is the minimum horizontal distance from the edge of the infiltrative surface to the boundary.

        Depending on the type of system, the infiltrative surface edge is defined as follows:

      • The wall of an infiltration trench.

      • For Seepage Beds, sand mounds, and subsurface drip dispersal systems, the edge of an infiltration bed.

      • For an Alberta At Grade system, the edge of the required basal area.

      • For a CTDS, the edge of the required basal area.

      • For a lagoon, the edge of the maximum water level (the inside top of the berm).


      II- 5.4.1 MINIMUM HORIZONTAL SEPARATION

      Select the horizontal separation using either Table II- 19 or Table II- 20.

      For horizontal separation to reduce risk of damage or encroachment see Volume III, Table III- 16 (page III- 72).


      Table II- 19. Minimum required horizontal separation distances



      MINIMUM HORIZONTAL DISTANCE TO

      FROM DISPERSAL SYSTEM

      FROM WATERTIGHT TREATMENT OR

      PUMP TANK

      METRES

      METRES

      Water sources and wells



      Surface source of drinking water

      30

      15

      Domestic water supply well1

      30

      30

      Domestic water supply well, high pumping rate2

      60

      30

      Domestic water supply well, high pumping rate, in unconfined aquifer2

      90

      30

      Irrigation well or open loop geothermal well

      15

      7.5

      Deep monitoring well or closed loop geothermal well3

      6

      6

      Shallow monitoring well4

      3

      0

      Drinking water lines and cisterns



      Drinking water suction line

      30

      15

      Drinking water suction line, sleeved5

      7.5

      3

      Drinking water line, under pressure

      3

      3

      Drinking water line, under pressure, sleeved5

      1

      1

      Drinking water supply cistern, below ground

      15

      3

      Water bodies and surface breakout



      Permanent fresh water body6

      30

      10

      Intermittent fresh water body7

      15

      10

      Marine water body8

      15

      7.5

      Break-out point or downslope drain9

      7.5

      0

      Notes:

      1 For drinking water well, see the SSR s3.1 and Section II- 2.1.2.2 of this Manual for special considerations.

      Domestic water supply wells include excavated or dug wells.

      2 For definitions of “high pumping rate well” and “unconfined aquifer” see the glossary.

      3 The horizontal separation to a deep monitoring well or to a closed loop geothermal well is based on a well with an annular seal that complies with the Ground Water Protection Regulation (GWPR). If the well does not comply with the GWPR, follow horizontal separation standards for drinking water wells.

      4 The horizontal separation to a shallow monitoring well is based on a well which is shallower than 4.6 m and constructed with an annular seal that complies with the GWPR.

      5 Sleeved water lines (suction or pressure) use continuous pipe sleeving within the normal standard HS to allow reduced HS, see Volume III for details.


      6, 7, 8 For separation to a water body, measure the separation distance to:

      • the mean high tide for marine water.

      • the high water mark for fresh water.

      7 See glossary. A watertight culvert is not a water body. See Section III- 5.4.1 for guidance on ditches.

      9 Downslope drains include building perimeter drains. If the drain in question will discharge directly to a water body, then use the relevant separation distance for the water body. A drain is not considered to be a breakout point if there is an impermeable barrier between the drain and the dispersal area. See Section II- 6.19.

      Adherence to the horizontal separation distances for water supply sources does not imply that the water sources are potable.

      For adjacent domestic water supply wells, particularly for wells situated in unconfined aquifers, care should be taken to place the dispersal area as far away as practical from the well.


      Table II- 20. Minimum required horizontal separation for BC Zero discharge lagoons


      MINIMUM HORIZONTAL DISTANCE TO

      FROM LAGOON

      METRES

      Wells


      Surface source of drinking water

      30

      Domestic water supply well1

      30

      Domestic water supply well, high pumping rate2

      60

      Domestic water supply well, high pumping rate, in unconfined aquifer2

      90

      Irrigation well or open loop geothermal well

      15

      Deep monitoring well or closed loop geothermal well3

      6

      Shallow monitoring well4

      3

      Drinking water lines and cisterns


      Drinking water suction line

      30

      Drinking water suction line, sleeved

      15

      Drinking water lines, under pressure

      7.5

      Drinking water lines, under pressure, sleeved5

      7.5

      Drinking water supply cistern, below ground

      30

      Water bodies and surface breakout


      Permanent fresh water body6

      30

      Intermittent fresh water body7

      15

      Marine water body8

      30

      Break-out point or downslope drain9

      15

      Other


      Building, dwelling

      60

      Building, other than dwelling

      15

      Property line

      15

      Notes from Table II- 19 also apply to this table.


      1. 5.5 Hydraulic Loading Rate (HLR)

        The hydraulic loading rate is a measure of the volume of effluent (litres) applied each day, per unit area of infiltrative surface (AIS).

        In this Manual, the maximum allowable hydraulic loading rate is based on maintaining the permeability of the infiltrative surface and treating the effluent within the unsaturated sand and soil.

        To select a hydraulic loading rate for the soil under the dispersal system, use the following method:

        1. Select the soil structure and consistence category based on the soil evaluation using Table II- 21.

        2. Select a soil HLR based on the soil texture and the consistence category using Table II- 22.

        3. Select a soil HLR based on the soil permeability or percolation rate using Table II- 23.

        4. Use the lower of the two HLR values from steps 2 and 3, above, as the maximum allowable soil HLR

          1. Adjust the HLR according to the site capability tables, see Section II- 4.1.2.

          2. If the HLR value from Table II- 22 or Table II- 23 is “Not Allowed”, the soil is considered unsuitable, regardless of the value obtained from the other table.

        5. Use the selected HLR to calculate the minimum allowable Area of Infiltrative Surface (AIS) for the dispersal system, using the following formula.


      Minimum Area of Infiltrative Surface (AIS) needed (m2) = DDF (L/day) ÷ HLR (L/day/m2)

      Evapotranspiration (ET), Evapotranspiration Absorption (ETA) beds and BC zero discharge lagoons do not use the HLRs in this section. See Sections II- 6.17 & II- 6.18.


      II- 5.5.1 SOIL CHARACTERISTICS FOR THE HLR TABLES:

      Table II- 25. Sand media specifications


      SIEVE SIZE

      PERCENT PASSING THE LISTED SIEVE SIZE

      CLEAN COARSE SAND

      MOUND SAND

      SAND FILTER COARSE SAND

      ASTM C33 SPECIFICATION*

      9.5 mm (3/8 “)

      100

      100

      100

      100

      4.75 mm ( No. 4 sieve)

      95 to 100

      95 to 100

      95 to 100

      95 to 100

      2.36 mm (No. 8)

      80 to 100

      80 to 100

      80 to 100

      80 to 100

      1.18 mm (No. 16)

      50 to 85

      50 to 85

      45 to 85

      50 to 85

      600 µm (No. 30)

      25 to 60

      25 to 60

      15 to 60

      25 to 60

      300 µm (No. 50)

      10 to 30

      10 to 30

      3 to 15

      10 to 30

      150 µm (No. 100)

      < 7

      < 4

      < 2

      < 10

      75 µm (No. 200)

      < 3

      < 1

      < 1

      not specified

      Effective particle size (D10)

      not specified

      > 0.25 mm

      > 0.3 mm

      not specified

      Coefficient of Uniformity(D60/D10)

      not specified

      not specified

      < 3

      not specified

      Note: * C33 sand specification included for comparison only, do not use C33 specification sand for sand mounds, sand lined trenches or beds, or as a blinding layer, unless the sand also meets clean coarse sand or mound sand specification.


      II- 5.6 Minimum system contour length and Linear Loading Rate

      II- 5.6.1 SYSTEM CONTOUR LENGTH

      In all cases, long narrow dispersal systems are preferred. System contour length is the total system length.


      II- 5.6.2 MINIMUM SYSTEM CONTOUR LENGTH

      Select the minimum required system contour length, which is the system length measured along the contour of the land, following Table II- 26. Evapotranspiration, ETA beds and BC zero discharge lagoons do not use the system contour length and LLR tables standards in this section. See Sections II- 6.17 & II- 6.18.

      Table II- 26. Minimum required contour length for dispersal system


      SYSTEM AND SOIL TYPE

      AND THE SOIL DEPTH BELOW THE INFILTRATIVE SURFACE IS

      SYSTEM CONTOUR LENGTH

      For a DDF of 2400 L/day or less and soil with Kfs > 150 mm/day or Perc rate faster than 60 min/inch


      More than 150 cm

      Use 7.5 m minimum or use LLR tables

      For a DDF more than 2400 L/day or soil with Kfs < 150 mm/day or Perc rate slower than 60 min/inch

      Use the LLR tables

      For an at-grade bed, Alberta At Grade system, sand mound, or any raised system.

      Use the LLR tables

      Note: The measurement of soil depth below the infiltrative surface in this table applies to both the dispersal area and the receiving area. The receiving area is the area extending to 7.5m downslope from the infiltration surface. On a dispersal site with a slope of less than 2%, the receiving area extends to 7.5m in all directions from the infiltration surface. See Volume III for guidance on selection of soil depth.


      II- 5.6.3 SELECTING AND USING LINEAR LOADING RATE (LLR)

      The linear loading rate (LLR) is a measure of the volume of effluent (litres) applied each day, per unit length of the overall system on contour. To select a maximum allowable LLR and calculate the minimum allowable system contour length, follow these steps:

      1. Determine the soil structure and consistence category using Table II- 21. Select the LLR based on the soil horizon(s) in which water will flow from the dispersal area. See Volume III for guidance on selecting the appropriate soil horizon for use with the LLR tables.

      2. Select a LLR, based on the soil texture and the consistence category using Table II- 27.

      3. Select a LLR, based on the soil permeability or percolation rate using Table II- 28.

      4. Use the lower of the two LLR values from steps 2 and 3, above, as the maximum allowable LLR.

      5. Use this maximum LLR to calculate the minimum system contour length, using the following formula:


        Minimum system contour length (m) = DDF (L/day) ÷ LLR (L/day/m)


      6. Adjust the effective length of the planned system for any concave contour (following Section II- 5.6.4).


      If either LLR table shows “NA” then select another dispersal location. Alternately an ET bed, an ETA bed or a BC zero discharge lagoon may be used, if appropriate.



      SOIL TEXTURE GROUP

      CATEGORY

      SLOPE 0 TO < 5%

      SLOPE 5 TO < 10%

      SLOPE 10% TO < 15%

      SLOPE ≥ 15%

      SOIL DEPTH BELOW INFILTRATIVE SURFACE (CM)

      SOIL DEPTH BELOW INFILTRATIVE SURFACE (CM)

      SOIL DEPTH BELOW INFILTRATIVE SURFACE (CM)

      SOIL DEPTH BELOW INFILTRATIVE SURFACE (CM)

      25 –

      45

      45 –

      60

      60 –

      90

      ≥ 90

      25 –

      45

      45 –

      60

      60 –

      90

      ≥ 90

      25 –

      45

      45 –

      60

      60 –

      90

      ≥ 90

      25 –

      45

      45 –

      60

      60 –

      90

      ≥ 90

      Very or Extremely Gravelly Sands

      F or P

      150

      260

      340

      400

      290

      400

      400

      400

      400

      400

      400

      400

      400

      400

      400

      400

      Gravelly Sands and Coarse Sand

      F

      85

      140

      180

      250

      150

      250

      330

      400

      260

      400

      400

      400

      360

      400

      400

      400

      P

      50

      80

      110

      140

      80

      140

      180

      250

      140

      240

      310

      400

      200

      330

      400

      400

      Sand, Loamy Sand

      F

      45

      60

      70

      90

      55

      85

      110

      150

      90

      140

      180

      240

      120

      190

      240

      340

      P

      45

      55

      70

      70

      50

      60

      75

      90

      60

      90

      110

      140

      80

      120

      150

      200

      Fine Sands, Loamy Fine Sands, Sandy Loams

      F

      45

      55

      70

      70

      50

      60

      75

      75

      60

      75

      90

      100

      75

      90

      110

      130

      P

      40

      45

      55

      55

      45

      50

      55

      60

      50

      55

      60

      65

      60

      65

      75

      80

      VP

      25

      30

      35

      35

      25

      35

      40

      40

      30

      35

      40

      40

      35

      45

      50

      50

      Loam, Silt Loam, Silt

      F

      40

      45

      55

      55

      45

      50

      55

      60

      50

      55

      60

      65

      60

      65

      75

      80

      P

      30

      35

      40

      40

      35

      40

      45

      45

      35

      45

      50

      55

      45

      50

      60

      65

      VP

      17

      22

      26

      26

      19

      24

      28

      28

      21

      25

      30

      30

      25

      30

      35

      35

      Clay Loam, Sandy Clay Loam, Silty Clay Loam

      F

      30

      35

      40

      40

      35

      40

      45

      45

      35

      45

      50

      55

      45

      50

      60

      65

      P

      25

      30

      35

      35

      25

      35

      40

      40

      30

      35

      40

      40

      35

      45

      50

      50

      VP

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      Sandy Clay, Silty Clay, Clay

      F

      25

      30

      35

      35

      25

      35

      40

      40

      30

      35

      40

      40

      35

      45

      50

      50

      P

      17

      22

      26

      26

      19

      24

      28

      28

      21

      25

      30

      30

      25

      30

      35

      35

      VP

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA

      NA



      KFS (MM/DAY)


      PERCOLATION RATE (MIN/INCH)

      SLOPE 0 TO < 5%

      SLOPE 5 TO < 10%

      SLOPE 10% TO < 15%

      SLOPE ≥ 15%

      (CM) SOIL DEPTH BELOW INFILTRATIVE SURFACE

      (CM) SOIL DEPTH BELOW INFILTRATIVE SURFACE

      (CM) SOIL DEPTH BELOW INFILTRATIVE SURFACE

      (CM) SOIL DEPTH BELOW INFILTRATIVE SURFACE

      25 –

      45

      45 –

      60

      60 –

      90

      ≥ 90

      25 –

      45

      45 –

      60

      60 –

      90

      ≥ 90

      25 –

      45

      45 –

      60

      60 –

      90

      ≥ 90

      25 –

      45

      45 –

      60

      60 –

      90

      ≥ 90

      > 17,000

      < 0.5

      150

      260

      340

      400

      290

      400

      400

      400

      400

      400

      400

      400

      400

      400

      400

      400

      8000-17000

      0.5 – 1.0

      85

      140

      180

      250

      150

      250

      330

      400

      260

      400

      400

      400

      360

      400

      400

      400

      4000 – 8000

      1 – 2

      50

      80

      110

      140

      80

      140

      180

      250

      140

      240

      310

      400

      200

      330

      400

      400

      2000 – 4000

      2 – 4

      45

      55

      70

      90

      55

      85

      110

      150

      90

      140

      180

      240

      120

      190

      240

      340

      1000 - 2000

      4 – 7.5

      45

      55

      70

      70

      50

      60

      75

      90

      60

      90

      110

      140

      80

      120

      150

      200

      550 – 1,000

      7.5 – 15

      45

      55

      70

      70

      50

      60

      75

      75

      60

      75

      90

      100

      75

      90

      110

      130

      300 - 550

      15 – 30

      40

      45

      55

      55

      45

      50

      55

      60

      50

      55

      60

      65

      60

      65

      75

      80

      150 – 300

      30 – 60

      30

      35

      40

      40

      35

      40

      45

      45

      35

      45

      50

      55

      45

      50

      60

      65

      75 – 150

      60 – 120

      25

      30

      35

      35

      25

      35

      40

      40

      30

      35

      40

      40

      35

      45

      50

      50

      < 75

      > 120

      NA


      II- 5.6.4 SLOPES WITH CONCAVE CONTOUR

      When planning a dispersal system for land with concave elevation contours, calculate the effective contour length as the bowstring length of the system or bed; that is, a straight line between the two ends of the system or bed.


      II- 5.6.5 MINIMUM SYSTEM CONTOUR LENGTH FOR AT GRADE AND RAISED SYSTEMS

      The following standard applies for all at-grade or above grade systems; that is, systems where the infiltrative surface (or, for CTDS systems, the Point of Application) is at or above grade. For these systems, the system contour length for calculating the linear loading rate is equal to the length on contour of the dispersal system. Ensure that this length meets or exceeds the minimum contour length standards of Section II- 5.6.2.

      For a single bed or CTDS system this is the length on contour of the bed, or CTDS bed or the base of the CTDS treatment unit. For a trench or multiple bed system, the contour length is the system length on contour.

      For calculating the contour length of the system, there is no allowance for lateral spreading of effluent along the contour within the sand media placed under the dispersal cell. Consider the example of a sand mound: the system contour length for linear loading rate calculation is the length of the dispersal bed.

      The total outside length of the dispersal system will be longer than this contour length, because of the need for cover soil and side slopes.


      II- 5.6.6 MINIMUM CONTOUR LENGTH FOR BELOW GRADE SYSTEMS USING SAND MEDIA

      For sand lined trenches or beds and for any system using sand media below the infiltrative surface or Point of Application (for CTDS), the contour length of the system is measured as for at grade and raised systems. That is, there is no allowance for lateral spreading of effluent along the contour within the sand media.


    6. SPECIFICATION AND INSTALLATION STANDARDS

      Tables in this section have the following general format:


      Component or item to be considered

      Action or standard specification to meet standards


      II- 6.1 Flow monitoring

      Ensure all dosed systems are provided with a reliable method of measuring effluent flow to the dispersal area. At minimum, provide a method to calculate average daily flow.


      II- 6.2 Access provisions for maintenance and monitoring

      Specify and install systems to provide maintenance providers with safe access to all system components that need routine maintenance. See Volume III for guidance on safety.


      II- 6.3 Connections, piping and collection systems

      II- 6.3.1 SEWERS


      II- 6.3.1.1 Gravity sewers

      Table II- 29. Gravity sewers from building to first tank


      Grade for 4" (100 mm) sewer

      Minimum grade of 1% (⅛ inch per foot)

      Grade for 3" (75 mm) sewer

      Minimum grade of 2% (¼ inch per foot)

      Restriction to direction changes between cleanouts

      • No more than 5º every 3 m, or

      • Use fittings with a cumulative change in direction of not more than 45º

      Table II- 30. Cleanouts for gravity sewers


      SIZE OF DRAINAGE PIPE (INCHES)

      MINIMUM SIZE OF CLEANOUT (INCHES)

      MAXIMUM SPACING OF CLEANOUTS (METRES)

      3 and 4

      3

      15

      > 4

      4

      20

      Notes:

      • Cleanouts to be in the direction of flow.

      • Bring cleanouts to grade or provide suitable access.

      Seal all collection components and piping to prevent infiltration of groundwater as well as leaks to the environment.

      See Volume III for guidance on alternative collection systems.


      II- 6.3.1.2 Pumped discharge to the septic tank

      Table II- 31. Pumped discharge of sewage to the septic tank



      Grinder or macerator pumps


      Dose volume from pump, and surge flow to the septic tank or treatment system

      Alarms and pump chamber

      Provide alarms and pump control following pump chamber standards Section II- 6.12 and tank following standards of Section II- 6.4

      Tank venting

      Specify vents to receiving tanks and intermediate pump tanks, following Table II- 34 (page II-45).

      • Increase the septic tank capacity by a factor of 2

      • If only part of the sewage flow is pumped, increase that proportion of the tank size by multiplying by a factor of 2.


      II- 6.3.2 SPECIFICATION AND INSTALLATION

      See Volume III for specification and installation guidelines.


      II- 6.4 Tanks, septic tanks and effluent filters, treatment systems

      For standards specific to Combined Treatment and Dispersal Systems (CTDS) see Section II- 6.16.

      Table II- 32. Septic tanks and effluent filters



      Effluent filter mesh

      Filter particles greater than or equal to 3.2 mm (1/8″). For pumped discharge from a septic tank, provide a screen with a minimum wetted open area of

      0.25 m2.

      Effluent filter intake (center of clear zone).

      Center the filter intake at 60 – 70% of the working volume depth of the tank, measured from tank floor.


      Effluent filter alarm

      Provide a filter alarm on all systems where sewage is pumped into the septic tank. Specify an alarm that meets the dosing system standards in Section II- 6.12

      Effluent filter minimum capacity

      Specify a filter that needs be cleaned once every two years, or less often.


      Pumped discharge from septic tank

      For systems that pump effluent from a septic tank, specify:

      Alternately, a second or third compartment of a septic tank may be used as a pump chamber, provided that compartment is not counted as part of the septic tank working volume.


      Tank specification

      Specify the following:

      Septic tank working volume, for a DDF of up to 9100 L/day

      Specify a tank with working volume at least 3 times the DDF.

      Septic tank working volume, for a DDF over 9100 L/day

      Specify a tank with a working volume of at least 15,000 L + (DDF in litres × 1.34), or as otherwise determined by the design professional.

      • A filtered (screened) vault with the inlet at the center of the clear zone.

      • A maximum pumping rate of 190 L/min.

      • A maximum drawdown of 10% of the tank working volume.

      • An alarm reserve volume of at least 50% of the DDF, measured to the tank lid base (without backup into building).

      • Inlet and outlet baffles or tees.

      • For tanks with 2 compartments, use tanks with 3/4 to 1/2 of the total working volume in the first compartment.

      • Tanks with no air space may be used as an alternate to the CSA B66 air space standard, provided the tank is vented.

      Note: The effluent filter may be at the tank outlet, in a separate filter chamber or as a screened vault for the pump or siphon. A secondary filter may also be used after the pump (in the discharge line).


      Table II- 33. Tanks and tank access


      Pre-manufactured tanks


      Access risers

      Access, effluent filter, pump and float attachments.

      Provide access via riser, with any handle, attachment or union or disconnect within 15 cm of the top of the riser.

      • Ensure all tanks are structurally sound and watertight.

      • Check that tanks meet CSA B66 structural and watertight standards.

      • Provide a riser for access to each chamber or compartment, and for each baffle, tee or effluent filter.

      • Provide primary opening(s) of at least 50 cm internal diameter, or 60 cm when over a divider or if needed to access a pump etc.

      • Extend each riser to finished grade, and seal with a child resistant lid.

      Note: For treatment plants in enclosures, specify an enclosure which is safe and protects health during the life of the system.

      Table II- 34. Tank installation



      Tank bedding and backfilling

      Tank inlet and outlet piping

      Support pipes so they do not settle.

      Access

      Extend access risers to finished grade; slope the ground away from the riser lid; insulate the riser in cold climates


      Watertight testing

      Infiltration

      Seal all penetrations through the walls of tanks and risers.


      Risk of tank floating

      For tanks installed with the tank base below the seasonal high water table, drain the tank area, or if this is not practical specify effective measures to prevent the tank from floating when empty.


      Tank venting

      • Follow the tank manufacturer’s standards, including maximum depth of burial.

      • Ensure any bedding layer below the tank is compacted before installing the tank.

      • Test all tanks using water, to verify a rate of leakage less than 0.1% of volume per day. Alternately use vacuum testing.

      • Test the tank, penetrations and the lid seal.

      • Vent all tanks, either via the building sewer or separately.

      • Use vent pipes with a minimum inside cross section area equal to that of the tank inlet pipe, or a minimum of 7800 mm2, whichever is greater.

      • For treatment plants, follow manufacturer standards for venting.

      • Ensure venting does not create an odour nuisance or explosion hazard.

      • Protect vents from animal or insect access using corrosion resistant screens.

      • Provide access to vent screens and outlets for maintenance.


      II- 6.5 Dispersal systems, general

      II- 6.5.1 SIZING

      Calculate sizing following Section II- 5.5 and Section II- 5.6 plus any system specific considerations.


      II- 6.5.2 SPECIFICATION AND INSTALLATION


      II- 6.5.2.1 Aggregate and other materials

      Table II- 35. Aggregate, separation and cover soil layer


      Coarse aggregate, specify and install:

      Separation layer (between aggregate and cover soil) options

      Cover soil

      Blinding layer

      Permeable fill for toe blankets or between raised trenches

      • Aggregate that will not biodegrade or break down over time, concrete rubble is not an acceptable aggregate.

      • Aggregate that will not shrink or swell.

      • If using stone or glass aggregate, specify a hardness >3 on the Standard Measurement of Hardness (MOH’s) scale of hardness.

      • Aggregate with less than 1% by weight passing the #200 (75µm) sieve, and without silt or clay coating (normally, washed and screened).

      • Lightweight non-woven geotextile.

      • Untreated building paper.

      • Graded aggregate and sand filter layers.

      • For trench or Seepage Bed systems use permeable native soil or Loamy Sand, Loamy Fine Sand or Sandy Loam.

      • For at-grade beds, sand mounds and sand lined trenches or beds use Loamy Sand, Loamy Fine Sand or Sandy Loam.

      • Crown and grade the cover soil to shed water.

      • Provide a soil depth of 10 cm to 30 cm, after settling (15 to 40 cm before settling).

      • If providing soil cover deeper than 30 cm, use Clean Coarse Sand or Mound Sand to add depth prior to placing the cover soil.

      • See Volume III Section III- 6.5.2.1.(d) for depth of cover guidance.

      • Use fill that is as permeable as, or more permeable than, the adjacent native soil.

      • See Volume III, Section III- 6.8.4 for information on toe blankets.

      Notes:

      • The table above applies for trenches, beds, at-grade beds and sand mound and sand lined trenches and bed systems.

      • For aggregate sizing and depths; see individual sections of this Volume (trench, bed etc.).

      • See Volume III for guidance on trench maximum cover depth.


        II- 6.5.2.2 Site, Soil and Ecosystem Considerations

        Do not construct systems when the soil moisture content is high enough that the construction will damage soil structure or consistence. Do not construct a system on or in cohesive soils with water content above the plastic limit. Before construction, assess the soil moisture at the soil surface, or at the infiltrative surface level, and also at 200 mm below the infiltrative surface.

        During and after installation, protect the soils in the dispersal area and in the receiving area from damage to soil structure and consistence. Provide physical barriers that will protect the dispersal and receiving areas from vehicle traffic.


        II- 6.5.2.3 Gravelless infiltration systems

        Table II- 36. Gravelless systems


        The effective width for calculating area of infiltrative surface (AIS) is defined as:

        General specifications

        Void ratio or side wall open area

        Use only systems with a void ratio, or a side wall open area, equal to at least 35% of the bottom infiltrative area (maintained for the life of the system).

        Separation layer

        Avoid using a geotextile, or other separation layer, unless recommended by the manufacturer.

        Backfill

        Observation ports

        Install one observation port on each lateral, following manufacturer recommendations for installation.

        Blinding layer

        • For pipe systems, use the outside dimensions of pipe or pipe bundles.

        • For geocomposite systems, use the outside dimensions of the bundles.

        • For infiltration chambers, use the outside dimension of base of the chamber.

        • Use systems with a load bearing capacity of at least AASHTO H-10.

        • Install the system following manufacturer’s instructions, where these are consistent with this Manual.

        Note: Gravelless systems may be used in place of coarse aggregate for trench systems, Seepage Beds, sand mounds and sand lined trenches and beds.


        II- 6.5.2.4 Observation ports

        See Volume III for guidance on observation ports.


        II- 6.5.2.5 Venting

        Dispersal system chambers, gravity distribution piping and distribution boxes (D – Boxes or drop boxes) can be vented.

        If using vents, ensure vents extend at least 30 cm above grade (or higher if average snow depth will be greater than 30 cm). Specify a vent opening that faces downward and has a stainless steel insect screen. Vents may be plugged in winter in extreme cold climate conditions.


        II- 6.6 Trench infiltration systems

        II- 6.6.1 DESCRIPTION

        See Volume III for description of trench infiltration systems.


        II- 6.6.2 SIZING

      • Size trench systems so that the horizontal basal area only (not including the sidewall area) is at least equal to the Area of Infiltrative surface (AIS) (AIS = DDF ÷ HLR)

      • Trench infiltrative bottom area needed = AIS

      • Total length of trenches = AIS ÷ the trench width


        II- 6.6.3 SPECIFICATION AND INSTALLATION

        Table II- 37. Trench dispersal systems, general


        Trench width

        Lateral length, gravity distribution

        Limit laterals to 15 m (50 ft.) or less

        Level and alignment

        Trench spacing (measured horizontally)

        Trench base

        Blinding layer

        Aggregate (if used)

        Aggregate depth

        Install aggregate to at least 15 cm (6 in.) depth below the distribution pipe and at least 5 cm (2 in.) above the pipe.

        Cover soil

        Observation ports

        • 30 cm to 90 cm (12 to 36 in.)

        • On slopes greater than 15%, use specify a trench width of 30 to 60 cm.

        • Install trenches on level, or sloping in the direction of flow at no greater than 5 cm in 30 m (0.2%).

        • Install along the contour of the land

        • Space trenches a minimum 1.8 m from centre line to centre line (c/c).

        • On slopes greater than 15%, space trenches at least 3 m c/c.

        • Provide at least 0.9m between adjacent trench edges.

        • Scarify the trench base.

        • Scarify any smeared sidewalls.

        • Do not over excavate and backfill (except for a blinding layer).

        • Do not compact the soil.

        • Install at least two infiltrative surface observation ports per drainfield.

        • Use 100 mm (4") or larger diameter pipe.

        • Place observation ports 10 – 15 cm from the distribution pipe, and near the midpoint of the lateral.


        II- 6.7 Seepage Bed systems

        II- 6.7.1 DESCRIPTION

        Seepage Beds are similar to trench systems, but are more than 90 cm in width.


        II- 6.7.2 SIZING

        Follow trench system sizing standards, Section II- 6.6.2.


        II- 6.7.3 SPECIFICATION AND INSTALLATION

        Table II- 38. Seepage Bed dispersal systems


        General

        Level

        Bed spacing

        Distribution laterals, spacing to edge of bed

        Minimum distance from pipe to outer edge of bed: 30 cm (12 in.)

        Observation ports

        Provide at least 2 observation ports using 100 mm (4") or larger diameter pipe, located 10 - 15 cm from the outermost lateral pipes.

        Cover soil

        See Table II- 35 (page II-46) for cover depth.

        Other specifications

        Follow Trench systems standards. Section II- 6.6.3.

        • Limit the bed width to a maximum of 3.0 m (10 ft.).

        • Avoid slopes steeper than 15%.

        • Install the bed level from side to side ± 1.25 cm, and

        • Level, or sloping in the direction of flow at no greater than 5 cm in 30 m (less than 0.2% slope).

        • Provide at least 2.0 m between edges of adjacent beds

        • For above grade beds, provide at least 1.8 m between edges of cover soil.


        II- 6.8 Shallow, at grade and raised systems

        II- 6.8.1 DESCRIPTION

        Trenches or Seepage Beds may be installed at a shallow depth below surface (with cover over and fill around) or at grade and may be installed above grade if using a uniform distribution method.

        If the thickness of sand media fill is 30 cm or more depth, follow sand mound standards.

        Standards of this section do not apply to “at-grade beds” (Section II- 6.13) and “Alberta At Grade systems” (Section II- 6.14) which are specific techniques in which a system is installed directly on native grade.


        II- 6.8.2 SIZING

      • Determine the minimum bed length based on minimum system contour length following Table II- 26 (page II-38)

        • When using LLR table values calculate the length as = DDF ÷ LLR. Use LLR values for the native soil, not the sand. Adjust the contour length for a concave contour if applicable.

      • Use the HLR for native soil or the sand media (whichever is lower) to size the system. (AIS = DDF ÷ HLR)

      • For at grade or raised systems the effective area of infiltrative surface area (AIS) is the area directly below the trench aggregate (i.e. there is no allowance for lateral spreading of effluent in the sand media).


      II- 6.8.3 SPECIFICATION AND INSTALLATION

      Table II- 39. Shallow, at grade, raised trench and Seepage Bed systems


      Cover soil

      Refer to Table II- 52 (page II-64). Cover soil placed between trenches may be placed over Clean Coarse Sand or other fill material of similarly permeability.

      Cover soil width

      Extend a minimum of 60 cm horizontally beyond the sides of the infiltrative surface and at maximum 2h: 1v slope.

      Infiltrative surface level for at or above grade trenches or beds

      Fill media below infiltrative surface

      Use media meeting standards of Table II- 25 for Clean Coarse Sand or Mound Sand.

      Fill installed between cells and toe blanket fill

      Surface water diversion

      Other specifications

      Follow Trench and bed systems standards. Sections II- 6.6.3 & II- 6.7.3

      • Level to ± 1.25 cm (± 0.5 in.).

      • Not necessary for subsurface drip dispersal systems.

      • Prevent run-on from upslope (swale or other method).

      • Cover soil is to slope away from cell.


      II- 6.8.4 TOE BLANKETS

      See Volume III Section III- 6.8.4 for guidance on toe blankets


      II- 6.9 Gravity distribution

      II- 6.9.1 DESCRIPTION

      In gravity distribution systems effluent is distributed in non-pressurized pipe laterals, or allowed to discharge directly into a chamber or other gravelless system.


      II- 6.9.2 SIZING


      II- 6.9.3 SPECIFICATION AND INSTALLATION

      Table II- 40. Gravity system piping


      Lateral pipe size and termination

      Use perforated pipe that:

      Or use pipe that meets CSAB182.1-M92 or CGSB 41-GP-31

      Lateral pipe slope

      Install pipe level, or with a positive slope in the direction of flow not exceeding 5 cm in 30 m (0.2%).

      Lateral pipes from flow splitter to dispersal trench or bed

      Use solid walled pipe installed with a minimum 1% slope.

      Gravelless systems

      Follow the manufacturer’s recommendations for pipe specification and installation.

      Seepage Bed below CTDS

      For a seepage bed below a Combined Treatment and Dispersal System, there is no requirement for additional pipes.

      • Minimum 75 mm (3″) nominal diameter.

      • Capped at end, or with cleanout or looped to adjacent lateral if level.

      • Has perforations of minimum 12.5 mm (1/2″), maximum 25 mm (1″) diameter and minimum 125 mm (5″), maximum 250 mm (10″) separation between perforations.

      • Has two rows of perforations, facing at 4 and 8 O’clock (60 degree separation).

      Table II- 41. Trickling gravity systems


      To split the flow specify either:

      Installation of flow splitters

      Lateral length variation

      Specify gravity distribution laterals of approximately equal length (± 10%).

      Setup of flow splitters

      When commissioning the system, adjust the flow splitters to provide even division of flow.

      • Distribution Box with flow adjusting devices (e.g. speed levellers), or

      • Tipping Distribution Box, or

      • Splitter tee(s)

      • Install Distribution Box or splitter tee level on a compacted soil or gravel base.

      • Use Distribution Boxes that are watertight and resistant to corrosion.

      • Provide access for maintenance using a riser or valve box extended to finished grade.


      Table II- 42. Dosed Gravity systems


      To split the flow specify either:

      Reduction of flow velocity for dosing flows

      Provide a system to reduce the effluent flow velocity entering D – Boxes or drop boxes, to prevent short circuiting.

      Installation of flow splitters

      Provide maintenance access to all flow splitters, including pressure manifold orifices.

      Lateral length variation

      Specify gravity distribution laterals of approximately equal length (± 10%), except for pressure manifold systems.

      Setup of flow splitters

      When commissioning the system, adjust the flow splitters to provide even division of the flow.

      Dosing method

      Specify a pump or other device, with control and tank sizing complying with Section II- 6.12

      Dose frequency

      Specify at least one dose per day, based on DDF.

      Dose volume

      Plan for the volume of each dose to be equal to at least 67% of the draining volume of the dispersal and distribution piping.

      Pipe

      As for trickling gravity systems.


      II- 6.10 Pressure distribution

      II- 6.10.1 DESCRIPTION

      In pressure distribution systems effluent is distributed in pressurized pipe laterals.


      II- 6.10.2 SIZING

      Undertake and document full hydraulic calculations for the system.


      II- 6.10.3 SPECIFICATION AND INSTALLATION

      Table II- 43. Pressure distribution systems


      Variation in Orifice discharge

      Plan and adjust the system for a maximum variation of 15% across the network, and a maximum of 10% along any single lateral.

      Residual pressure (squirt)

      Plan and adjust for a minimum 60 cm (24″) of residual pressure, when using

      4.8 mm (3/16") and larger orifices. Plan for a minimum residual pressure of 150 cm (60”) if using orifices smaller than 4.8 mm.

      Dosing frequency

      Plan and adjust to provide a dosing frequency (doses per day) that complies with Section II- 5.2.2.

      Distribution uniformity

      Meet minimum standards for uniform distribution, per Section II- 5.2.1.

      Infiltrative surface per orifice

      Specify a maximum of 0.56 m2 (6 ft2) of infiltration surface area per orifice.

      Orifice size

      Use a minimum orifice diameter of 3.2 mm (1/8″).

      Orifice shields

      Provide for orifice shields on all orifices, except for upward-facing orifices inside of infiltration chambers or inside other gravelless systems that act as orifice shields.

      Lateral pipes

      Sloping sites

      Specify layout to avoid drain down to lower laterals.

      • Install laterals level, or with a positive slope in the direction of flow not exceeding 5 cm in 30 m.

      • For laterals that drain back into the manifold, and have all orifices facing up, the laterals may slope toward the manifold at a grade of 2% or less.

      • Provide access for testing and maintenance using cleanouts constructed with 45 degree elbows or sweeps.


      II- 6.11 Subsurface Drip Dispersal

      II- 6.11.1 DESCRIPTION

      Subsurface Drip Dispersal (SDD) systems use timed dosing of filtered effluent to pressurized small diameter tubing laterals with drip emitters (dripline).


      II- 6.11.2 SIZING

      • Select HLR following the standards of Section II- 5.5.2.1

      • Determine the minimum area of infiltrative surface (AIS) for the dispersal bed (AIS = DDF ÷ HLR)

      • Determine the minimum dripline length, based on 0.6 m effective width for the dripline,

        • Dripline length (m) = AIS (m2) ÷ 0.6 m

      • Determine the minimum number of emitters, based on 0.6 m emitter spacing (= dripline length (m) ÷ 0.6 m)

      • Adjust the line and emitter spacing, where appropriate, but do not reduce the AIS

        • Line spacing may only be decreased to less than 0.6m if additional line is used (i.e. do not reduce the AIS).

          Undertake and document full hydraulic calculations for the system, including all phases of operation (pressurizing, dosing, flushing and (if used) drain back). See Volume III for guidelines


          II- 6.11.3 SPECIFICATION AND INSTALLATION

          Table II- 44. Subsurface drip dispersal


          Type 1 emitters

          Raised systems

          Fill sand for raised systems

          For SDD to raised systems specify fill sand to either:

          If using manufacturer recommended fill sand, use the manufacturer recommended HLR for that sand, see Section II- 5.5.2.1.

          Dripline and emitters

          Use driplines specifically designed for wastewater use, with a purple stripe or purple colour, and designed to prevent root intrusion.

          Dripline installation depth or cover

          Install driplines for a finished cover thickness of 15 to 30 cm over the driplines.

          Dripline minimum pressure at flush manifold

          To meet manufacturer specifications during dosing, and, for continuous flush systems, during flushing.

          Air valves in the dispersal system

          Specify and install according to manufacturer recommendations.

          • For Type 1 effluent, increase the number of emitters to 4 times the minimum number calculated.

          • Specify a maximum emitter flow rate of 2.5 L/hour (0.66 USgal/hour).


          Table II- 45. Subsurface drip dispersal, filtration, dosing and flushing


          Fine filter

          Dosing

          Distribution uniformity

          Meet minimum standards for uniform distribution, per Section II- 5.2.1

          Flushing

          Provide for automatic intermittent flushing or continuous flushing.

          Dripline minimum flushing velocity

          System flush return

          Intermittent flushing

          • Use a maximum aperture size recommended by the manufacturer.

          • For screen filters, use a maximum pressure differential of 2 psi (14 kPa) at peak flow.

          • For disc filters, use a maximum pressure differential of 7 psi (50 kPa) at peak flow.

          • If a filter requires manual cleaning, then specify a filter that is large enough to allow for at least 12 months between cleaning.

          • 0.15 m/sec (0.5 ft./sec) for dripline with antimicrobial lining

          • 0.6 m/sec (2 ft./sec) for other dripline

          • Is to be maintained for all lines during flushing for all systems

          • Ensure flush return will not cause scouring or disturbance in the tank if returned to a septic tank.

          • For continuous flush systems that return the flushed water to a septic tank or treatment plant, increase the tank or plant capacity to accommodate the additional flow into the tank.

          • Any flow adjustment is to be contamination resistant and readily cleaned (a standard ball valve is not suitable).

          • Use a contamination resistant control valve.

          • For Type 1 systems, flush at least once per day at DDF.

          Notes: Follow manufacturer recommendations only where consistent with SPM standards.


          II- 6.12 Dosing systems

          II- 6.12.1 DESCRIPTION

          Dosing systems provide doses of effluent to gravity or pressure distribution systems or subsurface drip dispersal systems using pumps or other devices.


          II- 6.12.2 SIZING

          For dosing of distribution laterals, use a pump, siphon, floating outlet device or any other method that adequately pressurizes or doses the system.


          II- 6.12.3 SPECIFICATION AND INSTALLATION

          Specify tanks and access provisions according to Section II- 6.4 standards.

          Table II- 46. Pump chambers (tanks)


          Pump disconnect

          Float switch or level sensor

          To attach the float switch or level sensor, install a bracket, float tree, or other independent support.

          Access

          Install the fittings, rope, and bracket (above) so that that a maintenance provider can reach them within 15 cm of the top of the riser.

          Pump and float wiring connections

          Alarm

          Timed dose systems, override (lag) event

          Timed dose systems, equalization volume

          Install the dosing pump controls so that the equalization volume is at least 67% of the Daily Design Flow, for DDF less than 9100 L/day.

          Alarm reserve

          For demand dosing and timed dosing, plan for the tank holding volume, above the high level alarm, to be at least 50% of the Daily Design Flow volume.

          • Install a pump disconnect fitting so that the maintenance provider can remove the pump.

          • Install a rope (>1 cm diameter), cable or chain to remove the pump.

          • Connect all wiring according to the BC Electrical Code.

          • Seal all openings where cables enter the riser.

          • Provide an adequate length of cable to allow removing the float switches and pump without disconnecting the wiring.

          • Install a system to trigger an alarm when the fluid level reaches a specified height.

          • Use an alarm that is visible (usually a flashing light) and audible over a distance of at least 30 metres.

          • Connect the alarm to a different electrical circuit from the pump.

          • Specify the override event so that dosing does not exceed DDF unless the override event is triggered with or after the alarm.

          • Specify the override event as a timed dose event (not as demand dosing).

          Note: The alarm reserve volume may include surcharge volume in treatment tanks, if the tanks are suitably vented. The “alarm reserve” is the holding volume of the tank, or connected tanks, that is above the high level alarm and is below the point at which the sewage would back up to the building sewer, or overflow.


          Table II- 47. Siphons and floating outlet devices


          Cycle counter

          Use a float switch, or other method, to count the number of cycles (and to help detect trickling failure).

          Overflow and alarm reserve (above alarm)

          If an overflow is specified to the discharge line, then the alarm reserve may be set at 25% of DDF. Otherwise, set the alarm reserve for at least 50% of DDF.

          Alarm*

          Installation

          Follow manufacturer recommendations.

          • Specify an alarm triggered by a level sensor or a float switch.

          • Use an alarm that is visible (usually a flashing light) and audible over a distance of at least 30 metres.

          • Alarm to be on prior to overflow of the dosing chamber.

          Notes:

      • *For residences without a reliable power supply, the dosing system can be installed without an alarm, if using a gravity collection system, and provided that the owner is informed of the risk of backup and is prepared to respond appropriately.

      • The alarm reserve volume may include surcharge volume in treatment tanks, if the tanks are suitably vented. The “alarm reserve” is the holding volume of the tank, or connected tanks, that is above the high level alarm and is below the point at which the sewage would back up to the building sewer, or overflow.


        II- 6.13 At-grade beds

        II- 6.13.1 DESCRIPTION

        An at-grade bed is an aggregate bed placed on prepared topsoil of a site, into which effluent is distributed by pressure.


        II- 6.13.2 SIZING

      • Determine the minimum system contour length (Length = DDF ÷ LLR). Adjust the length if the bed is to be installed on a concave contour. Select a bed length that exceeds this minimum length and fits the site.

      • Determine minimum required area of infiltrative surface (AIS) for the bed (AIS = DDF ÷ HLR)

      • Calculate the minimum effective bed width needed, (AIS ÷ selected length), adjust the bed length to keep the bed width 3 m or less

      • For a low slope or flat site (≤2% slope), the minimum total bed width needed is = effective bed width

      • For a sloping site, the minimum total bed width = effective width + 60 cm

      • Calculate the overall minimum system width = bed width + 3m

      • Calculate the overall minimum system contour length = bed length + 3 m


        II- 6.13.3 SPECIFICATION AND INSTALLATION

        Table II- 48. At-grade beds


        Effective bed width

        Not to exceed 3.0 m (10 ft.)

        Bed spacing

        Install only one long bed.

        Distribution

        Distribution laterals, flat site

        Distribution laterals, sloping site

        Aggregate

        Aggregate depth

        Provide at least the following depths of aggregate:

        Aggregate installation

        Follow installation procedure for sand mound media, but do not scarify aggregate into soil. If blinding layer is used, this can be scarified into soil.

        Cover soil

        Observation ports

        • Pressure distribution only.

        • Specify at least one orifice per 60 cm (24 in.) of a lateral.

        • With one lateral, locate at bed centerline.

        • If there is more than one lateral, space evenly in bed.

        • Lateral spacing 60 cm (24 in.) maximum.

        • Minimum spacing 30 cm (12 in.) from lateral to bed edges.

        • Lateral or first lateral placed at 60 cm (24 in.) from upper edge of bed

        • Lateral spacing 60 cm (24 in.) maximum.

        • Do not place lateral pipes in the down slope half of bed effective width.

        • 15 cm (6 in.) (at bed edges).

        • 23 cm (9 in.) below the lateral pipes.

        • 5 cm (2 in.) above the lateral pipes.

        • Minimum two along the downslope edge of the bed (10 – 15 cm from the distribution pipe).

        • For flat sites, install at opposite edges of the bed at same spacing.

        Note: This technique does not apply for gravelless systems or CTDS.


        II- 6.14 Alberta At Grade system (AAG)

        II- 6.14.1 DESCRIPTION

        An “Alberta At Grade system” is a gravel-less chamber system placed on and undisturbed native topsoil L-F- H horizon, into which Type 2 or Type 3 effluent is distributed by pressure. Note that Alberta At Grade systems are restricted to certain sites and soil type, see Table II- 6 (page II-16).


        II- 6.14.2 SIZING

      • Determine the minimum system contour length (Length = DDF ÷ LLR). Adjust the length if the bed is to be installed on a concave contour. Select a bed length that exceeds this minimum length and fits the site.

      • Determine the minimum required area of infiltrative surface (AIS) for the chambers only, using: AIS = DDF (L/day) ÷ 35 (L/day/m2)

      • Select a soil HLR for the native soil that underlies the L-F-H (organic) soil horizon.

      • Determine minimum required basal area (effective native soil AIS) for the entire Alberta At Grade system using this soil HLR, (AIS = DDF ÷ HLR):

        • Calculate the distance that the cover material needs to extend downslope, to provide the full effective basal AIS calculated in the step above.

        • For slopes of 1% or less, consider cover material in all directions from the chambers as part of the effective basal (native soil) AIS.


          II- 6.14.3 SPECIFICATION AND INSTALLATION

          Table II- 49. Alberta At Grade systems


          Effluent type

          Type 2 or type 3 only

          Maximum allowable HLR to base of chambers

          35 L/day/m2

          Infiltrative surface

          This system is only to be used where surface has at least 5 cm thick L-F-H horizon (or equivalent loose organic material layer) prior to installation.

          Chamber bed width

          Not to exceed 3.0 m.

          Chamber level

          Bed spacing

          Install only one long bed.

          Distribution

          Dosing

          Use timed dosing or micro-dosing, according to Table II- 43 (page II-53).

          Observation ports

          Provide two infiltrative surface observation ports per chamber lateral.

          • Install chambers with the long axis level to within 2%, end to end, and in any 3 m long segment.

          • Also, install chambers level within 10 cm for any 60 cm long segment.

          • Distribute by pressure with enough orifices to provide a maximum infiltration area inside the chamber of 0.56 m2 (6 ft2) per orifice.

          • Provide at least one orifice per 60 cm linear of chamber.


          Table II- 50. Alberta At Grade systems, cover and installation


          Cover material

          Cover material dimensions

          Cover the system to the following minimum dimensions:

          Protection during installation

          Traffic protection

          Protect the bed and receiving area from heavy machinery at all times.

          • Wood chips (not cedar).

          • A mixture of wood chips with up to 50% Loamy Sand or Loamy Fine Sand soil.

          • May add up to 15 cm cover soil over wood chips and seed the cover soil.

          • 30 cm minimum height above chamber, maintained after settling

          • A minimum of 60 cm measured horizontally from the edge of the chamber to the edge of the cover chips.

          • Cover the entire native soil infiltration surface and side slopes

          • Finish side slopes at a maximum slope of 3h:1v, or up to 2h:1v with erosion control matting.

          • Do not disturb the L-F-H horizon in the chamber bed or basal area prior to or during installation.

          • Avoid machine travel on the bed, basal or receiving areas.

          Note: This technique is only to be used with gravelless chambers, see Table II- 36 (II-47).


          II- 6.15 Sand mounds and sand lined trenches and beds

          II- 6.15.1 DESCRIPTION

          This section applies to sand-based systems where effluent is dispersed to a bed on the sand using either pressure distribution or subsurface drip dispersal with timed dosing (not gravity distribution or CTDS).

          Note that Type 1 sand lined beds and Type 1 bottomless sand filters (above grade sand lined beds) are restricted to certain soil types; see Table II- 6 (page II-16.


          II- 6.15.2 SIZING

      • Select the bed length based on the minimum required system contour length following Table II- 26 (page II-38).

        • If using the LLR table, then the minimum bed length = DDF ÷ LLR. Use LLR values for the native soil, not the sand. Adjust the length for concave ground surface, if necessary.


      • Calculate the minimum required area of infiltrative surface (AIS) for the bed using AIS = DDF ÷ the sand media HLR. Select the sand media HLR following II- 5.5.3.


      • Select a bed length that matches the site and exceeds the minimum required.

      • Calculate the minimum required bed width (AIS ÷ selected system contour length).

      • Select the minimum required sand depth from Table II- 17 (page II-28).

      • Select the basal HLR for the native soil following Section II- 5.5.3.

      • Calculate the minimum required basal area (native soil area of infiltrative surface) (AIS) for the base of the sand mound (AIS = DDF ÷ basal HLR).

      • Check that the effective basal area is larger than the minimum required basal area. Adjust the layout as needed to meet requirements.


        II- 6.15.2.1 Basal area

        Calculate the effective basal (native soil area of infiltrative surface) AIS as follows:

      • For a sand mound on a sloping site:

        • The effective basal area is the area directly below the dispersal bed, plus the area below sand media directly downslope from the dispersal bed.

      • For a sand mound on a low slope (≤2% slope) or a flat site or for sand lined trenches and beds:

        • The effective basal area is the area directly below the dispersal bed, plus the area below sand media around the perimeter of the dispersal bed within a 3h:1v slope.

      • The base of the sand mound is considered part of the effective infiltration area only where the depth of sand exceeds 15 cm, plus cover soil (total minimum depth 25 cm).

      • Adjust the basal AIS in proportion to the surface area covered by obstructions.


      II- 6.15.3 SPECIFICATION AND INSTALLATION

      Table II- 51. Sand Mounds and sand lined trenches or beds


      Maximum dispersal bed width

      Bed level

      Spacing, minimum

      Aggregate for bed (note that gravelless systems may also be used)

      <1% by weight passing the #200 (75µm) sieve, and meeting the standards of Table II- 35 (page II-46).

      Aggregate depth (pressure distribution system)

      Install aggregate to the following minimum depths:

      Sand media

      Specify and supply sand meeting Table II- 25 (page II-37).

      Permeable fill media for sand mound toe, toe blanket or mantle

      Observation port, completed to aggregate bed infiltrative surface

      Minimum two ports, install at minimum 10 cm from the distribution pipe.

      Observation port, completed to the soil infiltrative surface

      • 3.0 m (10 ft.) for a sand mound or sand lined bed.

      • 90 cm (36 in.) for a sand lined trench.

      • Bed level to ± 1.25 cm (± 0.5 in.).

      • Not necessary for subsurface drip dispersal.

      • For pea gravel, provide min. 10 cm (4 in.) under the distribution piping and 2.5 cm (1 in.) over the piping.

      • For drain rock, provide min. 15 cm (6 in.) under the distribution piping and 5 cm (2 in.) over the piping.

      • Test the sand to confirm a minimum Kfs of 3000 mm/day or a perc rate faster than 3 min/inch after settling.

      • Install the sand following the same procedure as for Mound Sand

      • See Volume III for guidance on toe blankets and sand mantle sand mounds.

      • Minimum 2, located 1/6 of length of bed from ends of bed, on downslope side of bed (or on opposing sides for flat site), and half way between the bed and the toe of the mound.

      • Place observation ports at least 30 cm from the nearest orifice.


      Table II- 52. Sand mounds and sand lined trenches or beds, cover


      Separation and cover soil

      Supply cover soil meeting standards of Table II- 35 (page II-46) (Sandy Loam or Loamy Sand).

      Cover depth

      Cover slope over bed

      Install cover to provide at least 15 cm (6 in.) fall from the center of the bed to the outside edges.

      Edge of sand mound bed

      Provide at least 30 cm (12 in.) from the edge of the gravel bed to the finished surface of the sand mound.

      Maximum side slope

      Limit the side slopes to no steeper than 2h:1v

      • Install a minimum 15 cm (6 in.) soil cover over the aggregate bed.

      • Limit the thickness of cover to a maximum of 45 cm (18 in.).

      • For any cover thicker than 15 cm (6 in.), make up the additional depth with sand media and top with cover soil.

      Table II- 53. Bottomless sand filters


      Edge of liner unit above grade

      Extend the liner to at least 15 cm above grade, and slope the ground away from the sand filter.

      Liner

      0.76 mm (0.030″ or 30 mil), fabricated from PVC, HDPE or EPDM, with seams sealed or welded.

      Separation to trees/shrubs

      Provide a minimum 3 m separation to the nearest tree or shrub, or use a root barrier fabric.

      • Seal the sand filter walls with an impermeable liner of minimum thickness

      • Seal all penetrations using a waterproof boot.

      • Extend the bottom of the liner at least 15 cm (6 in.) into the native soil.

      Table II- 54. Sand mounds and sand lined trenches and beds, dosing and distribution


      Type of distribution

      Orifice spacing

      Provide enough orifices for at least one orifice for every 0.56 m2 (6 ft2) of infiltration bed area.

      Orifice or drip emitter separation

      Install orifices or emitters at least 30 cm (12 in.) from the outside and end of the infiltration bed.

      Type of dosing

      Use demand or timed dosing only if sand hydraulic loading rate is less than or equal to the Type 1 HLR in Table II- 24 (page II-37). Otherwise, use micro- dosing.

      Demand dosing

      Limited to:

      Micro-dosing

      If using micro-dosing, then follow Section II- 5.2.2.3. Base the dosing frequency on the depth of sand.


      Table II- 55. Sand mounds and sand lined trenches and beds, installation


      Moisture content and soil damage

      Clearing land (sand mounds)

      Scarification

      Installing sand, (including mantle or toe blanket) installation

      • Cut the vegetation close to the ground.

      • Remove heavy sod.

      • Remove any deep organic litter layer to expose the underlying mineral soil.

      • Do not remove large stumps or boulders.

      • Scarify the soil surface over the entire area where sand fill will be placed.

      • Scarify to a minimum 15 cm depth, sand may be gently mixed into the native soil.

      • Do not move machinery over the scarified area until at least 20 cm (8 in.) of sand has been placed and keep a minimum of 15 cm (6 in.) below the tracks at all times.

      • Used only tracked machinery with a maximum 7 psi (50 kPa) ground pressure.

      • Settle the sand.

      • Do not compact the sand.

      • Keep sand and aggregate clean before and during placement.


      II- 6.16 Combined Treatment and Dispersal Systems (CTDS)

      Combined Treatment and Dispersal Systems (CTDS) are systems that provide treatment to Type 2 or 3 standards using media or through other processes in the same cell or unit that disperses effluent to the native soil. These systems discharge effluent at their base (or around an up-flow treatment unit) to native soil, or to sand above native soil.

      In some cases a sand layer is used as part of the treatment system.

      As with other systems, a sand layer may be used to increase vertical separation where this is allowed by the standards.

      For proprietary CTDS systems, follow the manufacturer’s guidelines when sizing and specifying the treatment system. See Volume III, Section III- 4.2 for guidance on treatment system selection.

      Where the treatment system is installed in an enclosure, ensure the enclosure meets the standards of Section II- 6.4.

      Follow the standards of this Manual when sizing and specifying dispersal to native soil or sand media fill plus native soil. As with all dispersal systems, the dispersal component of the CTDS system is to follow the standards of this manual.


      II- 6.16.1 POINT OF APPLICATION

      The “Point of Application” is the location at which the treatment system meets the effluent quality standards of the SSR for the defined treatment method (Type 2 or Type 3). This is the same point at which monitoring is carried out. Vertical separation is measured from this point.

      This “point” will typically be an elevation in the system and will typically be a horizontal plane at that elevation. The AP will specify this point of application, and draw an elevation schematic that shows the point of application and the vertical separation.

      For an example and diagram illustrating the Point of Application, see Volume III.


      II- 6.16.2 BASAL AREA AND DISPERSAL SIZING

      Select the basal (soil) HLR from Table II- 22 and Table II- 23 (page II-36), based on the treatment type (1, 2 or 3) to be claimed at the Point of Application.

      Size the soil dispersal system following the standards of this Manual (Section II- 5.5), based on the level of treatment specified at the point of application. Use the standards in Section II- 5.6 to select the minimum required contour length for the dispersal system.

      If the CTDS Point of Application is defined as the interface to the native soil, and no coarse aggregate or gravelless bed is installed below the CTDS, then the effective basal area (native soil area of infiltrative surface) is the area directly below the CTDS.

      If a coarse aggregate or gravelless bed is installed below the CTDS then the native soil area of infiltrative surface and system contour length is determined as for Seepage Beds.

      When sizing the dispersal system:


      In all cases, mark out and protect a reserve bed area, of equal size to the constructed bed. Locate the reserve area so that it does not add to flow downslope from the primary bed.


      II- 6.17.3 SPECIFICATION AND INSTALLATION

      Table II- 56. ET and ETA beds


      Reserve area

      See requirement above.

      Liners for ET beds

      Infiltrative surface, for ETA beds

      Prepare the infiltrative surface in the same way as for Seepage Beds. Scarify any smeared sidewalls.

      Distribution

      Gravity distribution (including trickling sequential) may be used for any size of bed and any type of effluent.

      Water budget calculations

      Layout

      ET and ETA beds do not need to meet the minimum system contour length or LLR standards.

      Sand media

      Select the sand to ensure effective capillary rise greater than depth of bed. Consider the need for oxygen transport.

      Protection

      Provide physical barriers to keep vehicle traffic off the bed. Do not compact snow on the bed.

      Observation ports

      Minimum of four, nominal 100 mm (4") or larger diameter pipe, at least one in each quarter of the bed, and 10 - 15 cm from outermost laterals.

      High level alarm (freeboard) for bed

      Set and alarm to trigger when the ponded effluent level rises to within 20 cm of finished grade, in the lowest part of the bed.

      • Provide a watertight membrane liner, minimum thickness 0.76 mm (0.030″ or 30 mil), fabricated from PVC, HDPE or EPDM.

      • Use boots to seal any penetrations of the liner.

      • Do not damage the membrane liner.

      • Ensure that effluent will not saturate to grade at any time

      • Document the water budget calculations.


      II- 6.18 BC Zero Discharge Lagoons

      II- 6.18.1 DESCRIPTION

      A BC zero discharge lagoon system consists of one or more large excavated lagoon cells surrounded by a berm. BC zero discharge lagoons disperse effluent by infiltration to soil and by evaporation from the lagoon surface.

      These systems are restricted to certain soil types, sites and climates, see Table II- 6 (page II-16), and have specific vertical and horizontal separation conditions.


      II- 6.18.2 SIZING

      For typical residential sewerage systems, size the lagoon following the Table II- 57, or Table II- 58, or Table II-

      59. Lagoons do not use conventional HLR tables or system contour length standards of the SPM. In all cases:

      • The total surface area is calculated from the top inside edge of the berm, not the water surface.

      • The lagoon depth is measured from the top of the berm to the inside floor.

        The volume is the water volume in the lagoon, when the water level is 0.6 m below the top of the berm (0.6 m of freeboard).

        Ensure the lagoon berm has:

      • Outside of berm slope of 3h:1v or flatter, seeded with grass.

      • A height above original grade of more than 0.9 m and maximum 1.5 m, and minimum top width of 1.2 m.


        II- 6.18.2.1 Alternate sizing

      • Lagoons may be sized based on retention volume of one to two years average sewage flow depending on the area in which they are installed and a with a minimum surface area meeting the above tables to facilitate evaporation.

      • For a larger DDF, increase lagoon size accordingly. If the average flow is anticipated to be greater than 50% DDF, increase size (area and volume).

      • Where lagoons are sized to hold less than 2 years average sewage flow, reserve an area next to the installed cell for a second cell large enough to bring the total volume to 1 year DDF.

        Table II- 57. Rectangular Lagoon Cell Sizing—Wetter Northern Interior BC



        BEDROOMS


        ESTIMATED DDF (L/DAY)

        VOLUME (CUBIC METRES)


        DEPTH (METRES)

        BOTTOM INSIDE (METRES)


        TOP INSIDE (METRES)

        TOTAL SURFACE AREA

        (SQUARE METRES)

        1-2

        1000

        415

        3

        14 x 4

        26 x 16

        416

        3

        1300

        508

        3

        16 x 5

        28 x 17

        476

        4

        1600

        661

        3

        20 x 6

        32 x 18

        576

        5

        1900

        777

        3

        22 x 7

        34 x 19

        646

        6

        2200

        972

        3

        24 x 9

        36 x 21

        756

        Notes:


      • Side slope internal 2h: 1v

      • Surface area: Volume ratio is 0.55 to 0.65.

        Table II- 58. Rectangular Lagoon Cell Sizing—Drier Northern Interior BC



        BEDROOMS


        ESTIMATED DDF (L/DAY)

        VOLUME (CUBIC METRES)


        DEPTH (METRES)

        BOTTOM INSIDE (METRES)


        TOP INSIDE (METRES)

        TOTAL SURFACE AREA

        (SQUARE METRES)

        1 – 2

        1000

        185

        3

        6 x 4

        15x 13

        195

        3

        1300

        255

        3

        7 x 6

        16x 15

        240

        4

        1600

        305

        3

        8 x 7

        17x 16

        272

        5

        1900

        389

        3

        10 x 8

        19x 17

        323

        6

        2200

        445

        3

        12 x 8

        21x 17

        357

        Notes:

      • Limit the berm internal side slope to no steeper than 2h: 1v, except for excavated slopes. For excavated slopes, use a maximum slope of 1:1. The table above is based on a berm inside slope of 1.5h: 1v.

      • Surface area: Volume ratio is 0.8 – 1.7.

      • Reserve an area large enough to install a second cell of the same size.

      Table II- 59. Circular Lagoon Cell Sizing Standards—Northern B.C.



      BEDROOMS


      ESTIMATED DDF (L/DAY)

      VOLUME MAX. WATER LEVEL (CUBIC METRES)


      DEPTH (METRES)


      TOP INSIDE DIAMETER (METRES)


      BOTTOM DIAMETER (METRES)


      TOTAL SURFACE AREA (SQUARE METRES)

      1 – 2

      1000

      542

      4

      22

      6

      380

      3

      1300

      619

      4

      23

      7

      415

      4

      1600

      791

      4

      25

      9

      490

      5

      1900

      985

      4

      27

      11

      572

      6

      2200

      1,260

      4

      29.5

      13.5

      683

      Note: Limit the internal berm side slope to 2h: 1v.


      II- 6.18.3 SPECIFICATION AND INSTALLATION

      Table II- 60. BC zero discharge lagoons, general


      Septic tank (optional)

      Gravity discharge from a septic tank to the lagoon, small diameter pipe systems

      Gravity discharge to a lagoon (without a septic tank)

      Provide cleanouts per Table II- 29 (page II-42).

      Install sewer pipes with a minimum grade of 1.5 % for a 3'' pipe, or 1% for a 4" pipe.

      Pipe outlet (gravity)

      Extend the pipe a minimum of 2 m into the lagoon, and 30 cm above the lagoon bottom.

      Pumped discharge

      Fencing

      • If planning a system with a septic tank, use a tank with a working volume at least 2 times DDF.

      • Specify an effluent filter.

      • Required for pumped discharge systems.

      • Select the pipe to achieve a minimum flow velocity of 0.15 m/sec.

      • Use a pipe size of 50 mm to 100 mm (2” to 4”).

      • Cleanouts are not required.

      • Ensure there is minimum 30 cm elevation drop from the septic tank outlet pipe invert to the top of the berm, at the lowest point of the berm.

      • Dosing, see Section III- 6.12 for specification of pump, tank and controls

      • There is no specific dose size or frequency requirement.

      • Fit the force main with a backflow preventer, with unions and a shut off valve for maintenance (unless the force main drains back to the pump tank after each dose).

      • At the lagoon berm, provide a siphon break in the force main above the berm overflow level; provide access for maintenance inspection.

      • Install a fence around the full perimeter of the lagoon, with a locking gate.

      • Post warning signs.


      II- 6.19 Site drainage

      Table II- 61. Site drainage (interception or relief drains)


      Barrier membrane (where used)

      Discharge, if subsurface

      Provide an observation port and cleanout at the point of discharge.

      Discharge, if to surface

      Provide a corrosion-resistant animal guard; and provide access for maintenance.

      Observation ports and maintenance access

      • For a barrier membrane on an interceptor drain, use a PVC, HDPE or EPDM membrane of minimum thickness 0.76 mm (0.30″ or 30 mil).

      • Seal the membrane at the seams

      • To be installed to avoid damage to the membrane.

      • Extend the membrane under the drainpipe.

      • Provide at least one observation port extending to the base of drain.

      • Provide at least one drain cleanout.


    7. MAINTENANCE AND MONITORING STANDARDS

      II- 7.1 Maintenance and monitoring frequency

      As maintenance is critical to the proper functioning of a sewerage system, the homeowner is responsible under the SSR to ensure that the appropriate maintenance and monitoring is carried out for all components of the system. Accordingly, emphasize to the homeowner the importance of regular maintenance by or under the supervision of an AP, following the schedule in the maintenance plan. Effective maintenance becomes increasingly critical as system complexity increases.

      Specify the initial schedule of system maintenance in the maintenance plan. Table II- 62 shows minimum intervals for maintenance visits and testing for the first 12 to 14 months of operation. Local government bylaws (where they exist) may also stipulate maintenance intervals.

      After that time, consult with the maintenance provider to jointly establish the maintenance and monitoring frequency for the next 5 to 10 years of operation. Then, file an amended maintenance plan with the Health Authority. The minimum long term maintenance frequency is 2 years for systems with Type 2 or 3 treatment systems and 5 years for all other systems.

      Table II- 62. Minimum initial frequencies for maintenance and monitoring


      SYSTEM OR TREATMENT TYPE

      INSPECTION (BY

      MAINTENANCE PROVIDER)


      FLOW


      BOD AND TSS


      FECAL COLIFORMS


      NOTES

      Type 1

      12 months

      12 months




      ET or ETA

      6 months

      6 months



      During the wet season

      Type 2

      6 months

      6 months

      6 months




      Type 3

      1 month,

      7 months,

      13 months

      1 month,

      7 months,

      13 months

      1 month,

      7 months,

      13 months

      1 month,

      7 months,

      13 months


      Lagoon

      12 months




      Flow monitoring for diagnosis only


      II- 7.1.2 MAINTENANCE PLAN

      See Section II- 3.7.1for maintenance plan requirements.


      II- 7.1.3 TREATMENT SYSTEM MONITORING

      For Type 2 and 3 systems, plan a safe method to collect effluent samples for laboratory testing. During operation, collect and test samples according to the maintenance plan.

      Confirm that each sample complies with the effluent quality standards in the Sewerage System Regulation, and with any additional standards established for that system.


      II- 7.2 Maintenance procedures

      During maintenance, examine and test components of the sewerage system. Monitoring is part of maintenance. See Volume III for guidance on documentation and on maintenance procedures.



      SEWERAGE SYSTEM

      STANDARD PRACTICE MANUAL

      VOLUME III - GUIDELINES

      VERSION 3 SEPTEMBER 2014

      HEALTH PROTECTION BRANCH

      MINISTRY OF HEALTH

      Volume III Table of Contents

        1. Introduction I-1

  2. 1.1 Departure from Volume III guidelines ........................................................................................... III-1

    1. GENERAL GUIDELINES ................................................................................................................................. III-1

III- 2.1 Existing systems and system repair................................................................................................ III-1

III- 2.1.1 Emergency measures ................................................................................................................................ III-1

III- 2.1.2 Repair of an existing system .................................................................................................................. III-2

III- 2.1.3 System upgrades ........................................................................................................................................ III-2

III- 2.1.4 New use of existing systems .................................................................................................................. III-2

III- 2.1.5 Properly functioning dispersal area..................................................................................................... III-3

III- 2.2 Special circumstances ........................................................................................................................III-3

III- 2.2.1 Seasonal use ................................................................................................................................................. III-3 III- 2.2.2 Isolated and restricted access areas .................................................................................................... III-3

III- 2.2.3 Off grid systems and power outages.................................................................................................. III-4

III- 2.2.4 Multiple Homes on Same Property ..................................................................................................... III-4

III- 2.2.5 Use of Adjacent Property (off-site discharge) ................................................................................. III-4 III- 3 PROCEDURE GUIDELINES ............................................................................................................................. III-6 III- 3.1 Sewage source characterization and site use ..............................................................................III-6

III- 3.1.1 Owner responsibilities .............................................................................................................................. III-6

III- 3.1.2 Owner declaration ...................................................................................................................................... III-6

III- 3.1.3 Daily Design Flow ....................................................................................................................................... III-6

III- 3.1.4 Type of source of sewage........................................................................................................................ III-6

III- 3.1.5 Pattern of use ............................................................................................................................................... III-6

III- 3.2 Administrative and regulatory requirements ..............................................................................III-7

III- 3.2.1 Other regulations and policies which may affect sewerage systems..................................... III-7

III- 3.3 Site and soil evaluation .....................................................................................................................III-8

III- 3.3.1 Site evaluation.............................................................................................................................................. III-8

III- 3.3.2 Soil evaluation.............................................................................................................................................. III-8

III- 3.3.3 Site and soil evaluation report............................................................................................................. III-16

III- 3.4 Selecting a system based on site conditions ............................................................................. III-16

III- 3.4.1 Soil type and permeability for system selection and sizing..................................................... III-16

III- 3.5 Plans and specifications .................................................................................................................. III-17

III- 3.5.1 Filing............................................................................................................................................................... III-17

III- 3.6 Installation .......................................................................................................................................... III-17

III- 3.6.1 Significant changes to design during installation........................................................................ III-17 III- 3.6.2 Commissioning .......................................................................................................................................... III-18

III- 3.6.3 Post installation ......................................................................................................................................... III-20

III- 3.7 Letter of certification, record drawing and as installed specifications I-20

III- 3.7.1 Record drawing ......................................................................................................................................... III-20

III- 3.7.2 Maintenance plan ..................................................................................................................................... III-20

III- 3.8 Maintenance and monitoring ....................................................................................................... III-23

    1. GUIDELINE TO SELECTING A SYSTEM FOR A SITE.......................................................................................... III-24

      III- 4.1 Dispersal system selection ............................................................................................................. III-24

      III- 4.1.1 Conceptual design.................................................................................................................................... III-24

      III- 4.1.2 Site capability and system selection ................................................................................................. III-30 III- 4.1.3 Steep slopes................................................................................................................................................ III-36

      III- 4.1.4 Climate .......................................................................................................................................................... III-38

      III- 4.1.5 Flood plains ................................................................................................................................................. III-39

      III- 4.1.6 Off-site discharge ..................................................................................................................................... III-39

      III- 4.2 Treatment method and treatment system selection .............................................................. III-40

      III- 4.2.1 Type 1 (septic tank and effluent filter) ............................................................................................. III-40

      III- 4.2.2 Type 2 and 3 treatment systems ........................................................................................................ III-40

      III- 4.2.3 Matching the treatment system to the sewage flow rate and strength ............................. III-41 III- 4.2.4 Disposal of solid wastes ......................................................................................................................... III-42

    2. GUIDELINES FOR PLANNING SYSTEMS ........................................................................................................ III-43

III- 5.1 Daily Design Flow............................................................................................................................. III-43

III- 5.1.1 Confirmation of site use......................................................................................................................... III-43

III- 5.1.2 Residential Daily Design Flow rates................................................................................................... III-43

III- 5.1.3 Residential sewage and Type 1 effluent characteristics ............................................................ III-46

III- 5.1.4 Daily Design Flows for non-residential buildings ........................................................................ III-48

III- 5.2 Distribution and dosing guidelines ............................................................................................. III-54

III- 5.2.1 Types of distribution and dosing ....................................................................................................... III-54

III- 5.2.2 Dosing for uniform distribution systems......................................................................................... III-55

III- 5.3 Vertical separation ........................................................................................................................... III-62

III- 5.3.1 Minimum required vertical separation ............................................................................................. III-62

III- 5.3.2 Vertical separation for dispersal systems ........................................................................................ III-64

III- 5.4 Horizontal separation ..................................................................................................................... III-70

III- 5.4.1 Separation to fresh water ...................................................................................................................... III-70

III- 5.4.2 Separation to water wells and aquifer considerations............................................................... III-70 III- 5.4.3 Separation to sleeved water lines ...................................................................................................... III-70

III- 5.4.4 Upslope and side slope drains or breakouts ................................................................................. III-70

III- 5.4.5 Separation distances for BC zero discharge lagoons ................................................................. III-71 III- 5.4.6 Horizontal separations to reduce risk of damage or encroachment ................................... III-72 III- 5.5 Hydraulic Loading Rate .................................................................................................................. III-73

III- 5.5.1 Soil characteristics for the HLR tables .............................................................................................. III-73

III- 5.5.2 Hydraulic Loading Rate tables I-73

III- 5.5.3 Hydraulic Loading Rates for sand mounds, sand lined trenches or beds .......................... III-74

III- 5.5.4 Hydraulic Loading Rate and the influence of sodium and salinity ....................................... III-74

III- 5.6 Minimum system contour length and Linear Loading Rate (LLR) ....................................... III-75

III- 5.6.1 System contour length ........................................................................................................................... III-75

III- 5.6.2 Minimum system contour length ....................................................................................................... III-79

III- 5.6.3 Selecting and using LLR values ........................................................................................................... III-80

III- 5.6.4 Minimum system length for at grade and raised systems ....................................................... III-81 III- 5.6.5 Minimum contour length for below grade systems using sand media .............................. III-81 III- 5.6.6 Slopes with concave contour ............................................................................................................... III-81

III- 5.6.7 Sites where length is constrained ...................................................................................................... III-82

III- 5.6.8 Oxygen transport ...................................................................................................................................... III-83 III- 6 SPECIFICATION AND INSTALLATION GUIDELINES ........................................................................................ III-84 III- 6.1 Flow monitoring ............................................................................................................................... III-84

III- 6.2 Access provisions and provisions for maintenance and monitoring.................................. III-84

III- 6.2.1 Safety ............................................................................................................................................................. III-85

III- 6.2.2 Cleanouts and safety ............................................................................................................................... III-85

III- 6.3 Connections, piping and collection systems............................................................................. III-86

III- 6.3.1 Sewers ........................................................................................................................................................... III-86

III- 6.3.2 Specifications and installation ............................................................................................................. III-87

III- 6.4 Tanks, septic tanks and effluent filters, treatment systems .................................................. III-88

III- 6.4.1 Septic tanks and effluent filters (Table II- 32, page II-44)......................................................... III-88

III- 6.4.2 Tanks and tank access (Table II- 33, page II-45)........................................................................... III-91

III- 6.4.3 Tank installation (Table II- 34, page II-45) ...................................................................................... III-92

III- 6.4.4 Tank abandonment .................................................................................................................................. III-94

III- 6.5 Dispersal systems, general............................................................................................................. III-95

III- 6.5.1 Sizing and layout....................................................................................................................................... III-95

III- 6.5.2 Specification and installation ............................................................................................................... III-95

III- 6.6 Trench systems ................................................................................................................................ III-101

III- 6.6.1 Description ............................................................................................................................................... III-101

III- 6.6.2 Sizing and layout.................................................................................................................................... III-101

III- 6.6.3 Specification and installation ............................................................................................................ III-102

III- 6.7 Seepage Bed systems.....................................................................................................................III-102

III- 6.7.1 Description ............................................................................................................................................... III-102

III- 6.7.2 Sizing and layout.................................................................................................................................... III-102

III- 6.7.3 Specification and installation ............................................................................................................ III-102

III- 6.8 Shallow, at grade and raised systems ........................................................................................III-103

III- 6.8.1 Description ............................................................................................................................................... III-103

III- 6.8.2 Sizing and layout I-103

III- 6.8.3 Specification and installation ............................................................................................................ III-103

III- 6.8.4 Toe blankets............................................................................................................................................. III-103

III- 6.9 Gravity distribution.........................................................................................................................III-105

III- 6.9.1 Description ............................................................................................................................................... III-105

III- 6.9.2 Sizing and layout.................................................................................................................................... III-107

III- 6.9.3 Specifications and installation .......................................................................................................... III-108

III- 6.10 Pressure distribution ......................................................................................................................III-108

III- 6.10.1 Description ............................................................................................................................................... III-108

III- 6.10.2 Sizing and layout.................................................................................................................................... III-109

III- 6.10.3 Specification and installation ............................................................................................................ III-110

III- 6.11 Subsurface Drip Dispersal ............................................................................................................. III-112

III- 6.11.1 Description ............................................................................................................................................... III-112

III- 6.11.2 Sizing and layout.................................................................................................................................... III-113

III- 6.11.3 Specification and installation ............................................................................................................ III-115

III- 6.12 Dosing and pump chambers ........................................................................................................ III-119

III- 6.12.1 Description ............................................................................................................................................... III-119

III- 6.12.2 Sizing and layout.................................................................................................................................... III-120

III- 6.12.3 Specification and installation ............................................................................................................ III-123

III- 6.13 At-grade beds ..................................................................................................................................III-128

III- 6.13.1 Description ............................................................................................................................................... III-128

III- 6.13.2 Sizing and layout.................................................................................................................................... III-129

III- 6.13.3 Specification and installation ............................................................................................................ III-133

III- 6.14 Alberta At Grade system (AAG)...................................................................................................III-134

III- 6.14.1 Description ............................................................................................................................................... III-134

III- 6.14.2 Sizing and layout, specification and installation ....................................................................... III-134

III- 6.15 Sand mounds and sand lined trenches and beds ...................................................................III-135

III- 6.15.1 Description ............................................................................................................................................... III-135

III- 6.15.2 Sizing and layout.................................................................................................................................... III-137

III- 6.15.3 Specification and installation ............................................................................................................ III-141

III- 6.16 Combined Treatment and Dispersal Systems (CTDS)............................................................III-143

III- 6.16.1 Point of Application .............................................................................................................................. III-143

III- 6.16.2 CTDS on a distribution bed ............................................................................................................... III-144

III- 6.17 Evapotranspiration (ET) and Evapotranspiration Absorption (ETA) beds ........................III-145

III- 6.17.1 Description ............................................................................................................................................... III-145

III- 6.17.2 Sizing and layout.................................................................................................................................... III-145

III- 6.17.3 Specification and installation ............................................................................................................ III-146

III- 6.18 BC zero discharge lagoons ...........................................................................................................III-147

III- 6.18.1 Description I-147

III- 6.18.2 Sizing and layout.................................................................................................................................... III-149

III- 6.18.3 Specification and installation ............................................................................................................ III-151

III- 6.19 Site drainage ....................................................................................................................................III-153

III- 6.19.1 Description ............................................................................................................................................... III-153

III- 6.19.2 Sizing and layout.................................................................................................................................... III-153

III- 6.19.3 Specification and installation ............................................................................................................ III-154

    1. MAINTENANCE GUIDELINES ....................................................................................................................III-155

      III- 7.1 Maintenance and monitoring frequency ..................................................................................III-155

      III- 7.2 Maintenance Procedures ..............................................................................................................III-155

      III- 7.2.1 Homeowner education ........................................................................................................................ III-155

      III- 7.2.2 Local maintenance bylaws.................................................................................................................. III-155

      III- 7.2.3 Written Report of Maintenance ....................................................................................................... III-155

      III- 7.2.4 First Maintenance Service................................................................................................................... III-157

      III- 7.2.5 Minimum Scope of Maintenance .................................................................................................... III-157

      III- 7.2.6 Writing a simplified Operation and Maintenance Plan .......................................................... III-158 III- 7.2.7 Repair Work by maintenance providers ....................................................................................... III-158

      III- 7.3 Minimum Maintenance Tasks ......................................................................................................III-158

      III- 7.3.1 General maintenance tasks ................................................................................................................ III-158

      III- 7.3.2 Collection and connection systems ................................................................................................ III-159

      III- 7.3.3 Septic tanks and effluent filters, other tanks .............................................................................. III-159

      III- 7.3.4 Sewage treatment systems ................................................................................................................ III-161

      III- 7.3.5 Dispersal systems, general ................................................................................................................. III-162

      III- 7.3.6 Gravity distribution ............................................................................................................................... III-162

      III- 7.3.7 Pressure distribution............................................................................................................................. III-163

      III- 7.3.8 Subsurface Drip Dispersal .................................................................................................................. III-163

      III- 7.3.9 Dosing systems and controls ............................................................................................................ III-164

      III- 7.3.10 At-grade beds, Alberta At Grade systems, sand mounds and sand-lined trenches and beds III-166

      III- 7.3.11 ET and ETA beds..................................................................................................................................... III-166

      III- 7.3.12 BC zero discharge lagoons ................................................................................................................ III-166

      III- 7.3.13 Drainage systems................................................................................................................................... III-167

    2. Appendices 1

III- 8.1 Owner declaration 1

III- 8.2 Residual Chlorine, water softener and other backwash water 2

III- 8.3 Soils 2

III- 8.3.1 Soil test pit log form 2

III- 8.3.2 Percolation test procedure 6

III- 8.3.3 Constant head borehole permeameter test procedure 9

III- 8.4 Sodium and soil dispersion 15

III- 8.5 System Selection Worksheet template 16

III- 8.6 Imperial conversion of standards tables 18

III- 8.6.1 Design Flow tables 18

III- 8.6.2 Minimum vertical separation tables 19

III- 8.6.3 Horizontal separation tables 22

III- 8.6.4 Hydraulic Loading Rates 24

III- 8.6.5 Linear Loading rates 25

III- 8.7 Septic tank projected pump out intervals 27

III- 8.8 Pressure distribution system information 27

III- 8.8.1 Options for preventing drain down of upper to lower laterals on sloping sites 27

III- 8.9 Sand mound installation instructions 32

III- 8.10 Sand lined trench/bed diagrams 34

Volume III List of Tables

Table III- 1. Soil texture groups and texture classes I-12

Table III- 2. Soil structure and consistence categories .................................................................. III-13

Table III- 3. Simplified colour terms .............................................................................................. III-15

Table III- 4. System Selection Worksheet with instructions.......................................................... III-26

Table III- 5. Example of filled System Selection Worksheet .......................................................... III-28

Table III- 6. System applications and limitations ........................................................................... III-31

Table III- 7. Slope considerations .................................................................................................. III-37

Table III- 8. Typical and average parameters for residential sewage and Type 1 effluent ........... III-46 Table III- 9. Peak flow rates for residential sewage....................................................................... III-46

Table III- 10. Surge Flows for plumbing trap sizes........................................................................... III-47

Table III- 11. Non-residential Average Daily Flow Rate guide ......................................................... III-50 Table III- 12. Facility categories ....................................................................................................... III-53 Table III- 13. Typical soil water holding capacity (WHC) ................................................................. III-58

Table III- 14. Minimum dosing frequency for timed dosing, with SPM HLR for SDD ...................... III-61 Table III- 15. Micro-dosing frequency, with SPM HLR for SDD........................................................ III-61

Table III- 16. Guidelines for minimum horizontal separation distances ......................................... III-72 Table III- 17. Depth change equivalent to ten litres in round risers of various interior diameters. III-92 Table III- 18. Geotextile Specification for separation layer ............................................................. III-96 Table III- 19. Lateral layout for at-grade beds on flat and low slope sites (≤ 2%) ......................... III-129 Table III- 20. Minimum number of laterals for at-grade beds on sloping sites (> 2%).................. III-130


Volume III List of Figures

Figure III- 1. Vertical Separation between the Infiltrative Surface and the Restrictive Layer I-63

Figure III- 2. Schematic cross sections showing upslope drain and subsurface dam ..................... III-71

Figure III- 3. Example of “stacking” a system, plan......................................................................... III-78

Figure III- 4. Example of “stacking” a system on a site with flow restrictive layer, section ........... III-78

Figure III- 5. Contour bed effective length (plan view)................................................................... III-81

Figure III- 6. Example of interception and relief drainage between two systems on a slope (section)

III-83

Figure III- 7. Typical two compartment septic tank ........................................................................ III-89

Figure III- 8. Typical pumped discharge from second compartment of a septic tank .................... III-90

Figure III- 9. Above grade and at grade standpipes........................................................................ III-99

Figure III- 10. Vent and Combination Vent and Observation Port Examples ................................. III-100 Figure III- 11. Trench Dispersal schematic cross section ................................................................ III-101 Figure III- 12. Distribution Box ........................................................................................................ III-105

Figure III- 13. Sequential (Drop Box) System (schematic top view) ............................................... III-106

Figure III- 14. Sequential (Drop Box) system (schematic section of box) ....................................... III-107

Figure III- 15. Pressure Distribution system terminology ............................................................... III-109

Figure III- 16. Typical Subsurface Drip System................................................................................ III-113

Figure III- 17. Pump chamber terms, with layout suitable for areas with low risk of freezing ...... III-119

Figure III- 18. Schematic of Demand Dosing Terms........................................................................ III-121

Figure III- 19. Schematic of timed dosing terms: showing example of tank with lag float ............ III-122

Figure III- 20. At-grade bed on sloping site, schematic cross section............................................. III-128

Figure III- 21. At-grade bed on sloping site, schematic plan .......................................................... III-128

Figure III- 22. Alberta At Grade system schematic cross section ................................................... III-134

Figure III- 23. Sand mound schematic cross section, showing terminology................................... III-135

Figure III- 24. Sand mantle sand mound......................................................................................... III-136

Figure III- 25. Example of Point of Application and Vertical Separation ........................................ III-144

Figure III- 26. Rectangular Lagoon .................................................................................................. III-147

Figure III- 27. Rectangular and Circular Lagoons (top view)........................................................... III-148

Figure III- 28. Circular Lagoon ......................................................................................................... III-148

Figure III- 29. Recommended north to south separation for wet and dry area lagoon sizing ....... III-150

Figure III- 30. Interception drain schematic cross section I-153


Volume III Guidelines

III- 1 INTRODUCTION

This volume is intended to be used as a companion to Volume II (standards). It contains explanatory material to support the standards as well as guidelines for planning, installation and maintenance of onsite systems. This volume is not intended to be read without reference to Volume II.

The main headings of this volume correspond to main headings in Volume II (e.g. III-2.1 corresponds to II- 2.1). In some cases minor headings in this volume may be stand-alone (e.g. III-4.1.3.1 does not have a corresponding section in Volume II).

This volume contains some simplified rationale statements; refer to Volume IV for further details of rationale and for the performance base used to develop the standards.

Nothing in this volume should be taken to overrule the standards set out in Volume II.


III- 1.1 Departure from Volume III guidelines

When departing from the guidelines in this volume, write out a rationale for that departure. In the rationale, explain the following:

A blank table is available for copying; see the appendix, Section III- 8.4.


Table III- 4. System Selection Worksheet with instructions


ITEM

VALUE

CONSTRAINT, OPPORTUNITY, RESULT

SOLUTION AND RATIONALE

Soil texture

Soil texture

From site evaluation

Soil horizon chosen

Soil structure and consistence

Soil structure and consistence

Category from Table II- 4


Other soil notes

Coarse fragments or other factors relevant

Constraint from Table II- 7

% adjustment for HLR

Other notes

Kfs

Kfs, mm/day


Any notes on selection

Percolation rate

Percolation rate, min/inch


Any notes on selection

Soil depth

Soil depth for VS selection

Type of restrictive layer Soil depth for LLR selection

Any notes on depth in receiving area

Slope %

>15%, >25%, >45%?

Tables II-5 and II-6, and guidance from Table III- 7

Notes on restrictions to system type


Slope shape, location

Concave? Unfavorable location?


Adjust system contour length to bowstring length if concave contour

Elevation house sewer to dispersal area

Up, down, vertical distance

Gravity possible?

Non pump dose possible?


Temperature

Extreme cold?


May need to adjust design


Net positive evapotranspiration?

  • 0 mm/year?

  • 600 mm/year?

Opportunity for BC zero discharge lagoons and ETA beds, Opportunity for ET beds.

Check Table II- 6 for suitability of techniques


Source of data

Rainfall?

> 1800 mm/year, > 3000 mm/year?

Reduced HLR calculation, Section III- 4.1.3

Source of data


Soil constraints?

From Table II- 5



From Table II- 6



From Table II- 7



House bedrooms

Enter bedroom number

DDF from Table II- 8


House area

Enter total living area

Additional DDF from Table II- 8

Based on floor area

Occupants

Enter expected occupancy

DDF from Table II- 9

Only if occupancy method to be used

Daily Design Flow

Chosen DDF in L/day

Calculation summary

Method chosen, statements for owner sign off


ITEM

VALUE

CONSTRAINT, OPPORTUNITY, RESULT

SOLUTION AND RATIONALE

Soil depth and VS options, distribution and dosing options

VS option 1


Notes on dosing and constraints to design

VS option 2




Horizontal separation constraints?

Relevant separations from Table II-19 or 20


Notes on potential constraints to system




Relevant separations from Table III- 16


Rationale for any departure


HLR Type 1

Soil type: Table II- 22 Kfs or perc: Table II- 23


Chosen:

Adjust for coarse fragments, rainfall or for use with SDD

HLR for sand

Type of sand and effluent Table II- 24

Chosen:

For sand mound etc.


HLR Type 2

Soil type: Table II- 22 Kfs or perc: Table II- 23


Chosen:

Adjust for coarse fragments, rainfall or for use with SDD


Minimum system contour length

LLR from soil type: From Kfs or Perc:

Chosen:

Or minimum system contour length (Table II- 26)

System contour length

Length = DDF ÷ LLR


Dispersal area size and options

AIS for Type 1

AIS = DDF ÷ HLR


AIS for Type 1 to sand



AIS for Type 2

AIS = DDF ÷ HLR


AIS and min. basal area for other system types

AIS = DDF ÷ HLR

E.g. minimum basal AIS for a sand mound

Area available


Consider setbacks

Option 1



Option 2




Length constraint?

Minimum system contour length to meet standard

AIS = DDF ÷ LLR or minimum system contour length

Adjust for any concave contour

Length available on contour

From site evaluation

And potential solutions


Other considerations

Owner priorities



Other site constraints

Or opportunities


System summary



Rationale summary


Table III- 5. Example of filled System Selection Worksheet


ITEM

VALUE

CONSTRAINT, OPPORTUNITY, RESULT

SOLUTION AND RATIONALE

Soil texture

Sandy Loam


For 30 cm below infiltrative surface

Soil structure and consistence

Angular blocky, strong Friable

Favorable


Other soil notes

Coarse fragments 10%

No constraint (<35%)

No HLR adjustment needed to meet standard

Kfs

1200 mm/day


2nd lowest of 4 tests At 25 cm depth

Percolation rate

Not used




Soil depth

30 cm

Low permeability restrictive layer (depth consideration for LLR and VS the same)

Same depth for receiving area

Slope %

12 %

No restriction on type of system


Slope shape, location

Linear Linear, in Backslope location

No constraints

No adjustment needed

Elevation house sewer to dispersal area

Estimated 3 m up from house


Gravity to field not possible


Temperature

Not extreme cold


System freezing not severe constraint

Net positive evapotranspiration?

120 mm/year net positive

Table II-6 shows Kfs too high for lagoon or ETA bed, ET too low for ET bed.

Farmwest data (water deficit)

Rainfall?

1200 mm/year

No HLR reduction needed

Environment Canada


Soil constraints?

Not suitable for gravity

Except lagoons, ET and ETA

Soil depth, From Table II-5

Not suitable for:

BC zero discharge lagoon ETA bed (Kfs)

ET bed (net ET< 600 mm/year)

Climate (ET) From Table II- 6

Soil not constrained


From Table II-7

House bedrooms

3

1300 L/day

Table II-8

House area

270 m2

No additional flow for area

Table II-8

Occupants

Occupancy method not used


Occupancy declared to be normal

Daily Design Flow

Table II-8

1300 L/day

Standard DDF


ITEM

VALUE

CONSTRAINT, OPPORTUNITY, RESULT

SOLUTION AND RATIONALE


Soil depth and VS options, distribution and dosing options

Type 1 to sand mound, demand dosing

60 cm min. sand depth Total VS 90 cm, OK

Receiving area OK Demand dosing OK*

Type 1 to sand mound, timed dosing

45 cm min. sand depth Total VS 75 cm, OK

Receiving area OK Timed dosing OK*

Type 1 to sand mound, micro- dosing

30 cm min. sand depth Total VS 60 cm, OK

Advantage for micro- dosing (less sand needed)**

SDD with fill, micro-dosing, Type 1 or 2

30 cm sand depth Total VS 60 cm, OK



Horizontal separation constraints?

Downslope perimeter drain, discharge to rock pit

7.5 m minimum separation

Ensure rock pit does not affect field.

Property lines

3 m separation recommended in Table III- 16

No departure needed

HLR Type 1

Soil type: 27 L/day/m2

Kfs: 30 L/day/m2

Chosen: 27 L/day/m2

HLR adjusted, 27 x 0.5 =

13.5 L/day/m2 for SDD

HLR for sand

Type 1 to Mound Sand

Chosen: 40 L/day/m2

For sand mound

HLR Type 2

Soil type: 50 L/day/m2

Kfs: 60 L/day/m2

Chosen: 50 L/day/m2

HLR adjusted, 50 x 0.7 = 35 L/day/m2 for SDD

Minimum system contour length or LLR

LLR: soil type: 60 L/day/m Kfs.: 60 L/day/m


Chosen: 60 L/day/m

Table II-26 specifies use of LLR tables


Dispersal area size and options

AIS for Type 1

48 m2

96.3 m2 for SDD

1300 ÷ 27

1300 ÷ 13.5 for SDD

AIS for Type 1 to sand

32.5 m2

1300 ÷ 40, mound bed

AIS for Type 2

26 m2

37 m2 for SDD

1300 ÷ 50 for Type 2

1300 ÷ 35 for SDD

Sand mound minimum basal area

26 m2 (< bed area)

Based on Type 2 at basal area

Area available

>300 m2

Setbacks OK

Type 1 to sand mound

Initial calc. < 100 m2 needed

Including toe areas

SDD with fill

Initial calc. < 100 m2



Length constraint?

Minimum system contour length needed

21.7 m

1300 ÷ 60

Length available on contour

35 m to property lines

Setbacks OK

Other considerations

Owner priorities

No concern over sand mound

Prefers lower mound.

Other site constraints

No other constraints



ITEM

VALUE

CONSTRAINT, OPPORTUNITY, RESULT

SOLUTION AND RATIONALE


System summary

Type 1 to sand mound Pressure distribution and timed dosing

VS 30 cm in sand, 60 cm as constructed

Dose 28 x per day at DDF minimum (Table II-12).

Chosen after consideration of sand cost and owner priorities for landscaping

Notes on the example:


Table III- 6. System applications and limitations


TYPE OF SYSTEM

APPLICATIONS

LIMITATIONS AND UNSUITABLE CONDITIONS


Type 2 treatment


Small available dispersal area

  • Higher maintenance than Type 1

  • May need electrical power

  • Some systems need special measures for seasonal use


Type 3 treatment

  • Small available dispersal area, when used with high HLR

  • VS constraints when used with lower HLR

  • As part of design by a professional

  • Higher maintenance than Type 1

  • Higher monitoring costs than Type 2

  • May need electrical power

  • Some systems need special measures for seasonal use

  • Professional design required by SSR


Seepage Beds


Small available dispersal area

Unsuitable for:

  • Slopes > 15%

  • Low permeability soils

At grade and raised systems

  • Limited vertical separation

  • System contour length constraints (may need toe blanket)

Unsuitable for steep slopes (range depends on system type)


Gravity distribution

  • Simple

  • No electrical power needed for trickling gravity systems

  • Sites where dispersal area is at lower elevation than the septic tank

Unsuitable for:

  • Shallow soil depth

  • High or low permeability soils

  • Slopes > 15% (trickling)

  • AIS > 100 m2 (trickling)

  • Raised systems


Pressure distribution

  • Shallower soil depth than for gravity distribution

  • Wider range of soil types than for gravity distribution

  • Demand dosing may need power

  • Timed dosing needs power

  • Additional components needed


Pressure distribution with timed dosing

  • Shallower soil depth than for demand dosing for some soil types

  • Wider range of soil types than for demand dosing

  • Allows strict control of system flows


  • Timed dosing needs power

  • Larger pump tank needed than for demand dosing


Pressure distribution with micro-dosing

  • Shallower soil depth than for timed dosing for some soil types

  • Wider range of soil types than for timed dosing

  • Allows strict control of system flows


May be difficult to achieve dose frequency in freezing conditions


Subsurface Drip Dispersal

  • Shallow soil depth

  • Small available dispersal area

  • Very steep or complex slopes

  • Forested landscape

  • Low impact

  • Type 1 restricted to more permeable soils

  • Complex system design and additional components needed

  • Needs electrical power

  • Standards specify timed dosing


TYPE OF SYSTEM

APPLICATIONS

LIMITATIONS AND UNSUITABLE CONDITIONS


At-grade beds

  • Small available dispersal area

  • Limited vertical separation

  • Bed system on steeper slopes than Seepage Beds

  • Unsuitable for slopes > 25%

  • Bed may be long

  • Restriction if site has concave contour

  • Standards specify pressure distribution


Alberta At Grade systems


  • Limited vertical separation

  • Low impact

  • Low permeability soils

  • Limited to forested sites with LFH horizon

  • Unsuitable for slopes > 15%

  • Bed may be long

  • Type 2 or Type 3 effluent

  • Restriction if site has concave contour

  • Needs electrical power

  • Standards specify pressure distribution with timed dosing


Sand mounds

  • Limited vertical separation

  • Soils with structure not suitable for infiltration of effluent

  • Very high and very low permeability soils

  • High permeability soils without use of micro-dosing

  • Not suitable for slopes > 25%

  • Bed may be long

  • Restriction if site has concave contour

  • High site impact

  • Standards specify pressure distribution with timed dosing

Sand mantle sand mound

Sites which might otherwise suit a sand mound but have insufficient contour length to meet LLR standards.


As for sand mounds


Sand lined trenches/beds

  • Very high permeability soils

  • Favorable soil underlying less favorable soils

  • Shallow vertical separation (bottomless sand filters)

  • Beds not suitable for low permeability soils and slopes > 15%

  • Standards specify pressure distribution with timed dosing


ET or ETA beds

  • Simplicity

  • May operate without electrical power

  • Suitable for very low permeability soils

  • An alternative to lagoons

  • Suited to summer seasonal use

  • ET beds do not require soil


  • Limited to suitable climates

  • Complex system design


BC zero discharge lagoons

  • Simplicity

  • May operate without electrical power

  • Suitable for very low permeability soils

  • Limited to suitable climates

  • Limited to large lots

  • Not suitable for slopes > 12%

  • May be aesthetically displeasing


Site drainage

  • Lowers the water table, improving vertical separation

  • Deeper water table may increase the range of system options

  • May allow for a shorter system

  • Drains should meet the setback distances from the dispersal

  • It is difficult to predict, beforehand, how much the water table will drop as a result of the drain

For sites with system contour length constraint, see Section III- 5.6.3.2 for guidance and solutions.


III- 4.1.2.2 Guidance on soil constraints to site capability (Table II- 7)

As guidance, the following tables and examples expand on the soil capability standards Table II- 7 (page II- 17) and footnotes, and offer some suggested options. See Volume IV for rationale.

III- 4.1.2.2.(a) Very high permeability soils


Soil type or condition

  • Gravel and very gravelly sand

  • Or Kfs >17,000 mm/d

  • Or percolation rate faster than 0.5 min/inch

Constraining factor

Very high permeability

Potential solution

  • Uniform distribution with timed or micro-dosing.

  • Note that the vertical separation standards are different for demand dosing versus timed dosing versus micro-dosing options.

Alternative solutions (where appropriate)

  • Sand mound or sand-lined trench or bed, with timed or micro-dosing options,

  • or ET bed.

Notes

Reduce the soil HLR based on the proportion of coarse fragments (> 2 mm) in the soil.

III- 4.1.2.2.(b) Coarse fragments


Soil type or condition

More than 35% total gravel and other rock fragments (particles larger than 2 mm).

Constraining factor

Reduced soil area for dispersal and treatment. Reduced water holding capacity.

Potential solution

Reduce the soil HLR and increase the dosing frequency (which reduces HAR).

Notes


Example of HLR adjustment:


The soil HLR selected from the tables is 25 L/day/m2. The coarse fragment content in the soil is 55% (0.55 as proportion)

The calculated proportion for adjusting the soil HLR

= 1 – (proportion of coarse fragments – 0.35) Proportion for adjusting the HLR = 1 - (0.55 – 0.35) = 0.8

The adjusted HLR = 25 x 0.8 = 20 L/day/m2

The soil hydraulic loading rate is decreased; the infiltration area is increased.


Soil type or condition

More than 60% total gravel and other rock fragments larger than 2 mm

Constraining factor

  • Risk of effluent short circuiting due to large fractures and voids

  • Severely reduced soil area for dispersal and treatment.

  • Reduced soil water holding capacity.

Potential solution

Uniform distribution with Timed or micro-dosing.

Alternative solutions (where appropriate)

  • Sand mound, sand-lined trench, sand-lined bed with timed or micro dosing,

  • or ET bed.

Notes


Example of HLR adjustment:


The soil HLR selected from the tables is 25 L/day/m2. The soil coarse fragment content is 75% (0.75 as proportion)

The proportion for adjusting the HLR is 1 - (0.75 – 0.35) = 0.6 The adjusted HLR = 25 x 0.6 = 15 L/day/m2


Soil type or condition

90% or more total coarse fragments larger than 2 mm.

Constraining factor

  • Risk of effluent short circuiting due to large fractures and voids.

  • Very severely reduced soil area for dispersal and treatment.

  • Negligible soil water holding capacity.

Notes

  • Not suitable for soil based treatment and dispersal.

  • Defined as a limiting layer.


III- 4.1.2.2.(c) Very low permeability soils


Soil type or condition

Kfs is 75 to 150 mm/day or percolation rate 60 to 120 min/inch

Constraining factor

Low permeability, low infiltration rates.

Potential solution

Uniform distribution with micro dosing or sand mound with timed dosing.

Alternative solutions (where appropriate)

  • Sand-lined trenches penetrating below the unfavorable soil layer (if underlain by an unsaturated favourable soil).

  • Alberta at Grade system (requires Type 2 or 3 effluent).

  • ET or ETA bed.

  • BC zero discharge lagoon.


Soil type or condition

Sandy clay, silty clay or clay soils with structure and consistence category “Favorable”.

Constraining factor

Low permeability, low infiltration rates, susceptible to structural damage if compacted when wet.

Solution

Type 2 or 3 effluent, with uniform distribution with timed or micro dosing or sand mound with timed dosing.

Alternative solutions (where appropriate)

  • Sand-lined trenches penetrating below the unfavorable soil layer (if underlain by an unsaturated favourable soil).

  • Alberta at Grade system (requires Type 2 or 3 effluent).

  • ET or ETA bed.

  • BC zero discharge lagoon.


Soil type or condition

Sandy clay, silty clay or clay soils with structure and consistence category “Poor”.

Constraining factor

Very low permeability, very low infiltration rates, susceptible to swelling, susceptible to structural damage if compacted when wet.

Solution

Type 2 or 3 with minimum 30 cm sand media depth below infiltrative surface or Point of Application, with timed or micro dosing. Typically a sand mound with sand mantle and drainage improvements.

Alternative solution (where appropriate)

  • Sand-lined trenches penetrating below the unfavorable soil layer (if underlain by an unsaturated favourable soil).

  • Alberta at Grade system (requires Type 2 or 3 effluent)

  • ET or ETA bed.

  • BC zero discharge lagoon.

Other very low permeability soils are identified as restrictive layers, that is, flow restrictive horizons. In some cases these soils may be suitable for BC zero discharge lagoons or ETA beds, as indicated in Table II- 7 (page II-17).

III- 4.1.2.2.(d) Soils with significant amounts of expandable clay minerals

Some soils can shrink and swell significantly with changes in water content depending on the expansive characteristics of certain clay minerals.

Wet conditions cause clay minerals to expand, so permeability the soil below the dispersal system will decrease as the soil gets wet. In general this results in the clay rich horizon being identified as a limiting (restrictive) layer for dispersal system design. See Section III- 3.3.2.4. for further information.

For these soils it is particularly important to ensure that permeability or percolation testing is carried on long enough for the soil to fully wet.

Shrinking and swelling can also impact structures, including tanks and other sewerage system structures.

If these soils are a problem in your area, and you think that they are present on a site you are planning for then consult a professional with expertise in soil science.

As an initial check for risk, follow the simplified test procedure in Section III- 3.3.2.4.


III- 4.1.2.2.(e) Prismatic soils

See Section III- 3.3.2.3.(c) for further information on prismatic structure. Prismatic structured soils which have permeability high enough to be considered usable for effluent dispersal may have a high risk of bypass (preferential) flow, that is, where effluent travels rapidly down through the soil without adequate treatment.

To reduce this risk, avoid using soils with prismatic structure for the infiltrative surface. Use a 30 cm or thicker layer of sand media fill above the native soil (for example, a sand mound system) or ensure the infiltrative surface is in a soil layer at minimum 45 cm above the prismatic soil. To further reduce the risk of bypass flows, consider the use of micro-dosing.

III- 4.1.2.2.(f) Platy soils

A soil with weak platy structure is prone to damage during construction, or by applied effluent. A soil with moderate or strong platy structure will have low vertical hydraulic conductivity, making it unsuitable for conventional dispersal systems.

This Manual offers the following strategies which should be used together for soils which have platy structure of weak grade:

III- 5.1.3.3.(a) Sodium and salinity

Over time, effluent with a high concentration of sodium can cause clay soils to swell or disperse and lose structure and permeability. This will reduce the infiltration capacity of the dispersal system and may lead to premature failure of the sewerage system.

The rate of Type 1 effluent infiltration will usually be limited by the permeability of the Biomat, rather than the soil. However, with limited biomat, expanding clays may limit the long term application of Type 2 or 3 effluents.

See the appendix, Section III- 8.4 for further information.

To reduce the risk of sodium damage to soils, control of the sewage source is important. Low sodium detergents are preferred and water softener flush water should not be discharged to the system. See Section III- 5.1.3.3 (source control).


III- 5.1.4 DAILY DESIGN FLOWS FOR NON-RESIDENTIAL BUILDINGS

Frequently, sewerage system filings for small non-residential facilities or non-residential accessory uses are made under the SSR. For these facilities flows may vary widely from literature and table values, and sewage strength may also vary widely.


Estimating non-residential or multi-use flows is more complicated than estimating flows for a single home. Table III- 11 provides typical average flows for non-residential uses, and can be used as a starting point when selecting a DDF for a non-residential building. Use the average flow and BOD values from the table with a peaking factor appropriate to the use and application.


Table III- 11. Non-residential Average Daily Flow Rate guide


DESCRIPTION

UNIT (PER)

AVERAGE

FLOW (L/DAY PER UNIT)

AVERAGE DAY BOD

(GRAMS/DAY PER UNIT) AND NOTES

Industrial, commercial (domestic and food service waste only)



Risk of wax strippers and cleaning chemicals, risk of cold water and high ammonia

Office/factory without cafeteria

person

50 to 75

30

Office/factory without cafeteria and with showers

person

75 to 125

35

Office/factory with cafeteria

person

100

38

Open site (e.g. quarry) without canteen

person

60

25

Full time day staff (staff figures apply to all applications)

person

50 to 75

38

4 hour shift day staff (staff figures apply to all

applications)

person

45

25

Dental or medical office

practitioner

1000

(risk of antibiotics and drugs)

Beauty salon (without staff)

Seat

1000

(risk of chemicals and hair)

Store, washroom flow only

square metre

5


Shopping center, per toilet room

toilet room

1700

380

Shopping center, per parking space

parking space

10


Accommodation



Risk of wax strippers and cleaning chemicals

Hotel or motel, bed and breakfast, per guest, except for luxury hotels

person

200

90

bedroom unit

250 to 400

180

Housekeeping unit, no meals

bedroom unit

450

130

Guest bedrooms only, no meals

person

80

50

Non-residential conference guest or day camp, including meals

person

60

25

Resident staff

person

170

60

Cabin resort

person

225

90 (risk of high strength wastes from food service)

Residential or work camps, flush toilets, no meals

person

140

90

Residential or work camps, flush toilets and meals

person

225

90 (risk of high strength wastes from food service)

Residential camps, no flush toilets

person

60


Dormitory bunkhouse

person

140

90

Nursing Home or retirement home

person

475

110 (risk of antibiotics and drugs)

Laundromat (e.g. in apartment building)

machine

1200 to 2400

260 to 530


DESCRIPTION

UNIT (PER)

AVERAGE FLOW (L/DAY PER UNIT)

AVERAGE DAY BOD (GRAMS/DAY PER UNIT) AND NOTES

Food service and bars



Risk of wax strippers and cleaning chemicals, risk of cold water and high ammonia, risk of oils and

greases

Restaurant

meal

12

15

Restaurant (fast food, paper service)

meal

12

12

seat

60


Restaurant (full service)

meal

30

38

seat

90

120

Open more than 16 hours a day

seat

190

250

Restaurant (pre prepared catering)

meal

25

30

Institutional meals

meal

20

20

Function rooms, buffets

meal

30

20

Snack bar or bar meals

person

15

20

Bar/lounge/pub

person

12

15

seat

140

180

Coffee shop

patron

20

20

seat

400


Amenity sites



Risk of wax strippers and cleaning chemicals, RV holding tank chemicals, risk of

cold water and high ammonia

Toilet and shower blocks




Shower

use

40

6

Toilet urinal

use

5

1.5

Toilet (WC)

use

10

12

Visitor center or Day use site, with flush toilets

person

20

15

Tent or trailer sites (central comfort station, no sani-dump facility)

person

75 to 150

45 at low end of range

site

180 to 360

108 at low end of range

Camp Trailer site fully serviced (with hook up)

person

70

75 (risk from RV holding tank wastes and high strength)

site

170

170 (risk from RV holding tank wastes and high strength)

Assembly hall

person

15

12


DESCRIPTION

UNIT (PER)

AVERAGE FLOW (L/DAY PER UNIT)

AVERAGE DAY BOD (GRAMS/DAY PER UNIT) AND NOTES

Schools and day care



Risk of wax strippers and cleaning chemicals, risk of cold water and high ammonia

School, non-residential no cafeteria, no showers

student

15 to 30

20

School, non-residential no cafeteria, with showers

student

50

25

school non-residential with cafeteria, with showers

student

90

38

Boarding school per student

student

200 to 300

75 to 100

Day care center, per child

child

75

30

Notes:


III- 5.1.4.2 Peaking factors for use with non-residential average flow values

The values provided by Table III- 11 relate to peak day flows in differing ways. For example, the flow per use for a water closet is an actual flow, whereas the flow per person for a bunkhouse is an average flow that will need to be multiplied by a peaking factor to result in a Daily Design Flow.

A typical range of peaking factors for treatment and dispersal system design for non-residential facilities is

1.5 to 5. The AP should select and use a peaking factor appropriate to the facility and projected use

The treatment and dispersal system sizing and specification standards of this Manual are based on flow peaking for normal residential sewage and effluent. In order to use the sizing and specification standards of this Manual the AP should ensure that the selected peaking factor and any flow equalization specified results in a DDF with peaking equivalent to that for residential sewage and effluent.

For example, if expected flow peaking is higher than normal for residential sewage, added flow equalization can be used to reduce flow peaking to the treatment and dispersal systems.


III- 5.1.4.3 Mass loading and non-residential flows

The system selection standards (site capability, treatment system selection) and system sizing (septic tank sizing, hydraulic loading rate and linear loading rate, etc.) standards of this Manual are based on typical residential sewage and effluent (see Section III- 5.1.3.1 for sewage strength and peak flows).

When estimating a DDF for non-residential uses, it is standard practice to consider BOD mass loading, and to check that mass loading does not exceed that for typical residential effluent when applied to the treatment system and the dispersal area. This consideration goes hand in hand with selection of a peaking factor to estimate DDF from the values in Table III- 11.

Table III- 12 indicates particular categories of non-residential uses where sewage strength varies widely from normal residential sewage strength.

Because of this greater strength it is not appropriate to size and specify a dispersal system based on the standards of this manual for these uses.

Table III- 12. Facility categories


TYPE OF FACILITY

SEWAGE STRENGTH SIGNIFICANTLY HIGHER THAN RESIDENTIAL?

Industrial, commercial

At minimum for medical and Personal Care facilities

Accommodation

At minimum for commercial food service flows

Food Service and bars

Yes

Amenities

At minimum for food service flows and for RV holding tank sani-dumps.

Schools

At minimum for food service flows


III- 5.2 Distribution and dosing guidelines

III- 5.2.1 TYPES OF DISTRIBUTION AND DOSING

This Manual provides different vertical separation and soil capability standards depending on the type of distribution and on the type and frequency of dosing.

This is because:


III- 5.2.2.2.(a) Example of selecting micro-dosing frequency based on the simplified table:

Consider a site with 60 cm total VS, made up of 50 cm depth of silty clay loam (structure and consistence category “Favorable”) plus a 10 cm sand blinding layer. Type 1 effluent, HLR 15 L/day/m2 and DDF of 1500 L/day:


Do not consider the blinding layer.

The silty clay loam soil is 50 cm deep, but for micro-dosing consider only 15 cm of this depth.

Minimum dose frequency from Table II- 12 (page II-24) = 12 doses per day at DDF Dose volume = DDF ÷ maximum doses per day = 1500 ÷ 12 = 125 L per dose

III- 5.2.2.2.(b) Micro-dosing frequency calculation based on soil water holding capacity.

For micro-dosing, the frequency of doses is calculated so that each individual dose amounts to less than 10% of the water holding capacity (WHC) of the soil below the infiltrative surface.

For this calculation, the depth of soil to be considered depends on the soil type. See Volume IV Section IV-

5.7.1.1 for further information on water holding capacity and hydraulic application rate.

If the soil’s water holding capacity is expected to vary over the depth under consideration, give priority to the layer closest to the infiltrative surface. For example; in the case of a sand fill system, use the water holding capacity of the sand media and the depth of the sand media. However, blinding layers should not be considered. For soils with strong structure or macropore conditions lower HAR is preferred. In all cases it is preferable to use as large a number of doses per day as is practical.

As a guideline, Table III- 13 (below) provides typical water holding capacity values for soils. The AP should adjust these values where soil conditions do not meet the stated norms.

If non-standard (for example, lower) HLR is used, then the AP can use this table to calculate the minimum number of doses per day, which, may be less than the number in the simplified standards table.

As noted above, calculated minimum dose frequency may also be lower than the simplified table for some soil types (since soil types are grouped in the simplified table).


Table III- 13. Typical soil water holding capacity (WHC)



SOIL TEXTURE

WHC

10% OF WHC, IN MM DEPTH OF APPLICATION (L/M2 /DOSE)

AS VOLUME

PROPORTION

FOR 15 CM

SOIL DEPTH

FOR 30 CM

SOIL DEPTH

FOR 45 CM

SOIL DEPTH

FOR 60 CM

SOIL DEPTH

Very Gravelly sand

0.025

0.37

0.75

1.13

1.5

Gravelly Sand

0.042

0.63

1.26

1.9

2.52

Mound sand

0.046

0.7

1.4

2.1

2.75

Sand or Clean Coarse Sand

0.05

0.75

1.5

2.25

3.0

Loamy Sand

0.07

1.0

2.0

3.2

4.1

Sandy Loam

0.10

1.5

3.1



Loam

0.14

2.2

4.3



Silty Loam

0.20

3.0




Silt

0.24

3.6




Sandy Clay Loam

0.11

1.7




Clay Loam

0.15

2.2




Silty Clay Loam

0.18

2.7




Silty Clay

0.14

2.1




Clay

0.12

1.7




Note: These values are based on favorable soil structure and consistence and average soil characteristics, including organic matter content (2 to 4% for soils and 0.5% for sand media). They do not include consideration of coarse fragments (except in the case of Very Gravelly or Gravelly Sand.

  1. 5.2.2.2.(c) Examples of micro-dose calculation using 10% of water holding capacity

    1. Example 1:

      For this example consider a Sand mound with 75 cm total VS, made up of 30 cm depth of Mound Sand on top of 45 cm depth of Sandy Clay Loam (favorable structure and consistence, Perc rate 45 min/inch). Type 1 effluent, HLR to the sand surface 40 L/day/m2:


      Water holding capacity varies over the VS but the sand is closest to the infiltrative surface, so the sand water holding capacity and depth is used.

      10 % of water holding capacity for 30 cm depth of Mound Sand from Table III- 13 = 1.4 L/ m2, this is the maximum volume per square metre per dose (maximum HAR).

      Minimum dose frequency = HLR ÷ maximum HAR = 40 ÷ 1.4 = 28.5 doses per day at DDF.

      This is the same as the frequency in the simplified dosing table in the standards (Which shows 28 x day).


    2. Example 2:

For this example consider a site with 60 cm total VS, made up of 60 cm depth of Silty Clay Loam (structure and consistence category “Favorable”, Perc rate 35 min/inch). Type 2 effluent, HLR 25 L/day/m2:


The Silty Clay Loam soil is 60 cm deep, but for HAR consider only 15 cm of this depth.

10 % of water holding capacity for 15 cm depth of silty clay loam from Table III- 13 = 2.7 L/ m2, this is the maximum volume per square metre per dose (maximum HAR).

Minimum dose frequency = HLR ÷ maximum HAR = 25 ÷ 2.7

= 9.2 doses per day at DDF.

Although this calculated dose frequency is less than that in the simplified dosing table (Which shows 20 x per day) it can safely be used for micro-dosing.

In this case, the Silty Clay Loam soil has a higher water holding capacity than some of the other soils it is grouped with in the simplified table; this means that the calculated micro-dosing frequency will be lower than the minimum frequency in the simplified table.

  1. 5.2.2.2.(d) Micro-dosing to soils with high coarse fragment content and denser soils

    Soils with a higher coarse fragment content will have a lower capacity to hold water. In general, soils with higher density will also have a lower capacity to hold water. Therefore, when dosing effluent to these soils, use a lower hydraulic application rate.

    1. Micro-dosing frequency from the simplified table:

      The Volume II standards provide lower HLRs for denser soils. The standards also reduce the HLR for soils with a high content of coarse fragments. This means that the simplified micro-dosing frequency from Table II- 12 (page II-24) has already been adjusted for these soils.

      For very gravelly sand, start with the dosing frequency for gravelly sands (from the simplified table) and multiply by a factor of 1.7.

    2. Calculated micro-dosing frequency for soils with high coarse fragment content:

      When calculating a hydraulic application rate (HAR), following Table III- 13, adjust the water holding capacity of the soil, for gravel content above 35%.

      To do this, reduce the water holding capacity by multiplying the table WHC value by a factor of (1 – coarse fragment content).

      For example, for a site with a 60 cm depth of Very Gravelly Loamy Sand, with a total coarse fragment content of 50%, and a selected HLR of 25.5 L/day/m2 , calculate the dosing frequency as follows (note that this HLR has been adjusted based on gravel content following Section III- 4.1.2.2):


      10% of WHC from Table III- 13 is 4.1 L/m2

      This is the recommend maximum volume per square metre per dose, and needs to be adjusted for coarse fragment content;

      Design maximum volume per square metre per dose =

      4.1 x (1-0.5) = 4.1 x 0.5 = 2.05 L/m2 per dose Minimum dose frequency = HLR ÷ maximum HAR = 25.5 ÷ 2.05

      = 12.5 doses per day at DDF

    3. Calculated micro-dosing frequency for soils with “poor” structure and consistence category:

For soils with a structure and consistence category of “Poor” (from the standards Table II- 4 (page II-13)), if calculating a hydraulic application rate (HAR) following Table III- 13, then adjust the water holding capacity of the soil by multiplying the table WHC value by a factor of 0.83. This is based on these soils typically having a higher bulk density.

For example, for a site with 60 cm depth of Loamy Sand soil with consistence of firm (structure and consistence category “Poor”) and HLR of 27 L/day/m2:


10% of WHC from Table III- 13 is 4.1 L/m2

This is the recommend maximum volume per square metre per dose, and needs to be adjusted for the denser soil;

Design maximum volume per square metre per dose = 4.1 x 0.83 = 3.4 L/m2 per dose Minimum dose frequency = HLR ÷ maximum HAR = 27 ÷ 3.4

= 8 doses per day at DDF


III- 5.2.2.3 Timed and micro-dosing with subsurface drip dispersal systems

Since subsurface drip dispersal systems (SDD) use a lower hydraulic loading rate it is acceptable to reduce the dose frequency from the values in the Volume II standard dose frequency tables.

The standards specify that HLR for SDD is reduced from the standard values by multiplying those values by a factor of 0.5 for Type 1 effluent and 0.7 for Type 2 effluent. See Section III- 5.5.2.2for details.

For timed dosing, where the HLR is selected and reduced using the factors for SDD in the standards, Table III- 14 provides minimum dose frequencies for timed dosed SDD systems. Note that SDD systems do not use the reduced dose frequency standards for cold climate conditions.

SDD systems typically use micro-dosing. Micro-dosing frequency can be calculated following Section III-

5.2.2.2. For common situations, where the HLR is selected and reduced using the factors for SDD in the standards, Table III- 14 and Table III- 15 (below) provide recommended minimum dose frequencies. If lower HLR are used, calculate micro-dosing frequencies.


Table III- 14. Minimum dosing frequency for timed dosing, with SPM HLR for SDD



SOIL TYPE OR NOTES

DOSING FREQUENCY AT DDF

Type 1 SDD HLR

Type 2 SDD HLR

Gravelly Sands, Coarse Sand, Loamy Coarse Sand, Sand, Loamy Sand, Fine Sands, Loamy Fine Sands, Clean Coarse Sand, Mound Sand.

8 x per day

16 x per day

Clean Coarse Sand, Mound Sand in sand mound or sand lined trench/bed.

8 x per day

Micro-dosing

Other soils

5 x per day

10 x per day


Table III- 15. Micro-dosing frequency, with SPM HLR for SDD


EFFLUENT TYPE

DOSES PER DAY, TYPE 1 SDD HLR

DOSES PER DAY, TYPE 2 SDD HLR

SOIL TYPE / SOIL DEPTH

30 CM

45 CM

60 CM

30 CM

45 CM

60 CM

Gravelly Sands

18

12

9

36

24

18

Mound sand

14

10

8

34

22

16

Sands, Loamy Sands, Clean Coarse Sand

10

8

6

24

16

12

Loamy Fine Sand, Sandy Loam, Fine Sandy Loam

8

8

6

20

12

10

Very Fine Sandy Loam, Loam, Silt Loam, Silt

6

6

6

12

12

12

Clay Loams, Clays

6

6

6

12

12

12

Note: Follow soil depth instructions in the standards.


III- 5.3 Vertical separation

III- 5.3.1 MINIMUM REQUIRED VERTICAL SEPARATION

In general, the purpose of vertical separation is to provide unsaturated aerated soil to treat the effluent. The primary objective is to remove pathogens.

Soil treatment performance is affected by many factors, including characteristics of the effluent, hydraulic loading rate, hydraulic application rate, type of distribution and dosing, type of soil, and the specification and operation of the sewerage system.

This is why there are different tables for different types of distribution, and different rows for type of dosing and type of effluent hydraulic loading rate (HLR) used. For most sites there will be several different vertical separation options available.

Figure III- 1 shows vertical separation (VS) for a conventional system. The vertical separation (VS) is measured in the same way for fill systems and sand mounds.

See Section III- 6.16 for illustration of vertical separation for a Combined Treatment and Dispersal System.


Figure III- 1. Vertical Separation between the Infiltrative Surface and the Restrictive Layer


III- 5.3.2 VERTICAL SEPARATION FOR DISPERSAL SYSTEMS


III- 5.3.2.1 Selecting vertical separation

To select the vertical separation (VS), the AP should use the standard VS tables, starting with the simplest in ground system and noting the available options. See Section III- 4.1.1.1 for information on conceptual design and system selection.

The System Selection Worksheet can be used to record VS options (see Section III- 4.1.1.2).

If soil depth is limited, the infiltrative surface can be placed higher in the soil (“shallow placement”), at the surface (“at grade”) or elevated above the surface on a layer of sand media fill (“above grade” or “raised”).

Gravity systems can be used below grade, shallow or even at grade. Uniform distribution systems can be used below grade, shallow, at grade or above grade. At-grade beds and Alberta At Grade systems are specialized forms of at grade systems.

If the sand layer used to raise the system above grade is 30 cm or thicker, then the “above grade” or “raised” system becomes a sand mound.

Sand mounds are a type of above grade system. Sand mounds, sand lined trenches and beds have a separate VS table because they are a specific technique.

III- 5.3.2.1.(a) Soil and as constructed vertical separation

Where Volume II tables show a minimum soil VS and a minimum as constructed VS, then meet both standards:


Soil VS + Sand media fill VS = as constructed VS.

For example, Native soil depth is 60 cm and soil texture is Loamy Sand, Using Type 2 effluent, with pressure distribution and standard frequency demand dosing:


Table II- 15 (page II-27) minimum native soil VS is 60 cm, minimum as constructed VS is 85 cm. A raised system can be used with 25 cm sand fill to meet the standard for as-constructed VS 60 cm of Soil + 25 cm sand = 85 cm as constructed VS.

When looking at the VS tables, look at the type of distribution and dosing that is needed for each option. It is important to also consider the site capability standards (Section II- 4.1.2).

Remember that site drainage may be an option if the shallow soil depth is caused by seasonal high water table. See Section III- 6.19 for information on site drainage.


III- 5.3.2.2 Example of selecting vertical separation options for a site

Consider a site with the following conditions: Land slope is 12%. The soil is a Loamy Sand, with a favorable structure and consistence, Kfs of 3000 mm/day and a 90 cm soil depth to the restrictive layer (low permeability). The climate is not extremely cold. Area for dispersal system is not constrained.

Check site capability, then check distribution and dosing options, simplest first.


Gravity site capability Table II- 5 (page II-14) specifies gravity distribution not allowed as soil depth (maximum available VS) is less than 150 cm

System constraints Table II- 6 (page II-16) allows for any type of dispersal system other than lagoons and ETA beds

Soil constraint Table II- 7 (page II-17) does not require any specific distribution or dosing method.

Working down through the VS tables (page II-26 onward), simplest first: Table II- 14 (gravity distribution), no option due to soil depth

VS options, using Type 1 HLR as area is not constrained

Table II- 15 (uniform distribution with demand dosing to systems with < 30 cm sand media fill):

  1. Type 1, demand dose, minimum 60 cm native soil, 60 cm total. Option is usable.

  2. Type 1, low frequency demand dose, minimum 75 cm native soil, 75 cm total. Option is usable with shallow placement system.

Table II- 16 (uniform distribution with timed or micro-dosing to systems with < 30 cm sand media fill):

  1. Type 1, timed dose, with 45 cm minimum native soil, minimum 60 cm total. Option is usable.

  2. Type 1, low frequency timed dosing, with 60 cm minimum native soil, minimum 75 cm total Option is usable with shallow placement system.

  3. Type 1, timed dose, with 45 cm minimum native soil, minimum 55 cm total. Option is usable but is not necessary as does not provide VS advantage for this site.



Choice of option is open, as all types of dosing are usable on this site. As freezing is not an issue, normal dose frequency may be preferred to allow normal system placement. Timed dosing may be selected for reasons other than VS—for example, to prevent over use of the system, but is not required.

Table II- 17 (sand mounds, sand lined trenches/beds), options are available but not needed as simpler option using native soil is available.

Table II- 18 (subsurface drip dispersal (SDD) systems with micro-dosing), options are available: Type 1 or 2 SDD with micro dosing, minimum 45 cm native soil, fill option not needed.


For this site, the simplest and lowest cost option, considering only VS, is likely to be Type 1 pressure distribution with normal demand dosing.

Note that options may be chosen for reasons other than VS—for example, timed dosing may be chosen for other advantages, or subsurface drip dispersal may be chosen to allow retention of trees or landscaping.

  1. 5.3.2.2.(a) Example of selecting vertical separation options for a site, shallow soil

    Consider a site with the following conditions: Land slope is 12%. The soil is a Sandy Clay Loam, with a favorable structure and consistence, and a 30 cm soil depth to the restrictive layer (low permeability). The climate is not extremely cold.


    Gravity site capability Table II- 5 (page II-14) specifies gravity distribution not allowed for soil type

    System constraints Table II- 6 (page II-16) shows sand mounds are allowed

    Soil constraint Table II- 7 (page II-17) specifies uniform distribution and timed or micro dosing.

    Working down through the VS tables (page II-26 onward) , simplest first: Table II- 14 (gravity distribution), no option due to soil type

    Table II- 15 and Table II- 16 (uniform distribution to systems with < 30 cm sand media fill), no options due to soil depth.

    Table II- 17 (sand mounds, sand lined trenches/beds), three options are available since minimum soil depth is met (25 cm minimum):


    1. Type 1, demand dose, with 60 cm minimum sand depth, minimum 85 cm total 60 cm sand plus the 30 cm soil = 90 cm total, meets the 85 cm total standard

    2. Type 1, timed dose, with 45 cm minimum sand depth, minimum 75 cm total 45 cm sand plus the 30 cm soil = 75 cm total, meets the 75 cm total standard

    3. Type 1, low frequency timed dosing, with 60 cm minimum sand depth, minimum 85 cm total 60 cm sand plus the 30 cm soil = 90 cm total, meets the 85 cm total standard

    4. Type 1 with micro-dosing 30 cm minimum sand depth, minimum 60 cm total 30 cm sand plus the 30 cm soil = 60 cm total, meets the 60 cm total standard

    5. Type 2 with micro-dosing 45 cm minimum sand depth, minimum 75 cm total 45 cm sand plus the 30 cm soil = 75 cm total, meets the 75 cm total standard


Table II- 18 (subsurface drip dispersal (SDD) systems with micro-dosing), options are available if sand media fill is added, since the 30 cm minimum native soil depth is met:

Type 1 or 2 SDD with micro dosing, minimum 60 cm total 30 cm sand plus the 30 cm soil = 60 cm, meets the standard


The choice of dispersal system will now depend on other factors, such as the available land area. Again, start with the simplest option first. For this example, if area is not a constraint, a Type 1 sand mound with demand or timed dosing could be a suitable option for this example.

The choice in this case would include consideration of how high a sand mound is acceptable to the owner, and consideration of the cost of added sand for the demand dose option given the relatively steep slope. Timed dosing or micro-dosing options may be less costly if sand is expensive, despite the need for larger pump tanks and a more sophisticated pump control panel. These options would also give other advantages, such as more reliable control over flows to the dispersal system.

Check back to Table II- 6 (page II-16) (key system constraints): The table indicates that a sand mound is OK for the site.

Document the selected VS option(s) and the rationale in the System Selection Worksheet (see Section III- 4.1.1.2) or by recording in another format.

  1. 5.3.2.2.(b) Blinding layer and vertical separation standards

    See Section III- 6.5.2.1.(e)for description of a sand blinding layer and information on where a blinding layer should be used.

    When selecting a vertical separation for a system with a blinding layer, consider the following:

III- 5.5.3.2 Sand media and HLR

Volume II provides a range of sand media specifications, recognizing that some sands may be difficult or expensive to locate in some regions of BC.

HLR to sand media takes into consideration the amount of fines in the sand. This is because fines are a key factor in establishing the permeability of the sand, and its suitability for effluent infiltration.

The ASTM C33 specification allows for up to 10% passing the 150 µm sieve and does not specify particles passing the 75 µm sieve. C33 may also have an effective diameter smaller than the size preferred for sand mounds. For these reasons, Table II- 25 (page II-37) modifies the C33 specification for the use in sand mounds, in order to ensure the sand does not have excessive fines. To differentiate this specification, the table identifies the sand as either “Clean Coarse Sand” or as “Mound Sand”, these sands can be considered as “modified C33 sand.

It is preferable to sieve test sand following a wet sieving test protocol (example ASTM C117) to ensure fines (less than 75µm) in the aggregate are characterized. If sand is merely dry sieved there is a risk of underestimating the amount of fines, as the fines may be stuck to sand particles.


III- 5.5.4 HYDRAULIC LOADING RATE AND THE INFLUENCE OF SODIUM AND SALINITY

Over time, sodium can accumulate in the soil and reduce the permeability of clay-rich soils. See the appendix, Section III- 8.4 for further information.


III- 5.6 Minimum system contour length and Linear Loading Rate (LLR)

Dispersal systems are installed along the contour (“on contour”) so that the system follows a contour line on the ground. The length of the system on the contour is important to maintain vertical separation.


III- 5.6.1 SYSTEM CONTOUR LENGTH


III- 5.6.1.1 Horizontal flow and groundwater mounding

When effluent is dispersed into the ground by a dispersal system, the effluent should drain away from the site; otherwise the soil will become saturated below the dispersal area. If the dispersal cell (trench or bed) is underlain by deep, permeable soils, then much of the water will flow vertically down through the upper soils, and the water table rise will be very small.


If the dispersal cell is located above a very low permeability layer, the water has to move horizontally (sideways) to get out from underneath the dispersal area.


To move horizontally, the water needs some head pressure to overcome the resistance to movement in the soil. On a flat site, this head can only come from the build-up of a “mound” of water under the dispersal area.



The finer the soil (with smaller pores) the more head is needed to drive the water through the soil, and so the higher the mound will become.


This is much the same with a water table below the dispersal area, the applied water will mound up to overcome the resistance of the saturated soil below the water table to sideways movement of the water.

This is similar to the mound that builds up if you pour thick syrup onto a plate.



On a sloping site, the head pressure comes from a combination of the slope and the mound, and so the mound will be smaller as the slope gets steeper.



This groundwater mound continues to grow with time, and can reduce the vertical separation to such an extent that it no longer meets the standards.


III- 5.6.1.2 Breakout risk

On a sloping site the water will move down gradient, usually that means downhill (as long as the restrictive layer follows the shape of the ground).

The receiving area is the area of soils downslope of the system and located within the required horizontal separation to a breakout (7.5 m). The soil depth in this area is important, because the water flowing downhill needs a certain depth of soil—just as a larger pipe can carry a larger flow, a thicker soil layer can carry a larger flow.

If the soils in the receiving area are too shallow, the water flowing downhill may reach the surface and break out.


Capillary rise can be an issue too—even if the water is near the surface contaminated water may wick up to the surface.

So when considering flow away from the dispersal area it is important to think of the receiving area soils as well as those below the dispersal cells.


III- 5.6.1.3 Linear Loading Rate (LLR)

By applying less water per metre along the contour, less water builds up under the system.

The example below in Figure III- 3 and Figure III- 4 shows a plan and section of a system that is the same size, but in one case is stacked on the slope, and in the other is spread out along the contour. In each case the DDF is 1500 L/day.

The site has a flow restrictive horizon at relatively shallow depth below the trench base (infiltrative surface).


Figure III- 3. Example of “stacking” a system, plan


Figure III- 4. Example of “stacking” a system on a site with flow restrictive layer, section



The longer, narrower, system (in this case one long trench instead of three short ones) maintains deeper vertical separation because less water is applied per metre along the contour.


The amount of water applied per metre along the contour is the Linear Loading Rate.


LLR = DDF ÷ SYSTEM CONTOUR LENGTH

Linear Loading Rate table values are used to size systems so that they are long enough to maintain VS. LLR values are:


III- 6.6 Trench systems

III- 6.6.1 DESCRIPTION

Trenches (also known as infiltration trenches) can be installed as shown in Figure III- 11, below the ground surface. Trenches can also be installed at shallow depth — in which case trenches are partially below ground and partially covered, or at grade—in which case fill is placed between and over the trenches or the trenches are excavated into fill after it is placed.

The standards specify a minimum aggregate depth of 15 cm below the distribution lateral, greater depth is recommended if more surge storage is needed or if root intrusion is a concern.

Figure III- 11. Trench Dispersal schematic cross section

III- 6.6.2 SIZING AND LAYOUT

Example of trench sizing:


Daily Design Flow of 1300 L/day, HLR of 15 L/day/m2 and 0.6 m wide trenches Minimum AIS needed = DDF ÷ HLR = 1300 ÷ 15 = 86.7 m2

This is the trench bottom area needed

Total length of trenches = 86.7 m2 ÷ 0.6 m = 144.4 m

The standards indicate minimum spacing between trenches. This spacing is not necessary between the ends of trenches (for example, for a center fed trench system).


III- 6.6.3 SPECIFICATION AND INSTALLATION

To improve infiltration of effluent into the soil, scarify the infiltrative surface to a depth of 5 to 15 cm, depending on the type of soil and soil depth. Scarify the sides of the trench if the soil is smeared or compacted. Scarify with a picking action using the teeth of an excavator bucket, or using hand tools.

Normally, lateral piping is centered in the trench.


III- 6.7 Seepage Bed systems

III- 6.7.1 DESCRIPTION

A Seepage Bed system is simply a wider infiltration trench, typically with more than one distribution lateral.


III- 6.7.2 SIZING AND LAYOUT

Seepage Bed systems are sized in the same way as trench systems.

Volume II standards limit the width of a bed to 3m and also limit the use of Type 1 Seepage Beds to more permeable soil types (see Table II- 6, page II-16). These restrictions provide for oxygen transport to the area under the bed and to the center of the bed.

For the same reason, Type 1 below grade beds are limited to more permeable soil types.

The standards indicate minimum spacing between beds. This spacing is not necessary between the ends of beds (for example, if the bed steps up or down).

If more than one bed is installed, the overall system contour length is determined in the same way as for trench systems.


III- 6.7.3 SPECIFICATION AND INSTALLATION

In a Seepage Bed, the distribution laterals should be evenly spaced across the width of the bed. On seepage beds with pressure distribution, it is better to stagger the orifices on adjacent laterals. The number of pressure distribution laterals is determined based on the minimum infiltrative surface per orifice.

For gravity distribution pipe laterals are typically spaced at no more than 90 cm on center.

For Seepage Beds, native soil can be used for cover soil as long as it is Loamy Sand, Loamy Fine Sand, Sandy Loam or more permeable. This will be the case for all Type 1 Seepage Beds due to the soil type limitations for these systems.

For Type 2 Seepage Beds on lower permeability soils, it is preferable to use imported Loamy Sand, Loamy Fine Sand or Sandy Loam. Ensure the cover is crowned or graded to divert surface water.


III- 6.8 Shallow, at grade and raised systems

III- 6.8.1 DESCRIPTION

Trenches or Seepage Beds can be installed at or above grade. Above grade systems are installed on sand media fill.

The standards specify use of uniform distribution if the infiltrative surface is above grade. If the sand media fill is more than 30 cm, then the system becomes a sand mound or bottomless sand filter, and should conform to standards for those systems; see Section III- 6.15.

The standards also provide two specific technologies for at grade systems which are placed directly on native soil and which follow the slope of the land: The At-grade bed and the Alberta At Grade system. These should conform to the standards for those systems, see Sections III- 6.13 and III- 6.14.


III- 6.8.2 SIZING AND LAYOUT

These systems should be sized using the same approach as used for a conventional below grade system. Follow Volume II standards and use the HLR for the native soil or the sand media, whichever is lower.

Example 1:


Using Type 1 effluent, the native soil HLR is 35 L/day/m2; Fill is Mound Sand (HLR 40 L/day/m2).

Size system based on HLR of 35 L/day/m2

Example 2:


Using Type 2 effluent, the native soil HLR is 70 L/day/m2, Fill is Clean Coarse Sand (HLR 50 L/day/m2).

Size system based on HLR of 50 L/day/m2


III- 6.8.3 SPECIFICATION AND INSTALLATION

With at grade and raised systems, a swale or interception drain is often useful to divert water away from the dispersal area.

A swale is a shallow depression installed at the upslope edge of the cover soil, and shaped to divert surface water away from the system. The swale may be lined with low permeability soil or a liner to help divert water.

For interception drains, see Section III- 6.19.


III- 6.8.4 TOE BLANKETS

In some circumstances, it may be appropriate to install a toe blanket around, or downslope from, the discharge system (see Section III- 5.6.7.1). A Toe Blanket is a blanket or mantle of sand or permeable soil that is placed at the toe of raised dispersal system or in the receiving area. The purpose is to aid seepage from the raised system into the native soil, or to provide additional depth for effluent to move away from the dispersal area and to provide a cover above soil that may be saturated.

When specifying and installing a toe blanket, consider the following:


In the maintenance plan, include measures for responding to an extended power outage. For example, the AP could specify in the plan that when the power resumes, the pump should ideally be manually cycled with short on times (< 2 minutes), followed by 30 minute off times, so that the dispersal system is not overloaded.


Figure III- 18. Schematic of Demand Dosing Terms


III- 6.12.2.1.(c) Timed dosing pump chamber

Timed dosing systems are intended to equalize flow peaks and ensure relatively even distribution throughout the day (24 hrs.). This is achieved by use of a timer, and pre-set pump on and off periods. In some cases, the dosing regimen can include a “lag” event. This increases the dose frequency to reduce peak flows.

The guideline working volume for the pump chamber is 2 times the Daily Design Flow.

Figure III- 19 describes the terms used when specifying a timed dosing system. See Section III- 6.12.2.1.(b) for discussion of pump submergence.

To equalize flows, a larger reserve volume (equalization volume) is needed above the timer allow float. For small flow systems (DDF < 9100 L/day) a minimum volume of 0.67 × the Daily Design Flow is used. For larger systems flow equalization should be specified on a project specific basis.

The lag float is typically set to trigger dosing at a higher frequency than the standard timer (lag or override timer). The Volume II standards specify that the lag float should not activate a demand dose. This is to prevent overloading of the dispersal area.

The lag float can be placed above the alarm, as shown. Alternately, the standard timer can be set to dose at average flows and the lag timer set to dose at DDF, in which case the lag float is below the alarm float and a second reserve volume is needed above the lag float before the alarm activates. This approach may require a larger pump chamber, but will result in improved spread of timed doses over the whole day.


Figure III- 19. Schematic of timed dosing terms: showing example of tank with lag float

For systems where the flow is pre-equalized (for example, from a timed dosed pre-treatment system) the pump chamber may not need to be as large because this equalization volume will not need to be as large.

The standards indicate that the lag (override float switch) should not cause demand dosing, and that the override event should not dose at a rate greater than DDF. The lag float can be installed above the alarm, or combined with the alarm float. In some cases the lag float is below the alarm, with the standard timer set at average daily flow and the lag timer at DDF. In this case, two equalization volumes are needed—one for the standard timer and one for the lag (override) timer.

The alarm reserve volume should be at least 50% of the DDF. If larger alarm volumes are used, then there is no risk of overloading the dispersal area with large doses because the alarm reserve storage will be time dosed as for normal dosing.


III- 6.12.2.2 Siphon Systems and Floating Outlet Devices

Siphons and floating outlet devices are only suitable for demand dose systems.

The correct tank size should be used to match the siphon or floating outlet device range and provide the design dose volume. Follow manufacturer guidelines.

After the high level alarm activates, siphon or floating outlet device vaults should include an alarm reserve volume of 25% of DDF for systems with overflows, or 50% of DDF for systems without overflows.


Where siphons are used to dose pressure distribution systems or pressure manifolds, design should ensure that the distribution system or pressure manifold is properly pressurized to achieve uniform distribution.

Follow manufacturer recommendations for design, unless these are inconsistent with the standards of the SPM.


III- 6.12.3 SPECIFICATION AND INSTALLATION


III- 6.12.3.1 Pumps,

Any pump should be easily removable without having to remove other components.

Lifting ropes or corrosion resistant cable or chain are acceptable for pumps weighing less than 40 kg. Heavier pumps should be installed with a lift assembly rail system and a pit-less adaptor.

Provide adequate free length of the electrical service cord to allow removal of the pump, without disconnection, to an external position near the access opening.

See Section III- 6.4.2 and III- 6.2.


III- 6.12.3.2 Pump chambers

See Section III- 6.4 for guidance on tank installation.


III- 6.12.3.3 Siphons and floating outlet devices

For siphons and floating outlet devices, follow manufacturer recommendations for specification and installation, unless these are inconsistent with the standards of the SPM.

Transport line installation may need venting to avoid air binding in the line.

For a pressure system or pressure manifold, ensure at commissioning that uniform distribution and adequate distal pressure (squirt height) is achieved, and if not, adjust transport line to provide proper pressurization of the distribution network.

Siphon systems need to have a reliable method for detecting trickling failure. Typically a float switch or mechanical float is used to trigger a cycle counter, which is used to monitor flows and also serves to detect trickling failure.


III- 6.12.3.4 Float switches and level sensors

Install float switches or transducers to provide for easy removal and replacement.

Removable float trees or float hangers, with weighted floats, can be used for float control systems. Similar methods can be used for other types of level sensors.

Float wires or transducer wires and vent tubes that are in the pump tank should be removable without having to excavate. This can be provided for by using conduit to a junction box.

Control float switches, transducers, associated wires or vent tubes should not be attached to the force main (pump riser pipe). There needs be adequate free length of float wires or level sensor wires and tubing to allow removal for servicing without disconnection.


III- 6.12.3.5 Calculating dose volume or dose time and frequency at commissioning

When a pressure distribution or subsurface drip dispersal (SDD) system is commissioned the time to pressurize the system is measured, and the dose time is either measured (demand dose system) or is set (timed dose system).


For pressure distribution systems that remain full, or which drain back to the pump chamber, the pressurization time is measured from the first evidence of effluent flow from an orifice to full squirt height from all orifices.

The time to refill the force main and other portions that drain back is measured from the start of the dose to the first evidence of effluent flow from an orifice. This time added to the dose time (or the volume is added to the dose volume), but is not used to calculate distribution uniformity.

The most favorable dose volume or dose time can then be calculated. This is typically planned so that the distribution network is fully pressurized for 67% of the dose time (pressure distribution) or 80% of the dose time (SDD). This means that 33% (0.33 as a proportion) of the total dose time can be used to fully pressurize a pressure distribution system, or 20% (0.2 as a proportion) for a SDD system.

At the planning stage, a preliminary dose time or volume is determined and a minimum number of doses per day at DDF is specified. This dose volume can be adjusted at commissioning to allow the use of as small a dose as practical.

Typically, the minimum dose frequency (so the largest dose time or volume) is determined at the planning stage to ensure the system will meet standards for dose frequency and HAR. Then at commissioning a smaller dose time or volume can be used to improve performance, but still provide adequate distribution uniformity.

This smaller dose will result in a dose frequency that is higher than the minimum specified in the standards. At commissioning distribution uniformity can be confirmed in one of two ways:


Table III- 20 summarizes lateral layout and minimum number of laterals in relation to effective bed width for beds on sloping sites. More laterals can be used, provided that no laterals are installed in the downslope half of the effective bed width, and no laterals are installed closer than 60 cm to the upslope edge of the bed.

Table III- 20. Minimum number of laterals for at-grade beds on sloping sites (> 2%)


EFFECTIVE BED WIDTH

LATERALS AND LOCATION

0.6 to < 1.2 m

1 lateral, 60 cm downslope from upper bed edge

1.2 to < 2.4 m

2 laterals, first at 60 cm downslope from upper bed edge, second at centerline of effective bed width or at 60 cm on center from the first lateral.

2.4 to 3 m

3 laterals, first at 60 cm downslope from upper edge second and third at 60 cm on center.


III- 6.13.2.3 Example of sizing, low slope or flat (≤2% slope) site

Site slope 1.5%, DDF 1300 L/day, HLR selected 27 L/day/m2, LLR selected 45 L/day/m. Contour is not concave.


Determine minimum bed length = DDF ÷ LLR

= 1300 (/day) ÷ 45 L/day/m = 29 m

Determine minimum effective AIS for the bed = DDF ÷ HLR

= 1300 L/day ÷ 27 L/day/m2 = 48 m2

Calculate effective bed width needed = AIS ÷ length (max. 3 m)

= 48 m2 ÷ 29 m = 1.65 m (less than 3 m so OK)

For a flat site, the total bed width needed is = effective bed width Total bed width = 1.65 m

Total system width (minimum) = Bed width + 3 m = 1.65 m + 3 m = 4.65 m Total system contour length (minimum) = Bed length + 3 m = 29 m + 3 m = 32 m

Establish number of laterals for pressure distribution to the bed:


Number of laterals: Table III- 19 recommends minimum of two laterals Two laterals, orifices 60 cm on center (stagger orifices).

Establish Horizontal location of distribution lateral in the distribution cell for a low slope or flat site:


For two laterals:

Minimum lateral spacing to bed edge 30 cm

Place laterals equal distance either side of bed centerline

Lateral spacing to bed edge = bed width ÷ 4 = 1.65 m ÷ 4 = 0.41 m = 41 cm





III- 6.13.2.4 Example of sizing, sloping site

Site slope 8%, DDF 1300 L/day, HLR selected 27 L/day/m2, LLR selected 70 L/day/m. Contour is not concave.


Determine minimum length = DDF ÷ LLR

= 1300 L/day ÷ 70 L/day/m = 18.6 m

Determine minimum effective AIS for the bed = DDF ÷ HLR

= 1300 L/day ÷ 27 L/day/m2 = 48 m2

Calculate effective bed width needed = AIS ÷ length (max. 3 m)

= 48 m2 ÷ 18.6 m = 2.58 m (less than 3 m so OK)

For a sloping site, total bed width = effective width + 60 cm added to upper edge of bed

2.58 m + 0.6 m = 3.18 m

Total bed width = 3.18 m


Establish number of laterals for pressure distribution to the bed:


Number of laterals: For effective width of 2.58 m Table III- 20 recommends three laterals Three laterals, orifices 60 cm on center (stagger orifices)

Establish Horizontal location of distribution lateral in the distribution cell for a sloping site:


Half of effective distribution bed width = 2.58 (m) ÷ 2 = 1.29 m First lateral at 60 cm from upslope edge of bed

Second and third lateral at 60 cm on center

Third lateral at 120 cm from first lateral = 1.2 m from upslope edge of effective bed Check that this is still in upper half of effective bed width:

Half of total distribution bed width = 2.58 m ÷ 2 = 1.29 m, 1.2m is in upper half.



III- 6.13.3 SPECIFICATION AND INSTALLATION

When preparing the site and installing the bed, follow the same general practice as for sand mounds. See Section III- 6.15.3.2. Preparation (including scarification) of the basal area of the bed is critically important.

Install a minimum 15 cm layer of aggregate on the bed area immediately after scarification. Do not drive equipment on the bed or on the area downslope of the bed.

Protect the bed and the receiving area from traffic.

Follow installation considerations for pressure distribution systems. See Section III- 6.10.3.

At-grade beds have limited storage capacity for storage of surge flows. For this reason timed dosing is recommended. If demand dosing is used, do not exceed 50% of DDF for pump or dosing chamber alarm reserve volume.


III- 6.14 Alberta At Grade system (AAG)

III- 6.14.1 DESCRIPTION

An Alberta At Grade system is a type of at grade system. A chamber bed is placed on the undisturbed organic litter layer of a site, into which highly treated effluent is distributed by pressure. The technique is intended for use with pressure distribution only. On a sloping site, the bed is not installed level across its width, but follows the ground slope. See Figure III- 22.


III- 6.14.1.1 Soil type

These systems are intended for use only on forest floor soils with a litter or “duff” layer. This is termed the “L- F-H” horizon. The horizon is made up of a sandwich of three organic layers (the L, F and H layers) developed primarily from needles, leaves, twigs, and woody materials, with a minor component of mosses:


III- 6.15.3.3 Sand lined trench or bed installation

Installation of these sand lined systems is similar to installation of trenches or Seepage Beds. Avoid risk of short circuiting from the sides of the bed to highly permeable native soils. See the appendix, Section III-

8.10for diagrams illustrating options.


III- 6.15.3.4 Uniform Density for Sand Media

Ideally, sand fill should be settled into a medium of uniform density. During installation, consider the following:

An ET bed can be specified to pond internally, and to be anaerobic for much of its depth, during large parts of the year. A sectional bed (similar to celled lagoons) can be used to encourage ponding during dry weather to improve capillary rise—which will improve evapotranspiration.

ET and ETA beds may be used seasonally. In this situation, covers may be used in the winter to prevent rainfall accumulation.


III- 6.18 BC zero discharge lagoons

III- 6.18.1 DESCRIPTION

The BC zero discharge lagoon is a system unique to BC. The lagoon disperses effluent by infiltration into the soil and by evaporation from the pond surface, similar in concept to an evapotranspiration absorption (ETA) bed.

A BC zero discharge lagoon system consists of one or more large excavated cells surrounded by a berm. Sewage is fed directly or from a septic tank by gravity - if topography allows – otherwise a septic tank is used and effluent is discharged to the lagoon by pump, siphon or other dosing device. Excavated clay material is placed and compacted in an elevated berm intended to prevent surface water from entering the lagoon and to provide reserve capacity.

Fencing is installed on the berm, or immediately adjacent to the berm to prevent entry of animals and to provide security/safety.

Preventing problems associated with odour, mosquito breeding, disease transmission by insects and exposure to animals are key considerations. Managing the long term growth of vegetation is important, particularly as trees can cause leakage.


III- 6.18.1.1 Diagrams of BC zero discharge lagoons

The following diagrams illustrate lagoons built to meet the standards.

Figure III- 26. Rectangular Lagoon




Figure III- 27. Rectangular and Circular Lagoons (top view)

Figure III- 28. Circular Lagoon



III- 6.18.2 SIZING AND LAYOUT


III- 6.18.2.1 BC zero discharge lagoon Sizing

Lagoon sizing is dependent on the water balance throughout the year of precipitation, evaporation and soil infiltration. This varies widely over the province. Lagoons do not need the use of a peaking/safety factor for Daily Design Flow due to their large capacity for flow equalization.

Lagoons should contain one to two years average sewage flow depending on the area in which they are installed. An adequate water surface area is needed to facilitate evaporation; the standards provide recommended surface areas.

Over sizing of lagoons is not advisable as this will lead to freezing, choking with emergent vegetation and may encourage mosquito breeding.

In the Volume II standards, lagoon sizes are based on the lagoon shapes described above. If other shapes are used or different side slopes are used, check that volume is sufficient and that the surface area is at least that in the selected standards table.

Where lagoons are sized to hold less than two years average design flow, reserve an area next to the installed cell for a second cell of sufficient size to make up to two years average flow.

Lagoons can also be sized based upon considerations of net evaporation, infiltration and individual site characteristics. However, as these are low cost systems, the simplified approach, following Volume II standards, may prove more economical.

III- 6.18.2.1.(a) Wet or dry area sizing for rectangular lagoons

The standards include two tables for rectangular lagoons, one for “dry” areas and the other for “wetter” areas.

As a guideline Figure III- 29 provides recommended north to south separation for use of these two sizes of lagoon, and for the circular lagoons. This map should not be taken as indication that a particular lagoon will work in a specific location.

The lines on this map are very approximate and as the elevation changes (i.e. near any mountains) the dry lagoons may need to be made larger even in the “dry" region. When using the smaller (“dry”) size lagoon sizing, the AP should review nearby lagoons to confirm whether the smaller lagoons will work in the specific area.


Figure III- 29. Recommended north to south separation for wet and dry area lagoon sizing


III- 6.18.3 SPECIFICATION AND INSTALLATION

BC zero discharge lagoons should be oriented along the surface contours in order to reduce slope variation. When laying out a lagoon consider potential for future replacement or addition of further cells.

Remove all trees from the lagoon and berm area, and around the lagoon for at least 15 m to encourage evaporation.

When constructing the lagoon it is important to observe soil and groundwater conditions. If a sand lens or other high permeability layer is seen, investigate and consider relocating the lagoon. This is to avoid risk of the lagoon draining to the layer and also to avoid risk of groundwater entering the lagoon and over filling it.


III- 6.18.3.1 Berm construction

The berm should be constructed so that:

If draining the force main back to the pump tank after each dose, ensure that the drainback orifice is large enough to drain the force main in less than 30 minutes. Check this at commissioning, and drill the orifice larger if necessary.

Note that elevating a part of the berm to allow use of the siphon break systems described above is allowed even if it raises that part of the berm above the maximum 1.5 m berm height.


III- 6.19 Site drainage

III- 6.19.1 DESCRIPTION

Interception drains may be used on a wide range of sites, and with a range of types of systems. These drains divert water away from the discharge area, lowering the water table. They are also known as “curtain drains”. See Figure III- 30.

Relief drains are used to lower the water table in the dispersal and receiving areas. Relief drains can be used on flat as well as sloping sites to compensate for groundwater mounding. They are also known as “toe drains” (if downslope of a system or at the downslope edge of a toe blanket), “tile drains” or “field drains.”

All drains need to be installed to meet the horizontal separation standards of this Manual. See Section III-

5.4.4 for information on upslope and side slope drain separations.


III- 6.19.1.1 Interception drain

A typical interception drain consists of a trench penetrating the restrictive layer by more than 20 cm, with a drainage pipe and drain gravel or drain rock (or a non-aggregate system).

In some cases, an impermeable membrane is installed on the downslope wall of the trench to provide a subsurface dam and to reduce the risk of seepage from the dispersal area into the drain. This could be a lateral drainage material which also provides drainage paths.

The drain can have a surface swale to divert surface flows, with the water entering the drain system or being diverted separately.

Figure III- 30. Interception drain schematic cross section



III- 6.19.2 SIZING AND LAYOUT

Swales and drains should be sized to handle the peak flows expected from the upslope watershed or aquifer.

In cases where large flows are expected, specialized design of the swale and drain is strongly recommended. Planners should seek a hydrologist’s opinion on expected flow volumes and peaks.


An interception drain should effectively intercept subsurface flow, and be capable of carrying this flow away, without causing flow concentration in parts of the discharge area or the receiving area.

If practical, the drain should penetrate the low permeability restrictive layer deeply enough so that water flowing around the drain cannot escape downslope. Alternatively a groundwater dam can be sealed to the low permeability layer.

Typically, a swale is provided at the top of the interception drain trench to divert surface water. Where large surface flows are expected, the base of the swale can be lined with a plastic or rubber membrane or with low permeability material to reduce infiltration of the collected water.

Drains should be sized and specified using good field drainage practice. A recommended design manual is the National Engineering Handbook Part 624 Section 16 “Drainage of Agricultural Land” published by the US National Resources Conservation Service and available online at:

http://directives.sc.egov.usda.gov/viewerFS.aspx?id=3887

If a drainage system is being relied on to lower the water table in order to achieve vertical separation standards, it is best to pre-install the drainage system to confirm that the drain can lower the water table to an adequate depth. This would involve measuring the depth of the water table in the proposed dispersal area during the wet season, using observation standpipes as discussed in Section III- 3.3.2.2.(a).


III- 6.19.3 SPECIFICATION AND INSTALLATION

Drains should be installed using good field drainage practice.

When specifying an interception drain that is to be installed in erodible soils, such as silty or fine sandy soils, then use a filter could be to reduce erosion of soil into the aggregate and drainpipe. Three basic types of filters are commonly used:

If a system sometimes fails to meet the effluent quality standards, then consider more frequent sampling and testing. If the system consistently meets the effluent quality standards, then consider less frequent testing.


III- 7.2 Maintenance Procedures

III- 7.2.1 HOMEOWNER EDUCATION

It is of critical importance that the homeowner understands the need for maintenance of their onsite system, and the need to control what is discharged to the system.

The AP should educate owners, both at system commissioning and at subsequent maintenance visits, about their system.


III- 7.2.2 LOCAL MAINTENANCE BYLAWS

If a local government maintenance bylaw is in place the AP should forward a copy of the summary table(s) of maintenance requirements and schedule to the local government.


III- 7.2.3 WRITTEN REPORT OF MAINTENANCE

After maintaining the system, provide the owner or client a written report. In the report include at least the following:

The date maintenance and monitoring was carried out, the name of the client or owner, the civic address.

The weather on the day.


Describe if the system is being used in a manner consistent with its design capacity and condition. For the initial maintenance service report only - an evaluation of the system’s Filing document, maintenance plan or original permit (if available) in relation to the actual system found and the current usage. This may include analysis of any flow records or flow meter readings that are available.

For the initial maintenance service report only - a general description of the type and components of the system with a summary of what was located and tested - as well as anything that was not located or tested and an explanation of the reason why it was not.

An evaluation of the system’s current performance summarizing the results of the maintenance service and monitoring in layman’s terms, and making conclusions about system operation and malfunction.

A listing of monitoring data such as cycle counts, pump run time, pump run amperage, alarm events and any other flow or performance data provided by the pump control panel, flow meter, cycle counters or other monitoring features. This data will be useful at subsequent maintenance service to determine the flows received by the system since the last service.

Squirt heights for pressure systems, pressures for drip systems and any other relevant data regarding distribution performance.

A list of recommended repairs or improvements, with descriptions of how minor or serious these are, how soon these should be corrected, and the reason why it should be done.

Indicate any repairs that will require filing under the SSR.

AP seal with signature.


III- 7.2.3.1 Terminology for system operation and malfunction

ASTTBC has established guidelines which include terminology to be used to describe conclusions about system condition and performance. Use this terminology when reporting on system maintenance.

See http://owrp.asttbc.org/p/documents.php


III- 7.2.3.2 Photographic Evidence

Take photographs to document maintenance and maintenance inspection. Keep the photographs as a long- term record. It often helps to include photographs in the report to the owner.

Photos should be obtained to meet the goal of supporting the conclusions within the maintenance report - positive or negative. Obtain photographic evidence sufficient to show the following:

The overall site and the specific system component locations before the site is disturbed and components are exposed.

The exposed system components, with adequate detail to show the internal conditions of components such as septic tanks, dosing chambers, D-boxes and similar serviceable points (before and after cleaning, adjusting etc.).

Adequate detail to document any components needing immediate repair, performance malfunction, any illegal or prohibited features, and potential health or safety hazards.

The overall site and the specific system component locations after access points and all components are secured, backfilled as applicable, and put back in operating condition.


III- 7.2.4 FIRST MAINTENANCE SERVICE

Determine the number of occupants or users, and compare this to the design capacity of the system.

Check for leaking plumbing fixtures that cause unnecessary flow volume.

Check for oversized tubs, multi head showers or other potential sources of large flow volumes and surge flows.

Check the discharge points of any hot tubs, swimming pools, reverse osmosis wash water, floor drains and RV sewage dumps (or any other source not indicated in the original design) to confirm they are not connected to the onsite sewerage system.

Determine if appliances are relatively new, with water saving features, or older high volume types.

Discuss and educate the owners or users about water use that could contribute to peak flows, such as doing multiple loads of laundry on one day, or similar uses that could overload the system.

Check for water treatment devices. Check if the type and configuration produces any back flush cycles discharged to the onsite system. Check for devices that use chlorine, other chemicals or sodium salts, all of which may harm a sewerage system.

Check the property for any drainage systems such as interceptor drains, retaining wall footing drains, surface drainage, etc., and assess the potential impact on the wastewater system. These drainage systems may be critical to the proper functioning of the wastewater system, or may be potential breakout points for effluent. Drainage systems should be monitored and maintained.

Check to ensure that no discharges reach the system from any groundwater or surface water drainage system, such as roof water or foundation drains, catch basins, driveway grates, etc.

Conduct a flow test to confirm that all flows, from every plumbing fixture (including from any secondary buildings), arrive at each component of the onsite system in a correct manner.

Run these tests with small to moderate flows that reflect normal water use in the building; do not flood the sewerage system. The run time for each fixture should be only long enough to confirm the appropriate arrival of flows, confirm that there is only one system in operation, determine if a soapbox or grease trap is used, and confirm there is no diversion of wastewater.

Check for flows arriving in the septic tank in a consistent manner without surging or ‘gurgling’, which could indicate bowed, damaged or clogged sewer lines.

At subsequent maintenance visits, the AP should re-check the components listed above, but the scope of examination may be reduced. For example, the flow test may not be necessary, and a brief discussion with the owner or occupants may confirm that water use has not changed.


III- 7.2.5 MINIMUM SCOPE OF MAINTENANCE

At each maintenance service, in addition to any specific provisions in the maintenance plan:

Examine, test, and document the condition and performance of the entire system including the soil dispersal system.

If media is used in treatment systems such as sand filters, any packed bed filter, CTDS, or any other products using proprietary media – assess the condition and serviceability of the media and determine when the media should be replaced.

Make written conclusions regarding the operation and performance of the system. Key points include reporting any performance malfunction, illegal features, or any health or safety hazard.


Carry out any maintenance and monitoring tasks as prescribed by the maintenance plan as filed. If no filing or maintenance plan is available, determine and document appropriate maintenance tasks based on standard practice to ensure proper operation as intended by the system design.

Confirm the security and structural integrity of lids and access points to tanks, treatment systems and D- boxes.

If backups of the dispersal system are observed, use a pipe camera to check for structural damage or clogging of the piping system.

If there are no obvious signs of blockages, excavating by hand should be done to determine the degree of clogging of drain rock and infiltrative surface by biomat and oil and grease, Check for other potential causes of backups, such as excessively high groundwater levels (above dispersal piping).

This assessment by hand excavating should be done for clogged systems, but is also recommended practice for any system that has been in use for 10 years or more to identify premature clogging and to observe the overall condition of the dispersal soil. Adequate VS can also be confirmed by hand excavation or augering.

Any drainage systems (interceptor drains, swales, ditches, etc.) that have a potential effect on the wastewater system should also be maintained, as follows:

Confirm that the drainage system continues to divert surface or sub surface flows in or adjacent to the wastewater dispersal area, as intended by the original plans and specifications. This could include pipe camera examination. Camera inspection may only be appropriate during the initial service, and when problems are suspected.

Locate and examine any cleanouts or observation ports, clear the drain outlet, and flush any plugged drainpipes.

See Section III- 7.3for minimum maintenance tasks.


III- 7.2.6 WRITING A SIMPLIFIED OPERATION AND MAINTENANCE PLAN

If there is no maintenance plan available, the maintenance provider should write one for the owner. This may have less detail than the comprehensive maintenance plan and owner’s manual outlined in Section III- 3.7.2. This simplified version is intended to support future maintenance, and to provide the basic information for the owner or user.


III- 7.2.7 REPAIR WORK BY MAINTENANCE PROVIDERS

Minor repairs, and replacement of some components, can be included within the scope of maintenance. However, major repairs, alterations, or replacement of major components, fall outside the scope of maintenance.

Major repairs require a Filing, and must only be carried out by APs that have been qualified and accredited to plan or install systems. See Section II- 2.1.2.


III- 7.3 Minimum Maintenance Tasks

III- 7.3.1 GENERAL MAINTENANCE TASKS

Refer to Section III- 7.2for checklists covering maintenance procedures and reporting.


Specific maintenance tasks for systems are described under the specific system type, below and may be expanded on in the system maintenance plan prepared by the system planner or designer.

General maintenance tasks include:

Confirmation of suitable access provisions to facilitate ongoing maintenance and monitoring (e.g. risers exposed at or above grade, lawn boxes).

Confirmation of continuing safety provisions, including, but not limited to, secure tank lids, and prevention of contact with electrical components and junctions.

Examine electrical connections and components for corrosion and general condition and safety. Check for proper sealing of conduit and components to prevent passage of gases or moisture. Follow the BC Electrical Code. Be aware of restrictions on which work must only be done by a qualified electrician.

Check records of flow. Compare this data to records of commissioning or previous maintenance; calculate the actual average flows since the last record; and compare to the average flow allowance (50% of DDF) over the intervening period.

Perform system testing to confirm proper operation of all control features and alarms.

Observe and confirm proper operation of all isolation valves, check valves, air release and vacuum valves, water hammer arrestors, solenoid valves, back flushing valves, and indexing valves.

Specialized information and specific maintenance and monitoring tasks will be included in the Maintenance Plan created by the system planner or designer.


III- 7.3.2 COLLECTION AND CONNECTION SYSTEMS

Pump system maintenance in the house is a plumbing issue and falls outside of the onsite system; however, the owner should be encouraged to follow the minimum maintenance standards for pump dosing systems.

These minimum standards should also be applied to STEP, grinder pump and vacuum systems maintenance.

Gravity collection systems should be monitored for adequate flow and proper scouring.

Piping systems should be evaluated for leaks and the infiltration of water.


III- 7.3.3 SEPTIC TANKS AND EFFLUENT FILTERS, OTHER TANKS

Examine the inlet and outlet baffles in the septic tank for proper configuration, condition, alignment, and blockages.

Check for signs of current or past backing up (e.g. liquid levels, residue, solids, or scum at elevations higher than the normal working level).

Check for proper liquid levels in the tank. Working level should be equivalent to the outlet invert.

Generally this is from 3 to 8 cm below the inlet invert. Lower levels may indicate a leaking tank. Higher levels may indicate a blockage downstream from the tank, misaligned piping, or a tank that is out of level.

Check for leaks, and evidence of settling of the tank or settling or misalignment of the inlet or outlet piping.

Check for flows arriving in the septic tank in a consistent manner without surging or ‘gurgling’, which could indicate bowed, damaged, or clogged sewer lines.


Check for trickle flows entering the septic tank when no water fixtures are running. This may indicate groundwater infiltration into the tank, or a leaking fixture in the building. Also, check for evidence of leak at other locations, including: (1) caulking or seals around inlet and outlet, (2) tank risers, (3) tank lids, (4) mid seam seals on two compartment tanks, (5) tank cracks, and (6) pipe connections.

Check for venting and integrity of vent screens.

Assess the sewage characteristics in the septic tank. Look for signs of excessive household use of materials harmful to bacteria, unusual solids build up, and non-biodegradable materials. Check for excessive fats, oils and grease. Confirm that appropriate biological activity is established.

Assess the sludge and scum accumulations. Pump out when any of the following are noted:

Total solids accumulations are more than 1/3 of the internal height of the tank.

The scum layer reaches the top of outlet T in a one compartment tank.

The scum layer reaches the top of inlet T in a two compartment tank.

Any obvious carry-over of solids to the second compartment.

Premature effluent filter clogging.

An increase in TSS or O&G noted in downstream components.

Before pumping the tank, check for a high water table that might cause the tank to buckle or float. Check for monitoring wells or ports. After pumping, refill the tanks with water, if so specified in the maintenance plan or manufacturer guidelines.

Examine and clean the effluent filter(s). If no filter is present, consider retrofitting the tank with a suitable filter.

When cleaning the effluent filter, avoid scum or sludge exiting the tank.

Check and test the operation of the effluent filter alarm, if installed.

Visually observe the effluent.

For trickle gravity systems, this is generally done in the D-box.

For dosed systems, this is done in the dosing chamber.

Consider the effluent colour, odour, and a visual assessment of turbidity as an indication of suspended solids. Look for signs of appropriate settling of solids and biological treatment from the septic tank.

Consider the degree of growth or attachment of residue on interior surfaces.

Laboratory or field testing of effluent may be specified in the maintenance plan for Type 2 or 3 systems, or if problems are indicated for Type 1.


III- 7.3.3.1 Tank integrity

When the tank is pumped, use a camera suited for tank examination to check the interior of tanks.

Plastic or fibreglass tanks should be checked for distortion, cracks, and bruising (i.e. as may result from excessive pressure by backfill material or groundwater, or by damage during installation).

Concrete tanks should be checked for cracking and concrete degradation.

Many older systems use tanks made from wood, steel, concrete blocks, or other materials and styles that are prone to degradation, leakage, and structural failure. All tanks can be damaged by poor installation procedures or excessive weight (i.e. from machinery, other traffic, or excessive depth of burial) after installation.


At each visit examine all tanks to determine if there are any signs of structural failure, distortion, degradation, damage, or leaks (this does not require pump out at each service).


III- 7.3.3.2 Abandoning or Decommissioning Tanks

To decommission and abandon a septic or other tank, pump out all contents, and safely dispose the contents at an approved facility.

Tanks may be removed and disposed of at an approved facility. Tanks may be abandoned and decommissioned in place.

To abandon and decommission tanks in situ:

Fill material should be selected to minimize potential settling. Well-drained native soil, such as sand or loamy sand, may be considered. Avoid cohesive or organic soils.


III- 7.3.4 SEWAGE TREATMENT SYSTEMS

For sewage treatment plants, and for CTDS, in addition to checks related to tanks and enclosures, check the following:

Confirm proper operation of (as applicable) air blowers, and re-circulating pumps. Consider scheduling rebuild or replacement at a suitable interval.

Check that the treatment system enclosure, access and venting are properly sealed or screened to prevent human or animal (flies, rodents etc.) contact with effluent.

Examine and confirm the condition of any media used; clean or replace ineffective media.

Dispose of any used media at approved disposal site as noted below.

Examine and clean UV bulbs and related hardware. UV bulbs should typically be replaced every 12 months.

Sample and test the effluent quality, as directed by the maintenance plan. If there is no plan, then test the effluent following the minimum interval standards of Section II- 7.1.

Include other maintenance tasks included in the manufacturer’s recommendations and the maintenance plan.

If a sand or manufactured media is used for treatment in a CTDS, a packed bed filter, a sand filter, or a similar application, then check the condition and serviceability of the media should. Assess when the media should be replaced.

If it is time to replace the media, then check that the media is disposed of in a safe manner that minimizes health risks. Arrange disposal at a waste handling facility that is approved by the Ministry of Environment.


III- 7.3.5 DISPERSAL SYSTEMS, GENERAL

Check for indications of leaks such as wet or spongy grass, excessive growth, or surface ponding around tanks and throughout the system.

Observe the dispersal system for evidence of surfacing effluent, excessive settling, or soil or sand erosion.

Confirm appropriate vegetative cover.

Confirm that the dispersal system is protected from:

cover by structures or impervious materials

surface and sub-surface drainage into the dispersal area

soil compaction (e.g. traffic, livestock)

soil removal, addition, or grade alteration

Examine all observation ports in the dispersal area, and assess any liquid levels found.

Examine all observation standpipes, and assess vertical separation.

Although unusual, the maintenance plan may specify collecting of samples from observation ports or monitoring wells.

For a dosed system, check the observation ports before and after a dose.


III- 7.3.6 GRAVITY DISTRIBUTION

Evaluate the D-box or other flow splitting device for degradation, settling, signs of backups, and solids accumulations. Check for leaks, and evidence of trickle flows or groundwater infiltration into the septic tank or D-box.

Confirm even distribution to the laterals from the D-box, splitter tee, drop box or pressure manifold.

For dosed systems, check to see if the dose reaches the ends of laterals

Check that cycle the counter is operating correctly for tipping D-box systems

For troubleshooting, consider examining the laterals using a pipe camera.

Flush, jet, or vacuum clean any plugged laterals.

Any pressurized system component should be evaluated for leakage. Where a serial or sequential distribution system is used:

Consider taking the upper laterals out of service for resting to allow the biomat to degrade;

Check all drop boxes for degradation etc. as for single box systems. Even if only the first one or two drop boxes are in active use, all drop boxes should be checked during monitoring and maintenance as the non- used boxes have a tendency to deteriorate due to H2S gases rolling downhill from one box to the next;

Observe flow behaviour with some tracing dye; and

Inspect pipes and laterals using the pipe camera for the same reasons as the single box system.


III- 7.3.7 PRESSURE DISTRIBUTION

Perform a residual pressure test and record distal pressure (squirt height). Compare this to the commissioning record, and to previous maintenance records. Use same size and type of orifice used at commissioning. When pressure testing:

Avoid contaminating the site with effluent on the surface; direct the flow back into the trench, or use clear pipe or tubes;

check for equal distribution; and

check for drain back to lower laterals;

if effluent is draining to lower laterals, evaluate the check valves, or other design feature, that was intended to prevent this;

If commissioning records are not available, the minimum recommended distal pressure is 60 cm for 3/16″ or larger orifices, and 150 cm for smaller orifices.

Flush the system. If the force main has cleanout(s), then isolate all laterals, and then flush the force main first. Next, use the lateral isolation valves to increase the scouring velocity by directing the full pump flow to each lateral individually.

Based on the results of the flushing (above), consider additional pressure flushing, jetting, or vacuuming;

Flush the system on the established schedule, or when residual head falls more than 25% below commissioning records;

note that if tubes or clear pipes are used for testing, a 10% variation may be detectable;

when flushing laterals, note the extent, colour and consistency of any solids discharging from the cleanouts of each lateral;

When flushing laterals, the liquid that is flushed out of the laterals should be directed back into the distribution trench or bed. The liquid could also be directed into an acceptable container and disposed of properly (example to the septic tank or to a vacuum truck); this is preferable where there are significant solids.

The infiltration surface, as observed through a cleanout access or observation port, should drain quickly after the pump switches off. If it does not drain quickly, the cause should be investigated.

If lateral valves were closed to flush the laterals, then reset the distal pressures (squirt heights) to ensure even distribution, consistent with the design and commissioning records. Record the squirt heights or pressures.

Any flow control orifices should be cleaned, and checked for correct sizing with design specifications.

Test the dosing application rate, and test the pump tank drawdown, and compare these to the commissioning data.


III- 7.3.8 SUBSURFACE DRIP DISPERSAL

For subsurface drip systems, advise the owner to ensure that vegetation re-establishes in the dispersal and receiving areas, and that access is restricted during the first year. On some sites, fencing may be needed until vegetation establishes, to avoid damage by deer or other animals.

After the first year of operation, lightweight track equipment may drive over the areas, but heavy rubber- tired vehicles should be kept off the drip dispersal area.


Regular maintenance should include collection of data as collected at commissioning, see Section III- 6.11.3.6.

Maintenance tasks and considerations include those generally applicable to dosing and dispersal systems. An AP should consider the following additional tasks:

Inspect and hand clean the fine filter(s).

Open the field flush valves and manually flush the system.

Check system pressures, and compare the pressures to the baseline data from commissioning records.

Inspect and clean the air valve/vacuum breakers, and confirm proper operation. Consider regular replacement.

Inspect and clean the field and filter flush valves, and confirm proper operation.

Check the dispersal field for signs of breakout, surfacing effluent, leaks, and rodent problems, and confirm appropriate vegetation.

Confirm continued protection of the dispersal area from traffic, animals, or other use that could compact soil or damage components.

See Section III- 6.11.2 for reference to the EPRI manual which includes guidance on maintenance for SDD systems.


III- 7.3.9 DOSING SYSTEMS AND CONTROLS


III- 7.3.9.1 Pump tanks:

Inspect tanks as per Section III- 7.3.3.

Visually inspect all electrical connections for signs of corrosion, black deposits on copper items that may indicate leakage of sewer gases and physical deterioration.

Check that the high level or other alarm(s) are in working order.

Check that float switches are performing properly.

Visually inspect the control panel box for water tightness, condensation or corrosion.

Check that the timer or control relays are functioning and that the control panel is functioning to design;

Inspect the float levels and measure the drawdown time (demand), or the drawdown per dose and timer function (timed systems).

Where a flow meter (installed or ultrasonic) is available, check and record the dosing flow rate and compare this to the commissioning record.

Where a pressure test port is available, record the pressure during a dose event.

Record pump run amperage. If the maintenance provider is not a certified electrician, then the pump amperage should only be recorded using a non-contact meter (for example, a clamp on meter) or a pre- installed meter.

Use of a flow meter is an alternate method of assessing pump performance, and may be more easily used to analyse pump wear.


Record the counter and pump run time information, and analyse this to determine the system flows. Check the run time against the dose time multiplied by pump starts. Due to inflow events on demand dosed systems, this will only provide an approximate check.

For timed dose systems, record the pump cycle counter, the lag or override counter (if used) and the low and high level alarm log. Analyse this information in relation to design flows. Check the pump drawdown for one dose, and relate this to the commissioning tests. Where a pump run time meter is installed, check the run time is as expected.

Inspect all plumbing fittings and connections.

Check that the anti-siphon air valve, orifice (or other provision) is operating effectively to prevent pump tank contents siphoning to the field between doses.

Check that all components are operating as per design.

At 3 – 6 year intervals, or as needed based on monitoring, vacuum and clean out the pump tank. The pump and floats should also be washed down at this time, which will assist in assessing their condition.


III- 7.3.9.2 Siphon Systems

A siphon system should be monitored for trickling failure. If this is found to have occurred, the cause should be determined.

At 3 – 6 year intervals, or as needed based on monitoring, vacuum and clean out the tank. Wash down the siphon.

As even a momentary blockage of the snifter tube may cause the siphon to enter trickling mode, the siphon chamber should be kept clean and leaves or other floating debris should not be left in the chamber.

Check the bell to ensure it is sitting level.

Test siphon operation over one cycle by adding water to the dosing chamber.

Check that cycle counter is operating correctly.


III- 7.3.9.3 Floating outlet device systems

Inspect the device for damage and test operation over one cycle by adding water to the dosing chamber.

Check that cycle counter is operating correctly.

At 3 – 6 year intervals, or as needed based on monitoring, vacuum and clean out the tank. Wash down the floating outlet device.


III- 7.3.9.4 Zones and alternating systems

Maintenance of alternating fields should include proper alternation, and this should include monitoring of trenches for biomat condition. In a gravity system, a pipe camera can be used to assist in monitoring of biomat condition. Observation port monitoring, or the observation ports of a chamber system will also assist.

Zone valves should be checked for proper operation. Any check valves should be checked for proper operation.


III- 7.3.10 AT-GRADE BEDS, ALBERTA AT GRADE SYSTEMS, SAND MOUNDS AND SAND-LINED TRENCHES AND BEDS

Follow the general maintenance provisions for dispersal systems and pressure distribution systems.

Protect sand mounds and receiving areas from compaction by traffic.

For bottomless sand filters, check the integrity of the membrane and any support materials.

For Alberta At Grade systems, check the depth of wood chip cover over the chamber bed and in the toe area and add wood chips to maintain the minimum depth specified by the standards.

Monitor all observation ports, both before and immediately after a dose from the pump tank

If effluent is observed ponding on the native soil surface, then find the cause and fix the problem. Potential causes include excess biomat accumulation due to poor oxygen infiltration resulting from over compacting cover soils, poor basal area preparation, hydraulic overloading, or water table mounding.

Severe clogging or hydraulic overloading at natural soil interface may cause surface seepage at the base of the mound. This may be due to improper installation, or to other factors such as overloading. If overloading is not the cause, this area should be permitted to dry; the downslope area re- prepared, and filter sand added. If this does not correct the problem, the system may need to be replaced (with a new filing).

For additional guidance, refer to Section III- 6.15.1.2(sand mounds), Section Figure III- 21 (at-grade beds) and Section III- 6.14.2 (Alberta At Grade systems).


III- 7.3.11 ET AND ETA BEDS

Follow the relevant provisions of the Seepage Bed, gravity and pressure distribution systems sections.

Vegetation should be maintained to provide good surface evaporation from the bed, as well as transpiration from the plants. Evapotranspiration will be lower with a thick grass mat.

Check vegetation and the soil surface of the bed for signs of salt accumulation, if salt appears to be accumulating, consider application of gypsum and flushing of the bed. Construction of additional bed capacity (under a new filing) may be helpful to allow alternating of beds, this can help to manage salt concentration in the soil.

Monitoring for ponding of effluent in the bed is critical, and should be carried out during times of the year when evapotranspiration is low. Monitor the observation ports for evidence that the bed needs cleaning.

Instruct the owner to avoid compaction of snow cover over beds, to improve evaporation and sublimation.

If the fluid level in the bed consistently exceeds the maximum level established as part of the original design, inform the owner that it will be necessary to construct a new bed or bed section. This will require a filing


III- 7.3.12 BC ZERO DISCHARGE LAGOONS

Maintain the collection system, septic tank, dosing system etc. as for other systems.

Check all plumbing fittings and ensure that piping is in operating condition.

Measure the level of water in the lagoon, relative to the top of the berm.

Maintain the fence and gate.


Control vegetation growth, including both emergent aquatic vegetation, and trees or shrubs that may reduce evaporation potential, or may damage the berms.

Check for animal damage and burrowing in the berms.

If the lagoon fluid level consistently exceeds the maximum freeboard level, then plan to enlarge the lagoon by constructing a new cell or a new lagoon. This will require a filing.


III- 7.3.13 DRAINAGE SYSTEMS

Standpipes may be installed to observe the water table in the dispersal area. The depth of the water table should be monitored annually, during the wet season. If the water table rises steadily over a period of years, consult a qualified AP for remedial action.

During the wet season, the drainage system itself should be checked and maintained, as follows:

Check the drain observation ports, and record the water levels.

Check the discharge point for adequate disposal, and check that the outflow is not eroding the soil, or causing other problems.

For drainage ditches: (1) Clear any vegetation that is restricting the flow; (2) Protect the ditch from erosion by regarding the ditch, planting grass, or armouring the ditch with drain rock or some other suitable protection.

For drainage pipes, consider using a camera to check the following:

Restrictions due to rodent nests, or soil erosion;

If the pipe is uniform in shape and grade; and

the point(s) where groundwater is being intercepted.

Note that the rate of collection is important. Incoming flows that are very fast may carry dirt that may clog the drain rock or geotextile fabric.

Iron that may be leaching into the pipe (which can lead to a serious form of clogging over time.) If this or other mineral accumulation is a problem, agricultural drain cleaning and jetting techniques could be used.

Repair broken or damaged outlet screens.



SEWERAGE SYSTEM

STANDARD PRACTICE MANUAL

VOLUME III APPENDICES

VERSION 3 SEPTEMBER 2014

HEALTH PROTECTION BRANCH

MINISTRY OF HEALTH

Sewerage System Standard Practice Manual Version 3 Volume III-Appendices Table of Contents

Volume III Appendices Table of Contents

III- 8.1 Owner declaration 1

III- 8.2 Residual Chlorine, water softener and other backwash water 2

III- 8.3 Soils 2

III- 8.3.1 Soil test pit log form 2

III- 8.3.2 Percolation test procedure 6

III- 8.3.3 Constant head borehole permeameter test procedure 9

III- 8.4 Sodium and soil dispersion 15

III- 8.5 System Selection Worksheet template 16

III- 8.6 Imperial conversion of standards tables 18

III- 8.6.1 Design Flow tables 18

III- 8.6.2 Minimum vertical separation tables 19

III- 8.6.3 Horizontal separation tables 22

III- 8.6.4 Hydraulic Loading Rates 24

III- 8.6.5 Linear Loading rates 25

III- 8.7 Septic tank projected pump out intervals 27

III- 8.8 Pressure distribution system information 27

III- 8.8.1 Options for preventing drain down of upper to lower laterals on sloping sites 27

III- 8.9 Sand mound installation instructions 32

III- 8.10 Sand lined trench/bed diagrams 34


III- 8 APPENDICES

These appendices are provided for information only and do not form part of the standards of this Manual.


III- 8.1 Owner declaration

The following checklist is provided as a guideline to be considered when preparing an owner declaration:

Legal description, civic address and tax assessment roll number for the subject property.

The full legal name of the owner(s), and contact information.

Lot plan and size of lot.

Current or planned water source. For example, an approved community water system, an on-site water well or fresh water body such as lake or creek.

Current and planned uses of the property e.g. residential only, commercial uses including home based business, or mixed commercial/residential.

Current or planned size and use of non-residential buildings.

Information regarding any wells located on the property, including well logs.

Current or planned residence information including:

Living area and non-living area of the residence.

Caution owner that if an unfinished area is finished later, an upgrade to the sewerage system may be needed.

Number of bedrooms.

Anticipated typical number of occupants.

Water treatment devices e.g. water softeners, filtration systems, disinfection or similar devices.

Garbage grinders/in-sink garbage disposal units.

Any other anticipated usage patterns that may affect sewage volume or constituents. Examples include:

Frequent large numbers of guests.

Non-typical food processing such as canning, high volume of baking or deep frying, beer or wine making.

Home based businesses with associated sewage discharges.

Hobbies with associated sewage discharges (e.g. photography, painting, pottery).

Information for the owner on their responsibilities under the SSR.

A signed declaration statement by the owner(s) including the following:

Identification of ownership (who are the legal owners?).

Confirm the accuracy of information provided.

Understanding that system use (including the design flow) is to be per the filing submitted to the Health Authority.

The AP may choose to add a simple letter of engagement to the declaration, describing project roles, budget, etc.


III- 8.2 Residual Chlorine, water softener and other backwash water

This Manual recommends that water softener backwash water and other filter backwash, as well as any highly chlorinated water, is not discharged to the sewerage system.

This is to reduce risk of negative impact on treatment processes due to toxic compounds or due to high sodium levels causing stratification, as well as to avoid potential impact on soil structure from elevated sodium levels in effluent. A further risk that is avoided is the potential impact on water volume from the structure.

For water applied to the soil a residual Chlorine level of <1 mg/L is recommended as avoiding impact on plants. Refer to: R. R. Duncan, R. N. Carrow, and M. T. Huck, Turfgrass and landscape irrigation water quality: Assessment and management. CRC, 2008, for further information.

A properly maintained water softener of a type which is water conserving and which flushes only on demand (Demand Initiated Regeneration Control Device or “DIR”) could discharge flush water to an onsite system without causing significant damage (and could, in some cases, assist, in relation to the same system with separate discharge, by replacing the calcium and magnesium removed by the softener). The low regeneration water use would also reduce the impact on the septic tank settling process.

However, the additional water flow and the risk of discharge of high concentrations of sodium (if the softener is not properly used or is not properly maintained) and of Chloride (in all cases) support the utilization of separate discharge. For further information refer to:


III- 8.3 Soils

III- 8.3.1 SOIL TEST PIT LOG FORM

A template for record of soil test pit evaluation is provided (sized to copy to survey book sized paper at 4.5 by 7 inches); the AP can use these forms or can develop their own equivalent forms. An example of a filled form follows the blank forms.

The test pit log should record at minimum the information as shown in this template and as recommended in the standards.


Job:

Site:

Date: Recorded by:

Weather:

No/type of pits:

Surface water:

Slope:

Slope type:

Freq/duration:

Vegetation:

Sub storey:

Type of bedrock/limiting layer:

Rock outcrops:

Notes:

Slope type: LL, LV, LC, VL, VV, VC, CL, CV, CC Slope position: SU, SH, BS, FS, TS Coarse fragments are > 2mm

Structure: GR, ABK, SBK, PL, WEG, PR, COL, SGR, MA, CDY Grade: 0, 1, 2, 3 (where 0 = structureless, 1 = weak, 2= moderate, 3 = strong) Consistence dry: L, S, SH, MH, HA, VH, EH, R, VR Wet: L, VFR, FR, FI, VFI, EF, SR, R, VR. Cemented: NC, EW, VW, W, M, ST, VS, I

Redoximorphic: Quantity: f, c, m. Size: 0, 1, 2, 3, 4, 5, Distinctness: Faint = F, Distinct = D, Prominent = P Roots: Size: VF, F, M, C, VC Quantity: few=1, common=2, many=3.


Profile Description

TP #: Site: Date: Slope: Veg.:


Depth

Matrix Colour


Texture

C. Frags

Structure


Consis.

Roots

Depth, sz/qty

Mottles

Depth, qty.

Moist Seepg.

From

To

Kind, %

Grade

Type





















































































Notes (Pores, cracks, other tests, samples):


Estimated WT: SHWT: R. Layer (Type, depth): Usable soil depth to limiting layer:

Example of filled site and test pit logs



Job: EXAMPLE OF FILLED TEST PIT LOG


Site:


Date: 11 Jan 2013 Recorded by:


Weather: Sun, 9C, wet weather in last week.


No/type of pits: 3, Machine dug


Surface water: NA


Slope: 4% in disp. Area and rec. area


Slope type: LL, BS (fld and rec area)


Freq/duration: NA


Vegetation:


Douglas Fir, Arbutus


Sub storey:


Dominant in field and receiving area: Oregon Grape, some Salal


Type of bedrock/limiting layer: Sandstone, fractured, fractures open


Rock outcrops: None in field area


Notes:


Profile Description

TP #: 1 Site: Date: 11 Jan 2013 Slope: 3.5%, LL, BS Veg.: As cover sheet


Depth

Matrix Colour

Texture

C. Frags

Structure

Consis

Roots Depth, sz/qty

Mottles Depth, qty

Moist Seepg

From

To

Kind, %

Grade

Type


1


0


6cm


Dk Brown


LS


10% gravel


0


SGR


L


6, F, 3


None


Moist


2


6


90


Brown


SL


15% gravel


2


GR


FR


90, C, 3


None


Moist


3


90


145


Brown


SL

45% gravel,

C gr. and rock frag.


2


SBK


FI


145, F, 1


None


Moist



145



Bottom of TP


Sandstone








No seep





































Notes (Pores, cracks, other tests, samples): Hor. 3 (C Hor), large fissures, risk of macropore flow, high coarse frag content.


Estimated WT: None SHWT: None R. Layer (Type, depth): Frac Rock, 145 Usable soil depth to limiting layer: 145


  1. 8.3.2 PERCOLATION TEST PROCEDURE

    Use the following instructions to conduct a percolation test. This is the procedure for a percolation test in BC; other provinces and states may use a different procedure:

    1. Perc test holes should be made at points and elevations selected as typical in the area of the proposed absorption field.

    2. Typically, test holes are be dug at each end of the area of the absorption field and near the centerline. Testing of the receiving area may also be necessary. Further holes could be needed, depending upon the nature of the soil, the results of the first tests and the size of the proposed dispersal area.

    3. Test holes should be 30 cm (12") square or 36 cm (14") round and excavated to the proposed depth of the absorption field (or as instructed by the designer). It is generally easiest to dig a larger hole part way down, then dig a 18 to 20 cm (7 to 8") deep accurately sized test hole in the base of the larger hole.

    4. To make the percolation test more accurate, any smeared soil should be removed from the walls of the test holes. This is best achieved by digging the hole approximately 5cm undersized (2") and then enlarging the hole to the accurate size as follows: using a rigid knife, insert the blade into the top side of the hole opposite you approximately 2.5cm (1") deep, holding the blade with its cutting edge vertical. Pull the blade away to break out a chunk of soil, repeat about an inch (2.5cm) apart around the hole, then repeat for another “ring” below until reaching the base. The result will be a hole with a ragged inner surface which looks like a freshly broken clod of soil.

    5. The base of the hole should be cleaned of debris and be approximately flat, use a metal scoop or similar. It should also be picked to present a natural surface. Note that a picking action (use a pointed tool) is needed, not a scratching action (which just produces smears that are indented).

    6. Place 5 cm (2") of clean fine gravel in the bottom of the hole. If the sidewalls are likely to collapse, use a paper basket to support the sidewalls (see note below). Place a piece of white plastic or similar provided with clear marks at 5" and 6" from the bottom of the test hole prior to adding the gravel. For greater accuracy a float and pointer arrangement can be set up.

    7. If the soil contains considerable amounts of silt or clay, and certainly for any soil with “clay” as part of the texture description, the test holes should be pre-soaked before proceeding with the test. Pre-soaking is accomplished by keeping the hole filled with water for 4 hours or more. The water should be added carefully and slowly to avoid disturbing the soil (including the sidewall soils). The test should be carried out immediately after pre-soaking;

    8. To undertake the test, fill the test hole (the accurately sized test hole) with water. The water should be added carefully and slowly to avoid disturbing the soil (including the sidewall soils). When the water level is 5" or less from the bottom of the hole, refill the hole to the top. No recording of time needs be done for these 2 fillings.

    9. When the water level, after the second filling (procedure (8)) is 5" or less from the bottom of the hole, add enough water to bring the depth of water to 6" or slightly more. Note that these measurements are from the base of the soil bottom (using the marker installed in step (6)), not the gravel layer.

    10. Observe the water level until it drops to the 6" depth, at precisely 6", commence timing, when the water level reaches the 5" depth, stop timing, record the time in minutes.

    11. Repeat procedures (9) and (10) until the last 2 rates of fall do not vary more than 2 minutes per inch or by more than 10% (whichever is less).

    12. Report slowest rate for each hole.

    13. Backfill the holes with the excavated soil and flag and label their locations so you can pick them up for the plan.

If a test hole is discarded due to flow in a root channel or similar, record the information and make a replacement test. If there is a large variation (greater than or equal to 50%) between tests in the same soil layer, increase the number of tests.


  1. 8.3.2.1 Paper basket to protect hole

    If sidewalls of the hole are likely to collapse, one option is to make a paper basket to protect and support the sidewalls as follows:

    1. Cut the bottom out of a large paper bag (grocery bag) and cut the bag open along a side.

    2. Lay bag on a soft surface. Punch holes in the bag about 5 to 7.5 cm (2 to 3 inches) apart using a pencil or similar.

    3. Roll into a tube, with the short dimension being the axis of the tube, and place in the test hole.

    4. Open the tube until the paper is in contact with the sidewalls of the test hole, then roll the top of the tube over to stiffen it.

    5. After placing the tube in the hole, place the plastic marker and add the base gravel layer.


      III- 8.3.2.2 Percolation rate for design

      Select the percolation rate to be used for sizing of the dispersal area. This will be the median (middle) value from all the tests conducted.


      III- 8.3.2.3 Percolation test form

      Percolation test


      Location (address):

      File #:

      Date:

      Tested by:


      Weather:



      Test number

      Depth of base of hole

      from surface (cm)

      Timings, mins per inch for water to drop from 6″ to 5″ from base of hole.


      Lowest rate (min per inch)

      #1

      #2

      #3

      #4

      #5

      #6

      1









      2









      3









      4









      5









      6









      7









      8









      Percolation rate for system sizing



      Notes:


      III- 8.3.3 CONSTANT HEAD BOREHOLE PERMEAMETER TEST PROCEDURE

      Use the following instructions to conduct a constant-head borehole permeameter test using a Pask (constant head borehole) Permeameter. Other borehole permeameters may be used; however, these instructions relate only to the Pask permeameter. This information is based on Appendix C of the Nova Scotia Sewage Disposal Guideline that can be found at the following web site:

      http://www.gov.ns.ca/nse/wastewater/sewagedisposalguide.asp

      The permeameter test measures the permeability (also called hydraulic conductivity) of the soil at the bottom of a borehole, above the water table. The test measures the hydraulic conductivity by temporarily saturating the soil at the bottom of the borehole. It measures the “field-saturated hydraulic conductivity”, which is commonly abbreviated as Kfs.

      The first step is to make or buy a permeameter. See the Nova Scotia Guideline for instructions on building a permeameter. This is a simple device to make, but the clear plastic tube (pipe) may be expensive or difficult to source. To avoid the clear plastic pipe, common white PVC pipe may be used with a sight gauge constructed from clear plastic tubing (Tygon or similar). Many permeameters have a screw cap rather than a rubber stopper at the bottom. Some permeameters have a ball valve on the lower tube; this is useful but not necessary. There are companies that make and sell permeameters and suitable soil augers.

      The upper clear plastic tube or pipe is a small water reservoir. Convenient dimensions are 9-10 cm inside diameter and 60 cm length, but this reservoir can be different diameters or lengths. A smaller diameter reservoir is more accurate for low-permeability soils and uses less water. You will need to know the inside diameter of the tube in order to calculate the volume of water draining into the borehole.


      III- 8.3.3.1 Equipment and supplies:

      MANDATORY:

      • Permeameter.

      • Supply of water. The test uses about 4 liters per test, if using a 10 cm diameter permeameter. A 5-cm permeameter uses about one liter per test. Water is usually supplied by garden hose or Gerry cans.

      • Hand auger. A commonly used auger has a 7 cm auger bit, but you can use augers of different diameters.

      • Wristwatch with second hand, or other timer with minutes and seconds.

      • Pre-printed forms. See the following pages for a blank form and an example completed form. OPTIONAL:

      • Wire brush, or length of pipe with protruding screws, or similar device to roughen smeared soils.

      • Tripod, sawhorse, or other method to hold the permeameter vertical during the test. This can be useful for shallow auger holes, or if conducting two of more tests at the same time.

      • Digging bar or steel probe. This is useful for gravelly or stony soils.


        III- 8.3.3.2 Test procedure:

        Select the locations and depths for the auger holes. A common layout is to auger four holes, one at each corner of the proposed dispersal area. Testing in the receiving area may also be needed, and testing of deeper soil layers may also be useful or needed.

        Holes should be augered to the same depth as the planned depth of the infiltration surface. For sand mounds and at-grade beds, the auger hole depth should be 25 to 35 cm. When augering the hole, do not use excessive downward pressure on the auger and in general it is best to remove the auger after maximum two turns to remove soil, this is intended to reduce soil compaction.

      • At each location, auger a hole to the required depth. In stony soil, it may help to probe using a digging bar or steel rod, to find a suitable location to auger a hole.

        • If the sides of the auger hole are smeared, gouge, pick or roughen the side walls with a wire brush, ice pick or other sharp object. Important: If you roughen or gouge the side walls of the auger hole, you will also need to take equal care to prepare the bottom and side walls (the infiltration surface) of the dispersal system.

      • Measure and record the diameter of the auger hole.

      • Complete the top part of the permeameter form.

      • Write down the soil texture and structure.

      • Turn the permeameter upside down, remove the plug, fill with water up to the “air inlet hole”, and then replace the plug.

      • Fill the auger hole to a water depth of about 25 cm.

      • Place the permeameter in the auger hole, with the “water drain slots” at the bottom of the hole.

      • Watch the clear plastic tube for large bubbles rising from the bottom.

      • As soon as the large bubbles appear, start taking readings of the height of water in the clear plastic tube (in millimeters), taking one reading every minute. If the rate of fall is very fast, you can take one reading every 30 seconds. If the rate of fall is very slow, you can take one reading every two minutes or more.

      • During the test, record the rate of fall of the water level in mm per minute.

      • When the rate of fall stabilizes, the test is complete. The rate of fall is stable if the fall is nearly equal for three consecutive readings. With most soils, this takes 4 to 20 minutes.

      • After the test, if a flow restrictive horizon is suspected close to the base of the hole, then auger or probe to this horizon and measure the depth.

      • Repeat for the remaining auger holes.

      • Calculate the Kfs for each of the test holes, using the calculation method below.


        III- 8.3.3.3 Calculation Method:

      • Write down the final stable rate of fall in the water level, in millimetres per minute.

      • Calculate the Flow Rate (Q) by multiplying the rate of fall by the volume Conversion Factor. Table III- 21 shows the factor for permeameters of various diameters.

        Table III- 21. Permeameter calculation factors


        INSIDE DIAMETER OF THE RESERVOIR (CM)


        FACTOR

        10.23

        8.22

        10.16

        8.10

        5.25

        2.17


      • For other sizes of permeameters, the conversion factor may be calculated as follows:

        • R = Radius in cm = Inside Diameter ÷ 2.

        • Conversion Factor = 0.3142 x R x R.

      • Write the flow rate on the form, in mL / minute.

      • Use the chart (at the bottom of the page) to select the Soil Factor (F), based on the type of soil and the diameter of the auger hole.

      • Calculate the Kfs. This is the Flow Rate (Q) multiplied by the Soil Factor (F), Kfs = Q x F.

      • Write this in the space at the bottom left part of the form.

      • If the highest measured Kfs is more than 10 times higher than the lowest, then the minimum allowable number of tests is six. This is because of the high variability of the soil.

      • Select the Kfs to be used for sizing of the dispersal area. This will be the median or middle value from all the tests conducted.

Mathematical-minded APs may want to set up a spreadsheet to calculate Kfs from the measured rate of fall, using the formulas in the referenced web site and other technical papers.


III- 8.3.3.4 Special Situations:

Site with a very shallow flow-restrictive horizon:

If the flow-restrictive horizon is within about 30 cm of the bottom of the auger hole, then the calculated Kfs may be lower than the true Kfs. If it is important to calculate a more accurate Kfs, then one option is to use the modified Glover formula, as outlined in the Permeameter Appendix (below).

III- 8.3.3.4.(a) Testing in hot weather:

If the temperature of the water used for the permeameter test is above 25 degrees Celsius, then the test results should be adjusted according to the procedure on pages C-2 and C-3 of the following reference:

http://www.gov.ns.ca/nse/water/docs/OSTG_11-Section11-TechGuideAppendix.pdf


III- 8.3.3.5 Troubleshooting:

III- 8.3.3.5.(a) Water level falls too fast:

If the reservoir water level falls too fast to measure, then it is only practical to estimate the lower limit of the soil permeability. The Kfs should be reported as: “greater than 30,000 mm/day”. In this situation, conduct at least eight permeameter tests.

A rapidly falling water level could also be caused by a large pore, such as an old root channel. In this case the problem can be noted and further tests done to confirm the soil permeability.

III- 8.3.3.5.(b) Water level is static; does not change:

In soils of very low permeability, if the auger hole fills with water to above the air hole, the water will drain slowly, delaying the start of the test. Gently remove some water from the auger hole to expose the air hole and start the test. If the reservoir still does not drain, this indicates soil of very low permeability, and the Kfs should be reported as “less than 10 mm/day”.

The soil can be re-tested using a smaller diameter permeameter and a larger diameter auger hole.

It may help to try permeameter tests at different depths or at different locations. Testing at different depths and locations will help in selecting the best location for the dispersal system and the best depth for the infiltration surface.

III- 8.3.3.5.(c) Water level drops very slowly:

In soils of low permeability, the permeameter water level may drop very slowly, about one millimeter per minute. Potential strategies for low permeability soils include: (1) re-test at different locations on the property; (2) re-test at different depths; (3) roughen or scarify the side walls of the auger hole; (4) re-test using a smaller diameter permeameter and larger diameter auger hole; (5) use an alternate permeability test method, such as a ring infiltrometer.


III- 8.3.3.6 Permeameter test form


Location (address):

File #:

Auger hole #:

AH location:

AH depth:

AH diameter (at bottom of hole): cm

Date:

Height of air hole: 20 cm

Permeameter inside diameter: cm

Tested by:


Constant Head Borehole Permeameter Test Results


Time of day

Total elapsed time min


Interim time min

Water level reading

Mm


Drop in level mm


Rate of fall

mm/min


Remarks or Observations


0





Start of test

















































Soil texture:







Structure:
































































Stable rate of fall in mm / minute =



For small (5.25 cm) permeameter: Flow rate (Q) = (Rate of fall) x 2.17 = mL / min

For large (10.23 cm) permeameter: Flow rate (Q) = (Rate of fall) x 8.22 = mL / min

Calculations Reference: Mooers, J.D., and D.H. Waller, 1993.

Soil factor (F) as a function of auger hole diameter and soil type:

AH diameter

7 cm

8 cm

9 cm

10 cm

11 cm

12 cm

18 cm

20 cm

22 cm


Gravelly sand and coarse sand

8.9

8.1

7.5

7.0

6.6

6.2

4.5

4.2

3.9


Fine-medium sand, loamy sand, sandy loam, structured soils

7.2

6.6

6.1

5.7

5.3

5.0

3.7

3.4

3.2


Massive clays and silts

4.4

4.1

3.8

3.6

3.4

3.2

2.5

2.3

2.1


Kfs = Q x F = x = mm/d


Example of a completed permeameter test form:


Location (address): Lot 11, Any Road, No Town, BC

File #: PLS-3

Auger hole #: 2

AH location: 5 m east of test pit TP-3

AH depth: 60 cm

AH diameter (at bottom of hole): 18 cm

Date: 22 July 2008

Height of air hole: 20 cm

Permeameter inside diam: 10.23 cm (4")

Tested by: JPL

Constant Head Borehole Permeameter Test Results


Time of day

Total elapsed time min


Interim time min

Water level reading mm


Drop in level mm


Rate of fall

mm/min


Remarks or Observations

09:41

0

1.0

155



Start of test


1


140

15




2


125

15




3


110

15




4


98

12




5


82

16




6


70

12




7


55

15


Soil texture: Sandy loam.







Structure: ABK 2







Angular blocky – moderate




































Stable rate of fall in mm / minute =

15


For small (5.25 cm) permeameter: Flow rate (Q) = (Rate of fall) x 2.17 = N/A mL / min

For large (10.23 cm) permeameter: Flow rate (Q) = (Rate of fall) x 8.22 = 123 mL / min


Calculations Reference: Mooers, J.D., and D.H. Waller, 1993.

Soil factor (F) as a function of auger hole diameter and soil type:

AH diameter

7 cm

8 cm

9 cm

10 cm

11 cm

12 cm

18 cm

20 cm

22 cm


Gravelly sand and coarse sand

8.9

8.1

7.5

7.0

6.6

6.2

4.5

4.2

3.9


Fine-medium sand, loamy sand, sandy loam, structured soils

7.2

6.6

6.1

5.7

5.3

5.0

3.7

3.4

3.2


Massive clays and silts

4.4

4.1

3.8

3.6

3.4

3.2

2.5

2.3

2.1


Kfs = Q x F = 123 x 3.7 = 455 mm/d


Comment: The Kfs can be rounded off to 460 mm/d.

III- 8.4 Sodium and soil dispersion

Sodium and salinity in wastewater can affect clay-rich soil in the dispersal area.

Over time, sodium may build up in the soil. This can disperse or expand the clay, breakdown of the soil peds, and collapse the soil structure. These processes reduce the soil permeability.

In high rainfall areas, infiltrating rainfall may leach the sodium from the soil, reducing the impact of sodium. On the other hand, in areas with lower rainfall and higher evapotranspiration, sodium concentrates in the soil over time, either from effluent or from irrigation water. This may also occur with ET and ETA beds, where the sodium may affect plants growing in the beds.

The effect of structural degradation of soil, resulting from sodium levels in wastewater, will tend to be more evident with Type 2 and 3 effluents. This is because:

III- 8.5 System Selection Worksheet template


ITEM

VALUE

CONSTRAINT, OPPORTUNITY, RESULT

SOLUTION AND RATIONALE

Soil texture




Soil structure and consistence




Other soil notes




Kfs




Percolation rate




Soil depth




Slope %




Slope shape, location




Elevation house sewer to dispersal area




Temperature




Net positive evapotranspiration?




Rainfall?





Soil constraints?













House bedrooms




House area




Occupants




Daily Design Flow




Daily Design Flow, option 2





ITEM

VALUE

CONSTRAINT, OPPORTUNITY, RESULT

SOLUTION AND RATIONALE


Soil depth and VS options, distribution and dosing options











Horizontal separation constraints?










HLR for Type 1




HLR for sand




HLR for Type 2





Minimum system contour length








Dispersal area size and options























Length constraint?








Other considerations








System summary




III- 8.6 Imperial conversion of standards tables

For information only this appendix provides selected standards tables converted from metric to Imperial measurements. Where gallons are shown, these are Imperial gallons (IG).

This Manual uses measurements and volumes in metric units. The AP may use conversion tables or calculators to convert those measurements to Imperial measurements.

APs may use these converted tables if working in Imperial measurement. However, in case of any inconsistency with the standards tables, the standards are the definitive version. Refer to the standards for table footnotes and other supporting information.

Since conversions include rounding of figures some converted figures may result in slightly larger system size or slightly larger separations.


III- 8.6.1 DESIGN FLOW TABLES

Table III- 22. Minimum Daily Design Flow (DDF) for Residences (IG/day)


NUMBER OF BEDROOMS

MAXIMUM FLOOR AREA (FT2)

DDF IG/DAY

1

1500

150

2

2500

220

3

3000

290

4

3500

350

5

4500

420

6

5500

480

Additional bedroom, add


66

Additional 10 ft.2


0.66

Table III- 23. Per capita Daily Design Flow for Residences (IG/day)


USE

PER PERSON FLOW (IG/DAY)

Single family dwelling

77

Multi-family (apartment)

66

Luxury homes

154

Seasonal cottage

55

Mobile home

66

NUMBER OF BEDROOMS

MINIMUM NUMBER OF OCCUPANTS

1

2

2

3

3

3.75

4

4.5

5

5.5

6

6.5

III- 8.6.2 MINIMUM VERTICAL SEPARATION TABLES

Minimum vertical separations are shown in inches.

Table III- 24. For gravity distribution systems (inches)


SOIL TYPE

EFFLUENT TYPE

MINIMUM VERTICAL SEPARATION (VS) IN NATIVE SOIL

  • Gravelly Sand or Coarse Sand, Coarse Sand,

    Loamy Coarse Sand, Sand and Loamy Sand

  • Or Kfs from 1,500 to 17,000 mm/day

  • Or Perc rate 0.5 to less than 5 min/inch


All types (I, 2 or 3)


60




Fine Sand, Loamy Fine Sand, Sandy Loam, Loam

1 or 3

36

2

48




Silt Loam, Silt

All types

48

Table III- 25. For uniform distribution with demand dosing to native soil or native soil plus less than 12 in. sand fill (inches)


SOIL TYPE

TYPE OF DOSING

EFFLUENT TYPE (HLR)

MINIMUM VS IN NATIVE SOIL

MINIMUM AS CONSTRUCTED VS


  • Gravelly Sand, Coarse Sand, Loamy Coarse Sand, Sand and Loamy Sand

  • Or Kfs from 1,500 to 17,000 mm/day

  • Or Perc rate from 0.5 to less than 5 min/inch


Demand dosing

1 or 3

24

24

2

24

34


Low frequency demand dosing

1 or 3

30

30

2

36

36







Other soils

Demand dosing

All types

24

24

Low frequency demand dosing

All types

28

28

Table III- 26. For uniform distribution with timed or micro-dosing to native soil or native soil plus less than 12 in. sand fill (inches)



SOIL TYPE

TYPE OF DOSING

EFFLUENT TYPE (HLR)

MINIMUM VS IN NATIVE SOIL

MINIMUM AS CONSTRUCTED VS

  • Very or Extremely Gravelly Sand or Coarse Sand

  • Or Kfs greater than 17,000 mm/day

  • Or Perc rate faster than 0.5 min/inch

Timed dosing

All types

24

34

Micro-dosing

All types

18

30







  • Gravelly Sand, Coarse Sand, Loamy Coarse Sand, Sand and Loamy Sand

  • Or Kfs from 1,500 to 17,000 mm/day

  • Or Perc rate from 0.5 to less than 5 min/inch


Timed dosing

1 or 3

18

24

2

18

30


Low frequency Timed dosing

1 or 3

24

30

2

28

34

Micro-dosing

All types

18

22







Other soils

Timed dosing

All types

18

24

Low frequency timed dosing

All types

28

28

Micro-dosing

All types

18

22

Table III- 27. For sand mounds and sand lined trenches and beds (inches)



SOIL TYPE


TYPE OF DOSING

EFFLUENT TYPE (HLR USED)

MINIMUM VS IN NATIVE SOIL

MINIMUM SAND MEDIA THICKNESS

MINIMUM AS CONSTRUCTED VS


All soil types

Demand dosing

1

10

24

34

Timed dosing

1

10

18

30


Micro-dosing

1 or 3

10

12

24

2

10

18

30

Table III- 28. For Subsurface Drip Dispersal (SDD) systems with micro-dosing (inches)



SOIL TYPE


INSTALLED IN


EFFLUENT TYPE

MINIMUM VS IN NATIVE SOIL

MINIMUM AS CONSTRUCTED VS

  • Gravel and Very or Extremely Gravelly Sand or Coarse Sand

  • Or Kfs greater than 17,000 mm/day

  • Or Perc rate faster than 0.5 min/inch

Native soil

All types

24

Fill material

All types

18

24






Other soils

Native soil

All types

18

Fill material

All types

18

24

III- 8.6.3 HORIZONTAL SEPARATION TABLES

Numbered notes refer to footnotes to the standards table. See Section II- 5.4.1.

Table III- 29. Minimum required horizontal separation distances (feet)



MINIMUM HORIZONTAL DISTANCE TO

FROM DISPERSAL SYSTSEM

FROM WATERTIGHT TREATMENT OR PUMP TANK

FEET

FEET

Wells



Surface source of drinking water

100

50

Domestic water supply well1

100

100

Domestic water supply well, high pumping rate2

200

100

Domestic water supply well, high pumping rate, in unconfined aquifer2

300

100

Irrigation well or open loop geothermal well

50

25

Deep monitoring well or closed loop geothermal well3

20

20

Shallow monitoring well4

10

0

Drinking water lines and cisterns



Drinking water suction line

100

50

Drinking water suction line, sleeved

25

10

Drinking water lines, under pressure

10

10

Drinking water lines, under pressure, sleeved5

3

3

Drinking water supply cistern, below ground

50

10

Water bodies and surface breakout



Permanent fresh water body6

100

33

Intermittent fresh water body7

50

33

Marine water body8

50

25

Break-out point or downslope drain9

25

0

Table III- 30. Minimum required horizontal separation for BC Zero discharge lagoons (feet)


MINIMUM HORIZONTAL DISTANCE TO

FROM LAGOON

FEET

Wells


Surface source of drinking water

100

Domestic water supply well1

100

Domestic water supply well, high pumping rate2

200

Domestic water supply well, high pumping rate, in unconfined aquifer2

300

Irrigation well or open loop geothermal well

50

Deep monitoring well or closed loop geothermal well3

20

Shallow monitoring well4

10

Drinking water lines and cisterns


Drinking water suction line

100

Drinking water suction line, sleeved

50

Drinking water lines, under pressure

25

Drinking water lines, under pressure, sleeved5

25

Drinking water supply cistern, below ground

100

Water bodies and surface breakout


Permanent fresh water body6

100

Intermittent fresh water body7

50

Marine water body8

100

Break-out point or downslope drain9

50

Other


Building, dwelling

60

Building, other than dwelling

15

Property line

15

III- 8.6.4 HYDRAULIC LOADING RATES

Table III- 31. Maximum allowable HLR based on soil type (IG/day/ft2)



SOIL TEXTURE GROUP

STRUCTURE AND CONSISTENCE

CATEGORY

TYPE 1 (IG/DAY/FT2)

TYPE 2 (IG/DAY/FT2)

TYPE 3 (IG/DAY/FT2)

Gravel and Very or Extremely Gravelly Sands

F or P

0.91

1.32

3.06

Gravelly Sands and Coarse Sand

F

0.81

1.32

2.65

P

0.71

1.32

2.45

Sand, Loamy Sand

F

0.61

1.22

1.83

P

0.55

1.02

1.63

Fine Sands, Loamy Fine Sands, Sandy Loams

F

0.55

1.02

1.63

P

0.47

0.91

1.43

VP

0.34

0.81

1.02

Loam, Silt Loam, Silt

F

0.47

0.81

1.43

P

0.30

0.61

1.02

VP

0.24

0.51

0.71

Clay Loam, Sandy Clay Loam, Silty Clay Loam

F

0.30

0.51

0.81

P

0.24

0.30

0.40

VP

NA

NA

NA

Sandy Clay, Silty Clay, Clay

F

0.24

0.30

0.40

P

NA

0.30

0.30

VP

NA

NA

NA


Table III- 32. Maximum allowable HLR based on permeability or percolation rate (IG/day/ft2)


KFS RANGE (MM/DAY)

PERCOLATION TEST RANGE (MIN/INCH)

TYPE 1 (IG/DAY/FT2)

TYPE 2 (IG/DAY/FT2)

TYPE 3 (IG/DAY/FT2)

  • 8000

< 1.0

0.91

1.32

3.06

4000 – 8000

1 – 2

0.91

1.32

2.65

2000 – 4000

2 – 4

0.71

1.32

2.04

1000 - 2000

4 – 7.5

0.61

1.22

1.83

550 – 1,000

7.5 – 15

0.55

1.02

1.63

300 - 550

15 – 30

0.47

0.81

1.43

150 – 300

30 – 60

0.30

0.51

0.81

75 – 150

60 – 120

0.24

0.30

0.40

< 75

  • 120

NA


III- 8.6.5 LINEAR LOADING RATES

Table III- 33. LLR based on soil type (IG/day/ft.)



SOIL TEXTURE GROUP

CATEGORY

SLOPE 0 TO < 5%

SLOPE 5 TO < 10%

SLOPE 10% TO < 15%

SLOPE ≥ 15%

(IN) SOIL DEPTH BELOW INFILTRATIVE SURFACE

(IN) SOIL DEPTH BELOW INFILTRATIVE SURFACE

(IN) SOIL DEPTH BELOW INFILTRATIVE SURFACE

(IN) SOIL DEPTH BELOW INFILTRATIVE SURFACE

10 –

18

18 –

24

24 –

36

≥ 36

10 –

18

18 –

24

24 –

36

≥ 36

10 –

18

18 –

24

24 –

36

≥ 36

10 –

18

18 –

24

24 –

36

≥ 36

Very or Extremely Gravelly Sands

F or P

10.1

17.5

22.8

26.9

19.5

26.9

26.9

26.9

26.9

26.9

26.9

26.9

26.9

26.9

26.9

26.9

Gravelly Sands and Coarse Sand

F

5.7

9.4

12.1

16.8

10.1

16.8

22.2

26.9

17.5

26.9

26.9

26.9

24.2

26.9

26.9

26.9

P

3.4

5.4

7.4

9.4

5.4

9.4

12.1

16.8

9.4

16.1

20.8

26.9

13.5

22.2

26.9

26.9

Sand, Loamy Sand

F

3.1

4.1

4.7

6.1

3.7

5.7

7.4

10.1

6.1

9.4

12.1

16.1

8.1

12.8

16.1

22.8

P

3.1

3.7

4.7

4.7

3.4

4.1

5.1

6.1

4.1

6.1

7.4

9.4

5.4

8.1

10.1

13.5

Fine Sands, Loamy Fine Sands, Sandy Loams

F

3.1

3.7

4.7

4.7

3.4

4.1

5.1

5.1

4.1

5.1

6.1

6.8

5.1

6.1

7.4

8.8

P

2.7

3.1

3.7

3.7

3.1

3.4

3.7

4.1

3.4

3.7

4.1

4.4

4.1

4.4

5.1

5.4

VP

1.7

2.1

2.4

2.4

1.7

2.4

2.7

2.7

2.1

2.4

2.7

2.7

2.4

3.1

3.4

3.4

Loam, Silt Loam, Silt

F

2.7

3.1

3.7

3.7

3.1

3.4

3.7

4.1

3.4

3.7

4.1

4.4

4.1

4.4

5.1

5.4

P

2.1

2.4

2.7

2.7

2.4

2.7

3.1

3.1

2.4

3.1

3.4

3.7

3.1

3.4

4.1

4.4

VP

1.2

1.5

1.8

1.8

1.3

1.7

1.9

1.9

1.5

1.7

2.1

2.1

1.7

2.1

2.4

2.4

Clay Loam, Sandy Clay Loam, Silty Clay Loam

F

2.1

2.4

2.7

2.7

2.4

2.7

3.1

3.1

2.4

3.1

3.4

3.7

3.1

3.4

4.1

4.4

P

1.7

2.1

2.4

2.4

1.7

2.4

2.7

2.7

2.1

2.4

2.7

2.7

2.4

3.1

3.4

3.4

VP

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Sandy Clay, Silty Clay, Clay

F

1.7

2.1

2.4

2.4

1.7

2.4

2.7

2.7

2.1

2.4

2.7

2.7

2.4

3.1

3.4

3.4

P

1.2

1.5

1.8

1.8

1.3

1.7

1.9

1.9

1.5

1.7

2.1

2.1

1.7

2.1

2.4

2.4

VP

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Table III- 34. LLR based on permeability or percolation rate (IG/day/ft.)



KFS (MM/DAY)


PERCOLATION RATE (MIN/INCH)

SLOPE 0 TO < 5%

SLOPE 5 TO < 10%

SLOPE 10% TO < 15%

SLOPE ≥ 15%

(IN) SOIL DEPTH BELOW INFILTRATIVE SURFACE

(IN) SOIL DEPTH BELOW INFILTRATIVE SURFACE

(IN) SOIL DEPTH BELOW INFILTRATIVE SURFACE

(IN) SOIL DEPTH BELOW INFILTRATIVE SURFACE

10 –

18

18 –

24

24 –

36

≥ 36

10 –

18

18 –

24

24 –

36

≥ 36

10 –

18

18 –

24

24 –

36

≥ 36

10 –

18

18 –

24

24 –

36

≥ 36

  • 17,000

< 0.5

10.1

17.5

22.8

26.9

19.5

26.9

26.9

26.9

26.9

26.9

26.9

26.9

26.9

26.9

26.9

26.9

8000-17000

0.5 – 1.0

5.7

9.4

12.1

16.8

10.1

16.8

22.2

26.9

17.5

26.9

26.9

26.9

24.2

26.9

26.9

26.9

4000 – 8000

1 – 2

3.4

5.4

7.4

9.4

5.4

9.4

12.1

16.8

9.4

16.1

20.8

26.9

13.5

22.2

26.9

26.9

2000 – 4000

2 – 4

3.1

3.7

4.7

6.1

3.7

5.7

7.4

10.1

6.1

9.4

12.1

16.1

8.1

12.8

16.1

22.8

1000 - 2000

4 – 7.5

3.1

3.7

4.7

4.7

3.4

4.1

5.1

6.1

4.1

6.1

7.4

9.4

5.4

8.1

10.1

13.5

550 – 1,000

7.5 – 15

3.1

3.7

4.7

4.7

3.4

4.1

5.1

5.1

4.1

5.1

6.1

6.8

5.1

6.1

7.4

8.8

300 - 550

15 – 30

2.7

3.1

3.7

3.7

3.1

3.4

3.7

4.1

3.4

3.7

4.1

4.4

4.1

4.4

5.1

5.4

150 – 300

30 – 60

2.1

2.4

2.7

2.7

2.4

2.7

3.1

3.1

2.4

3.1

3.4

3.7

3.1

3.4

4.1

4.4

75 – 150

60 – 120

1.7

2.1

2.4

2.4

1.7

2.4

2.7

2.7

2.1

2.4

2.7

2.7

2.4

3.1

3.4

3.4

< 75

  • 120

NA


III- 8.7 Septic tank projected pump out intervals

Table III- 35 provides likely pump out intervals for septic or trash tanks. However, regular monitoring of the scum and sludge levels is the best way to determine a pump out frequency for a specific installation.

As some digestion of sludge and reduction of sludge volume occurs after approximately three years, it is not appropriate to pump out tanks when sludge/scum accumulations do not need pump out.

Table III- 35. Estimated Septic Tank Pumping Frequencies in Years


TANK VOLUME (LITRES)

TANK VOLUME (IMP. GAL.)

HOUSEHOLD OCCUPANCY (NUMBER OF PEOPLE)

2

4

6

8

10

12

PUMPING FREQUENCY IN YEARS

2,300

500

8.0

2.9

1.6

1.0

0.7

0.6

2,700

600

10.5

3.7

2.1

1.3

1.0

0.7

3,405

750

14.6

5.2

2.9

1.9

1.3

1.0

4,100

900


6.8

3.7

2.4

1.8

1.3

4,500

1,000


8.0

4.4

2.9

2.1

1.6

5,000

1,100


9.2

5.0

3.3

2.4

1.8

5,900

1,300


11.8

6.5

4.2

3.0

2.3

6,800

1,500



8.0

5.2

3.7

2.9

7,300

1,600



8.8

5.7

4.1

3.1

Notes:


III- 8.8 Pressure distribution system information

III- 8.8.1 OPTIONS FOR PREVENTING DRAIN DOWN OF UPPER TO LOWER LATERALS ON SLOPING SITES

On sloping sites, prevent effluent draining from higher laterals to lower laterals after a dose. Ensure that all laterals operate at equal flow per basal area. See the schematic diagrams below for strategies.

Figure III- 31. Tee to Tee Manifold, with Check Valves.

Note: Check valves should be installed with unions and access boxes for service.

This technique can also be used with the laterals dipping from the manifold connection tee to the lateral trench. If the dip is sufficient, this will prevent upper laterals siphoning down to the lower laterals. In this case the check valves will not be needed. This also allows a good undisturbed soil dam to be left between the manifold and lateral trenches.

Prevent effluent concentrating in the manifold or force main trenches.

Figure III- 32. Cross Manifold, with Check Valves.

Figure III- 33. Short Upslope Header Manifold, with Feeder Pipes to Laterals.

Note: Header location will prevent siphoning.

When selecting a size for the feeder pipe, account for head losses. Small feeder pipes will reduce the problem of feeder pipe drain down. Sufficient slope could compensate for head losses.

To compensate for excess flow to lower laterals (due to feeder pipes), squirt height could be adjusted based on careful design. During commissioning, this could be tested by collecting and measuring the volume dosed at each lateral’s test orifice.

Attention should be paid to prevent effluent concentrating in the feeder line trench.

Figure III- 34. Short Downslope Header Manifold, with Check Valves.

Where check valves are used, these should be accessible for service. The check valves should be installed with unions, to permit maintenance and repair.

  1. 8.9 Sand mound installation instructions

    The following is a step by step procedure for mound system construction that has been tried and proven. Other techniques may also work satisfactorily, but the basic principles of mound system planning, construction and operation should not be violated.

    1. Check the moisture content of the soil at 20 cm depth. If it is too wet, smearing and compaction will result, reducing the infiltration capacity of the soil. Soil moisture can be determined by rolling a soil sample between the hands. If it rolls into a wire, the site is too wet to prepare. If it crumbles, site preparation can proceed. If the site is too wet to prepare, do not proceed until the soil moisture decreases—THIS IS ESSENTIAL. Consider the receiving area as well as the mound area to ensure that there is no negative impact to the receiving area.

    2. Stake out the mound area on the site according to the system design, so the infiltration bed runs parallel to the contours. Reference stakes offset from the corner stakes are recommended in case corner stakes are disturbed during construction. If the site conditions do not allow for layout according to the approved design, contact the system planner or designer.

    3. Measure the average ground elevation along the upslope edge of the bed or the upper trench and reference this to a benchmark for future use. This is used to determine the bottom elevation of the bed.

    4. Determine where the pipe from the pump chamber connects to the distribution system in the filter media. The location and size of this transport pipe is determined from the pressure distribution guideline.

    5. Trench and lay the effluent pipe from the pump chamber to the mound. Cut and cap the pipe one-foot beneath the ground surface. Lay pipe below frost line or sloping uniformly back to the pump chamber so that it drains after dosing.

    6. Backfill and compact the soil around the pipe to prevent effluent seeping back along the pipe. Backfill around the pipe before plowing, to avoid compacting and disturbing of the ground surface. Consider placing a bentonite or other clay trench dam.

    7. Cut trees to ground level, remove excess vegetation by mowing. Rake cut vegetation if it is, or will become, matted. Prepare the site using a spring-loaded agricultural chisel plow and plowing parallel to contours. Note for sand or gravel soils, may wish to reduce disturbance in order to retain lower permeability surface layer, take care to avoid breakout and use surface layer for basal loading rate check. If there is a compacted soil layer such as a plow pan, consider deep ripping to loosen this layer.

      The function of this preparation is to provide a cleared ground surface with a series of vertical channels to enhance transfer of moisture from the sand fill to the original soil, while inhibiting lateral movement at the sand-soil interface. In addition the vertical furrows aid in stabilizing the sand at the sand-soil interface in an inter-locking fashion.

      The site should be plowed using a spring loaded agricultural chisel plow, or other acceptable apparatus or method to prepare the soil before constructing the mound system. Shallow hand spading the surface is also an acceptable alternative and may be the preferred method on some sites. Rototilling is not an acceptable substitute. Do not compact the infiltrative area.

      The important point is that a rough, un-smeared surface should be left, especially in fine textured soils. Careful observation is required to assure that the soil moisture content is not so high that the soil surface is smeared by the action of the plow. Plowing should not proceed until the soil is sufficiently dry so as not to smear in the plowing process.

      Any sod layer should be broken up, yet the topsoil should not be pulverized. The objective of this step is to break up any surface mat that could impede the vertical flow of liquid into the native soil.

      Immediate construction after plowing is desirable. Avoid rutting and compaction of the plowed area by traffic. If it rains after the plowing is completed, wait until the soil dries out before continuing construction.

    8. Reset the corner stakes, if necessary, using the offset reference stakes and locate the bed or trench areas by staking their boundaries. Extend the transport pipe from the pump chamber (which had previously been cut off) to several feet above the ground surface.

    9. Install one or more standpipes (basal area observation ports). Use 4-inch PVC, with the bottom 12 inches perforated, with rebar to stabilize the pipe, and with gravel around the perforations. Use at least one standpipe in the downslope portion of the mound, with the bottom at the original ground surface, and the top extending above final grade where it can be capped. The maintenance provider can use these standpipes to observe water levels.

    10. Place the filter media that has been properly selected around the edge of the plowed area. Keep the wheels of trucks off plowed areas. Avoid traffic on the downslope side of the mound system. Work from the end and upslope sides. This will avoid compacting the soils on the downslope side, which, if compacted, would affect lateral movement away from the mound and could cause surface seepage at the toe of the mound.

    11. Move the filter media into place using a small track-type tractor with a blade, an excavator or a slinger. Do not use a tractor/backhoe having rubber-tired wheels. Always keep a minimum of 6 inches of filter media beneath tracks to prevent compaction of the natural soil. Ensure placed sand is settled to a uniform density of approximately 1.3 to 1.4 g/cm3 (81.2 to 87.4 lb./ft3). Do not over compact the sand.

    12. Place the filter media to the required depth, i.e., to the top of the bed. Shape sides to the desired slope.

    13. With the blade of the tractor form the infiltration bed. Hand level the bottom of the bed to within ½ inch.

    14. Place the pea gravel in the bed. Level the aggregate to the design depth. Ensure the side separation from bed to surface exposure will be obtained.

    15. Place the distribution pipes, as determined from the pressure distribution guidelines, on the aggregate. Connect the manifold to the transport pipe. Slope the manifold to the transport pipe. Lay the laterals level, removing rises and dips.

    16. Pressure test the distribution system for uniformity of flow.

    17. Place 2 in. of aggregate (pea gravel) over the distribution pipe.

    18. An approved geotextile material may be placed over the aggregate, however, increasing concerns of geotextile plugging with root mat have led to some practitioners discontinuing use of the fabric. If using no geotextile use a layer of Clean Coarse Sand between the bed and the soil cap material, or a layer of birds eye gravel then a layer of Clean Coarse Sand.

    19. Place the soil for the cap and topsoil on the top of the bed. This may be a subsoil or a topsoil. A depth after settling of 12 inches in the center and 6 inches at the outer edge of the bed is desired. This creates a slope that assists the surface run-off of precipitation. Also, this layer provides some frost protection. Do not drive over the top of the bed as the distribution system may be damaged. Use sandy loam, loamy sand soil, ensure oxygen can get in. If landscaping requires shallow slopes, ensure positive drainage from mound surface. With infiltrators installed as a single lateral (e.g. 36″ wide) the soil cap may follow the upper curve of the infiltrator chamber, however, ensure the side vents are covered with Clean Coarse Sand and that the bed to surface separation is adhered to.

    20. Seed or sod the mound system.

    21. Protect the receiving area for a minimum of 7.5 m downslope from the toe of the mound against disturbance and compaction; vegetate to enhance evapotranspiration in the area.


III- 8.10 Sand lined trench/bed diagrams

In all cases the diagrams show schematic sections of trenches, sand lined beds are simply wider trenches. These diagrams are adapted from the Washington State RS&G for sand lined trenches and beds.

Figure III- 35. Sand lined trench



Figure III- 36. Sand lined trench reaching permeable soils at depth


Figure III- 37. Sand lined trench on highly permeable soil, showing membrane to prevent short circuiting at bed edges


Figure III- 38. Sand lined trench on highly permeable soil, showing sand layer to prevent short circuiting at bed edges


Figure III- 39. Bottomless sand filter




SEWERAGE SYSTEM

STANDARD PRACTICE MANUAL

VOLUME IV - RATIONALE

VERSION 3 SEPTEMBER 2014

HEALTH PROTECTION BRANCH

MINISTRY OF HEALTH

Volume IV Table of Contents

    1. Performance context V-1

      IV- 2.1 Performance statements ................................................................................................................... IV-1

      IV- 2.2 Performance requirements and objectives .................................................................................. IV-1

      IV- 2.2.1 Performance requirements ..................................................................................................................... IV-1

      IV- 2.2.2 Performance objectives and application ........................................................................................... IV-1

    2. FORMS OF RATIONALE ................................................................................................................................ IV-4 IV- 4 RATIONALE FOR SELECTION OF MINIMUM STANDARDS ................................................................................ IV-4

    1. RATIONALE FOR DESIGN STANDARDS.......................................................................................................... IV-5

      IV- 5.1 Priority for soil treatment ................................................................................................................ IV-5

      IV- 5.2 Soils and site evaluation................................................................................................................... IV-5

      IV- 5.2.1 Soil structure and consistence categories ........................................................................................ IV-5

      IV- 5.3 System selection standards ............................................................................................................. IV-6

      IV- 5.3.1 Simpler solutions and options prioritized......................................................................................... IV-6

      IV- 5.3.2 Limitation on standards, professional reliance ............................................................................... IV-7 IV- 5.3.3 Treatment system selection.................................................................................................................... IV-7

      IV- 5.3.4 Site capability and dispersal system summary tables .................................................................. IV-7 IV- 5.3.5 Dispersal system limitations ................................................................................................................... IV-7

      IV- 5.4 Design flow .........................................................................................................................................IV-10

      IV- 5.4.1 Residential Daily Design Flow (DDF) .................................................................................................IV-10

      IV- 5.4.2 Daily Design Flows for non-residential buildings ........................................................................IV-12

      IV- 5.5 Sewage and Type 1 effluent parameters .....................................................................................IV-12

      IV- 5.6 Soil treatment performance ...........................................................................................................IV-13

      IV- 5.6.1 Interlinked factors.....................................................................................................................................IV-13

      IV- 5.6.2 Standards development .........................................................................................................................IV-13

      IV- 5.7 Dosing ..................................................................................................................................................IV-18

      IV- 5.8 Vertical separation ........................................................................................................................... IV-20

      IV- 5.8.1 Long term maintenance of vertical separation .............................................................................IV-20

      IV- 5.9 Horizontal separation ......................................................................................................................IV-21

      IV- 5.9.1 System type and horizontal separation ...........................................................................................IV-21

      IV- 5.9.2 Phosphorous attenuation ......................................................................................................................IV-22

      IV- 5.9.3 Risk management for tanks ..................................................................................................................IV-22

      IV- 5.10 Hydraulic Loading Rate .................................................................................................................. IV-23

      IV- 5.10.1 HLR tables ....................................................................................................................................................IV-23

      IV- 5.10.2 Consideration of LTAR and contaminant attenuation ...............................................................IV-23 IV- 5.10.3 Aerobic infiltrative surface ....................................................................................................................IV-23

      IV- 5.10.4 Development of hydraulic loading rate (HLR) values.................................................................IV-23

      IV- 5.10.5 Depth range for application of HLR V-25

      IV- 5.10.6 Subsurface Drip Dispersal HLR ............................................................................................................IV-25

      IV- 5.10.7 HLR affected by sodium and salinity.................................................................................................IV-26

      IV- 5.10.8 Risk management and methods for HLR selection .....................................................................IV-26

      IV- 5.11 System minimum contour length and Linear Loading Rates ............................................... IV-26

      IV- 5.11.1 Minimum system contour length .......................................................................................................IV-27

      IV- 5.11.2 LLR table values .........................................................................................................................................IV-27 IV- 5.11.3 System width, soil type and oxygen transport..............................................................................IV-27

    2. SPECIFICATION AND INSTALLATION STANDARDS........................................................................................IV-29

    3. MAINTENANCE AND MONITORING............................................................................................................IV-29

    4. DESIGN MANUALS AND OTHER REFERENCES ..............................................................................................IV-30

IV- 8.1.1 Design manuals .........................................................................................................................................IV-30

  1. 8.1.2 Bibliography ................................................................................................................................................IV-30

    Volume IV Rationale

    1. INTRODUCTION

This volume is intended to be used for background information and reference, for information only. This volume does not contain standards or guidelines that APs are expected to follow or consider. It states the performance basis for the standards in Volume II, and summarizes the rationale for the design standards.

This volume includes rationale for some of the treatment and dispersal methods, in particular, those that are less common. It does not include rationale for commonly-used and well established methods or equipment such as septic tanks or infiltration trenches.

In this volume, technical terms are used and concepts mentioned which may not be familiar to the reader. For background reading refer to the USEPA manual (Otis et al. 2002); also see general references in Section IV- 8.

IV- 2 PERFORMANCE CONTEXT

IV- 2.1 Performance statements

The Sewerage System Regulation (SSR) provides a base performance statement, requiring that sewerage systems be constructed with the result of not causing or contributing to a health hazard.

A “health hazard” is defined as the discharge of domestic sewage or effluent into a source of drinking water, surface waters, tidal water, a sewerage system that is not capable of containing or treating domestic sewage, or onto land. A “health hazard” also includes the proposed construction or maintenance of a sewerage system which may, in the opinion of a Health Officer, cause a health hazard.

This Manual is intended to:

IV- 5.10 Hydraulic Loading Rate

This discussion refers to standards in Section II-5.5 and guidelines in Section III-5.5.


IV- 5.10.1 HLR TABLES

Long Term Acceptance Rates (LTAR) which can support sustainable systems (with a system life of 35 years or more) were used as the initial basis for HLR selection. LTAR is the stable equilibrium rate at which an effluent of particular strength can be applied to a particular soil using a particular system configuration and process.


IV- 5.10.2 CONSIDERATION OF LTAR AND CONTAMINANT ATTENUATION

HLR standards need to consider contamination attenuation (particularly pathogen attenuation) as well as simple disposal of effluent. See Section IV- 5.6for discussion of contamination attenuation and Sections IV-

5.6.2 & IV- 5.6.2.2 for principles and approaches used when considering HLR.

This dualistic approach will increase system life and improve performance and is considered to be the standard approach for modern onsite sewerage system design (Rule Development Committee 2002).


IV- 5.10.3 AEROBIC INFILTRATIVE SURFACE

Modern HLR standards are based on maintenance of generally unsaturated and aerobic conditions rather than a “deeply ponded infiltration surface” approach. The rationale for this choice is to increase system life and to improve pathogen and contaminant removal reliability.

This approach results in somewhat lower “aerobic” Long Term Acceptance Rates (LTAR) than for ponded conditions and also has implications for distribution and dosing.

Dosing to the infiltrative surface promotes increased aerobic LTAR, as long as the HLR is low enough. If the HLR is raised to the point where the infiltrative surface will be ponded, for at least part of the time, then the dosing will have a limited effect on LTAR (Hargett, Tyler, and Siegrist 1981).


IV- 5.10.4 DEVELOPMENT OF HYDRAULIC LOADING RATE (HLR) VALUES


IV- 5.10.4.1 Conceptual approach

Development of HLR standards in this manual was based on five main concepts:


IV- 8.1.2 BIBLIOGRAPHY

Abit, Sergio M., Aziz Amoozegar, Michael J. Vepraskas, and Christopher P. Niewoehner. 2008. “Solute Transport in the Capillary Fringe and Shallow Groundwater: Field Evaluation.” Vadose Zone Journal 7

(3): 890. doi:10.2136/vzj2007.0102.

Adam Olivieri, and Robert Roche. 1979. “Minimum Guidelines for the Control of Individual Wastewater Treatment & Disposal Systems”. STATE OF CALIFORNIA CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD SAN FRANCISCO BAY REGION.

Amoozegar, A. 1997. “Comparison of Saturated Hydraulic Conductivity and Percolation Rate: Implications for Designing Septic Systems.” Site Characterization and Design of On-Site Septic Systems, 129.

———. 1998. “Impact of Wastewater Quality on the Long-Term Acceptance Rate of Soils for on-Site Wastewater Disposal Systems.”

Amoozegar, A., C. P. Niewoehner, and D. L. Lindbo. 2006. “Lateral Movement of Water in the Capillary Fringe under Drainfields.” In Proc. 2006 Tech. Educ. Conf., Denver, Co, 27–31.

Arthur, J. P., and Banco Mundial. 1983. “Notes on the Design and Operation of Waste Stabilization Ponds in Warm Climates of Developing Countries.” BIRF Technical Paper 7.

AS/NZS. 2000. “AS/NZS 1547:2000 On-Site Domestic Wastewater Management.”

Azadpour-Keeley, Ann, Barton R. Faulkner, and Jin-Song Chen. 2003. “Movement and Longevity of Viruses in the Subsurface”. USEPA.

Ball, E. S, H. L Ball, J. L Ball, and T. R Bounds. 2004. “Watertight Septic Tanks: No More Excuses.”

Beal, CD, EA Gardner, and NW Menzies. 2005. “Process, Performance, and Pollution Potential: A Review of Septic Tank–soil Absorption Systems.” Soil Research 43 (7): 781–802.

Berkowitz, Brian, Stephen E. Silliman, and Andrea M. Dunn. 2004. “Impact of the Capillary Fringe on Local Flow, Chemical Migration, and Microbiology.” Vadose Zone Journal 3 (2): 534–48. doi:10.2113/3.2.534.

Blasing, E. M., and J. C. Converse. 2004. “Effluent Quality in Saturated Mound and Modified Mound Toes Receiving Septic Tank or Aerobically Treated Domestic Wastewater.” In Proceedings of the Tenth International Symposium on Individual and Small Community Sewage Systems, American Society of Agricultural Engineers, 323–35.

Bohrer, R. M., and J. C. Converse. “Soil Treatment Performance and Cold Weather Operations of Drip Distribution Systems.”

Boulding, J. R. 1994. Description and Sampling of Contaminated Soils: A Field Guide. CRC.

Bouma, J., A. Jongerius, O. Boersma, A. Jager, and D. Schoonderbeek. 1977. “The Function of Different Types of Macropores During Saturated Flow through Four Swelling Soil Horizons.” Soil Science Society of America Journal 41 (5): 945–50. doi:10.2136/sssaj1977.03615995004100050028x.

Bouma, J., and W. Ziebell. 1972. “Soil Absorption of Septic Tank Effluent: A Field Study of Some Major Soils in Wisconsin.”

Bouma, J. 1977. “Subsurface Application of Sewage Effluents.” In Planning the Use and Management of Land.

American Society of Agronomy.

Bradbury, Kenneth R., Mark A. Borchardt, Madeline Gotkowitz, Susan K. Spencer, Jun Zhu, and Randall J. Hunt. 2013. “Source and Transport of Human Enteric Viruses in Deep Municipal Water Supply Wells.” Environmental Science & Technology 47 (9): 4096–4103.

British Water. 2009. “Code of Practice, Flows and Loads - 3 Sizing Criteria, Treatment Capacity for Sewage Treatment Systems”. British Water.

Burt, Rebecca. 2009. Soil Survey Field and Laboratory Methods Manual. National Soil Survey Center, Natural Resources Conservation Service, US Department of Agriculture.

Clark, H. W., and S. D. M. Gage. 1909. A Review of Twenty-One Years’ Experiments upon the Purification of Sewage at the Lawrence Experiment Station. Wright & Potter, Printing Co., State Printers.

Converse, J. C, M. E. Kean, E. J. Tyler, and J. O. Peterson. 1991. “Bacterial and Nutrient Removal in Wisconsin at-Grade on-Site Systems.” In On-Site Wastewater Treatment. Proceedings of the Sixth National Symposium on Individual and Small Community Sewage Systems. ASAE, St. Joseph, MI, 46–61.

Converse, J. C, and E. J Tyler. 1998a. “Soil Treatment of Aerobically Treated Domestic Wastewater with Emphasis on Modified Mounds.” In Eighth National Symposium on Individual and Small Community Sewage Systems.

Converse, J. C. 1974. “Distribution of Domestic Waste Effluent in Soil Absorption Beds.” Trans, of ASAE 17: 299–304.

———. 2004. “Effluent Quality from ATUs and Packed Bed Filters Receiving Domestic Wastewater under Field Conditions.” In Proceedings of the 10 thNational Symposium on Individual and Small Sewage Systems.

Converse, J. C., J.L. Anderson, W.A. Ziebell, and J. Bouma. 1974. Pressure Distribution to Improve Soil Absorption Systems. Small Scale Waste Management Project, University of Wisconsin.

Converse, J. C., and E. J. Tyler. 1998b. “Soil Dispersal of Highly Pretreated Effluent–Considerations for Incorporation into Code.” In Proceedings: Seventh Annual Conference and Exhibit.

Converse, J.C., E.J. Tyler, and Small Scale Waste Management Project (Wis.). 1990. Wisconsin Mound Soil Absorption System Siting, Design and Construction Manual. Small Scale Waste Management Project, School of Natural Resources, College of Agricultural and Life Sciences, University of Wisconsin- Madison.

Converse, James C., and Matthew M. Converse. 1998. “Pump Chamber Effluent Quality Following Aerobic Units and Sand Filters Serving Residences.” In Proceedings of the Eighth National Symposium on Individual and Small Community Sewage Systems.

Converse, M. M., J. C. Converse, and E. J. Tyler. 1999. “Sand Filter Evaluation in a Northern Climate.” In National Onsite Wastewater Recycling Association 8 thAnnual Conference & Exposition Proceedings: NOWRA… New Ideas for a New Millennium, 201–10.

Corbitt, Robert A. 2004. Standard Handbook of Environmental Engineering. 2 nd. McGraw-Hill, New York. Coulter, J. B., and T. W. Bendixen. 1958. “Effectiveness of the Distribution Box.” Report to the Federal Housing

Administration from US Public Health Service.

Crites, R., and G. Tchobanoglous. 1998. Small and Decentralized Wastewater Management Systems.

WCB/McGraw-Hill Boston.

Crites, Ronald W., Sherwood C. Reed, and E. Joe Middlebrooks. 2006. Natural Wastewater Treatment Systems.

CRC Press.

CSA Group. 2012. CSA B65. CSA.

Cuyk, S. Van, R. Siegrist, A. Logan, S. Masson, E. Fischer, and L. Figueroa. 2001. “Hydraulic and Purification Behaviors and Their Interactions during Wastewater Treatment in Soil Infiltration Systems.” Water Research 35 (4): 953–64. doi:10.1016/S0043-1354(00)00349-3.

D. Burns, G. Farqhuar, M. Mills, and A. Williams. 2005. Field Description Of Soil And Rock Guideline For The Field Classification And Description Of Soil And Rock For Engineering Purposes. NZ Geotechnical Society.

D. L. Lindbo et al. 2007. “Applying Soil Morphology to Long Term Acceptance Rate Determination.” In Eleventh Individual and Small Community Sewage Systems Conference Proceedings, (20-24 October 2007, Warwick, Rhode Island, USA) Editor K.M. Mancl. St. Joseph, Michigan ASABE. ,20 October 2007. ASABE.

D. L. Lindbo, M. J. Vepraskas, E. Severson, and X. He. 2013. “A Comparison Of Soil Wetness By Morphological And Modeling Methods.” In American Society of Agricultural and Biological Engineers. Accessed December 30. doi:10.13031/2013.15760.

Dakers, A., D. Lees, R. Cullen, and G. Meyer-Hubbert. 2004. “Impact of Tourism on Water and Wastewater Services in Small Towns.” In Print for the 46 Th Annual NZ Water and Waste Association (NZWWA) Conference, 6–8.

Darby, J., G. Tchobanoglous, M. Asri Nor, and D. Maciolek. 1996. “Shallow Intermittent Sand Filtration: Performance Evaluation.” Small Flows Journal 2 (1): 3–15.

Dawes, L., and A. Goonetilleke. 2003. “An Investigation into the Role of Site and Soil Characteristics in Onsite Sewage Treatment.” Environmental Geology 44 (4): 467–77.

Dziegielewski, B. 2000. Commercial and Institutional End Uses of Water. Amer Water Works Assn. Eberhard Roeder, David Bloomquist, and Paul Booher. 2007. Determination of Limits to Biological Loading

Rate in Column Experiments with Florida Sandy Soils. ASABE.

Emerick, R. W., J. Manning, G. Tchobanoglous, and J. L. Darby. 1999. “Impact of Bacteria and Dosing Frequency on the Removal of Virus within Intermittently Dosed Biological Filters.” Small Flows Quarterly 1 (1): 36–41.

Emerick, R. W., R. M. Test, G. Tchobanoglous, and J. Darby. 1997. “Shallow Intermittent Sand Filtration: Microorganisms Removal.” Small Flows Journal 3 (1): 12–22.

EPRI, and TVA. 2004. Wastewater Subsurface Drip Distribution, Peer-Reviewed Guidelines for Design, Operation, and Maintenance. EPRI, and Tennessee Valley Authority.

Feachem, Richard G, David J Bradley, Hemda Garelick, and D. Duncan Mara. 1983. “Sanitation and Disease: Health Aspects of Excreta and Wastewater Management.” 1. http://go.worldbank.org/ZS7F3M9XG1.

Feng Jiang and Amanda Worthington. 2005. “Recommendations for Improving Fecal Coliform Pollution Control in Gwinnett County, Georgia.” Upper Altamaha Practicum Course Prepared by: Feng Jiang and Amanda Worthington.

Flaten, D., D. Snelgrove, I. Halket, K. Buckley, G. Penn, W. Akinremi, B. Wiebe, and E. Tyrchniewicz. 2003. “Acceptable Phosphorus Concentrations in Soils and Impact on the Risk of Phosphorus Transfer from Manure Amended Soils to Surface Waters.” Review of Literature for the Manitoba Livestock Manure Management Initiative. Available Online at Http://www. Manure. Mb. ca/projects/completed/pdf/02- Hers-01. Pdf (verified 25/04/2006).

Flury, M., H. Flühler, W. A. Jury, and J. Leuenberger. 1994. “Susceptibility of Soils to Preferential Flow of Water: A Field Study.” Water Resources Research 30 (7): 1945–54.

George, Isabelle, Philippe Crop, and Pierre Servais. 2002. “Fecal Coliform Removal in Wastewater Treatment Plants Studied by Plate Counts and Enzymatic Methods.” Water Research 36 (10): 2607–17.

Geyer, John C., and John J. Lentz. 1966. “An Evaluation of the Problems of Sanitary Sewer System Design.”

Journal (Water Pollution Control Federation), 1138–47.

Gill, L., T. Patel, and N. O’Luanaigh. 2007. “A Comparison Between Distribution Devices Used to Split On-Site Wastewater Effluent Between Percolation Trenches.” In .

Gill, L. W., C. O’Sulleabhain, B. D. R. Misstear, and P. J. Johnston. 2007. “The Treatment Performance of Different Subsoils in Ireland Receiving On-Site Wastewater Effluent.” J Environ Qual 36 (6): 1843–55. doi:10.2134/jeq2007.0064.

Gill, L.W., N. O’Luanaigh, P.M. Johnston, B.D.R. Misstear, and C. O’Suilleabhain. 2009. “Nutrient Loading on Subsoils from on-Site Wastewater Effluent, Comparing Septic Tank and Secondary Treatment Systems.” Water Research 43 (10): 2739–49. doi:10.1016/j.watres.2009.03.024.

Gillham, R.W. 1984. “The Capillary Fringe and Its Effect on Water-Table Response.” Journal of Hydrology 67 (1–4): 307–24. doi:10.1016/0022-1694(84)90248-8.

Gössling, Stefan, Paul Peeters, C. Michael Hall, Jean-Paul Ceron, Ghislain Dubois, La Vergne Lehmann, and Daniel Scott. 2012. “Tourism and Water Use: Supply, Demand, and Security. An International Review.” Tourism Management 33 (1): 1–15. doi:10.1016/j.tourman.2011.03.015.

Graves, A. K., C. Hagedorn, A. Teetor, M. Mahal, A. M. Booth, and R. B. Reneau. 2002. Antibiotic Resistance Profiles to Determine Sources of Fecal Contamination in a Rural Virginia Watershed. Am Soc Agronom.

GWMAP. 1999. Effects of Septic Systems on Ground Water Quality - Baxter, Minnesota. Minnesota Pollution Control Agency (Ground Water Monitoring and Assessment Program).

Hargett, D. L., E. J. Tyler, and R. L. Siegrist. 1981. Soil Infiltration Capacity as Affected by Septic Tank Effluent Application Strategies. Small Scale Waste Management Project, University of Wisconsin--Extension.

Harman, J., W. D. Robertson, J. A. Cherry, and L. Zanini. 1996. “Impacts on a Sand Aquifer from an Old Septic System: Nitrate and Phosphate.” Ground Water 34 (6): 1105–14.

Hart, K. S, B. D Lee, P. J Schoeneberger, D. P Franzmeier, P. R Owens, and D. R Smith. 2008. “Comparison of Field Measured Soil Absorption Field Loading Rates and Loading Rates Estimated from Soil Morphologic Properties.” Journal of Hydrologic Engineering 13: 665.

Hassan, G., R. B. Reneau, and C. Hagedorn. 2008. “On-Site Waste Treatment and Disposal by Sequencing Batch Reactor-Drip Irrigation: Effluent Distribution and Solute Transport.” Communications in Soil Science & Plant Analysis 39 (1/2): 141–57. doi:10.1080/00103620701759095.

Health Canada. 2012. “Guidelines for Canadian Recreational Water Quality”. Health Canada. http://www.hc- sc.gc.ca/ewh-semt/pubs/water-eau/guide_water-2012-guide_eau/index-eng.php.

Helmer, Richard, Ivanildo Hespanhol, Water Supply, Sanitation Collaborative Council, C. Gleeson, N. Gray, and

E. B. Welch. 1997. Water Pollution Control: A Guide to the Use of Water Quality Management Principles. E & FN Spon Great Britain.

Humphrey J, C.P., and M.A. O`Driscoll. 2011. “Evaluation of Soil Colors as Indicators of the Seasonal High Water Table in Coastal North Carolina.” International Journal of Soil Science 6 (2): 103–13. doi:10.3923/ijss.2011.103.113.

Hunt, Randall J., Mark A. Borchardt, and Kenneth R. Bradbury. 2014. “Viruses as Groundwater Tracers: Using Ecohydrology to Characterize Short Travel Times in Aquifers.” Groundwater 52 (2): 187–93.

Huntzinger Beach, D. N. H., and J. E. McCray. 2003. “Numerical Modeling of Unsaturated Flow in Wastewater Soil Absorption Systems.” Ground Water Monitoring and Remediation 23 (2): 64–72.

J. Bouma, C. Belmans, L. W. Dekker and W. J. M. Jeurissen. 1983. “Assessing the Suitability of Soils With Macropores for Subsurface Liquid Waste Disposal.” J. Environ. Qual. 12: 305-311.

J. P. Williams, D. L. Lindbo, and M. J. Vepraskas. 2013. “A Suggested Water Table Monitoring Method Based On Soil Color Patterns.” In American Society of Agricultural and Biological Engineers. Accessed December 30. doi:10.13031/2013.6081.

J.M. Mauskar. 20008. Performance of Sewage Treatment Plants - Coliform Reduction. Central Pollution Control Board Ministry of Environment & Forests, Govt. of India.

Janna, William S. 2007. “Conduction Shape Factor Method Applied to the Modeling of Oxygen Diffusion Through Soil.” In Eleventh Individual and Small Community Sewage Systems Conference Proceedings, 20-24 October 2007, Warwick, Rhode Island 701P1107cd.

Jenssen, P. D., and R. L. Siegrist. 1991. “Integrated Loading Rate Determination for Wastewater Infiltration System Sizing.” In , Size: Pages: (10 p). United States. http://www.osti.gov/energycitations/servlets/purl/5052357-t7MQnV/.

K. Snodgrass. 2007. Water Use in Forest Service Recreation Areas: Guidelines for Water System Designers. Department of Agriculture, Forest Service,.

Kai Lipsius. 2002. “Estimating Available Water Capacity from Basic Soil Physical Properties -A Comparison of Common Pedotransfer Functions”. Braunschweig Technical University.

Kaplan, O. B. 1991. Septic Systems Handbook. CRC Press.

Kenney, T. C., D. Lau, and G. I. Ofoegbu. 1984. “Permeability of Compacted Granular Materials.” Canadian Geotechnical Journal 21 (4): 726–29.

Khan, Muhammad Yunus, Don Kirkham, and R. L. Handy. 1976. “Shapes of Steady State Perched Groundwater Mounds.” Water Resources Research 12 (3): 429. doi:10.1029/WR012i003p00429.

Kreissl, J. F. 1978. “Management of Small Waste Flows. Small Scale Waste Management Project, University of Wisconsin, USA.” Environmental.

Kristiansen, Rolv. 1981. “Sand-Filter Trenches for Purification of Septic Tank Effluent: III. The Microflora.” J Environ Qual 10 (3): 361–64.

Laak, R. 1986. Wastewater Engineering Design for Unsewered Areas. Ann Arbor Science Publishers Ann Arbor, Mich.

Laak, R., K. A. Healy, and D. M. Hardisty. 1974. “Rational Basis for Septic Tank System Design a.” Ground Water

12 (6): 348–51.

Lance, J C, and C P Gerba. 1984. “Virus Movement in Soil during Saturated and Unsaturated Flow.” Applied and Environmental Microbiology 47 (2): 335–37.

Lesikar, B. A., and S. D. Pillai. 2003. Removal and Fate of Specific Microbial Pathogens within On-Site Wastewater Treatment Systems. Texas Water Resources Institute. http://repositories.tdl.org/twdl- ir/handle/1969.1/6111.

Linaweaver, F. P., United States Fed Housing Admin, and Johns Hopkins University Dept of Sanitary Engineering and Water Resources. 1966. Report V on Phase Two of the Residential Water Use Research Project. John Hopkins University, Department of Sanitary Engineering and Water Resources.

Lowe, K. S. 2007. “Influent Constituent Characteristics of the Modern Waste Stream from Single Sources: Literature Review.”

Lowe, K. S, M. B Tucholke, J. Tomaras, K. E. Conn, C. Hoppe, J. Drewes, J. E McCray, and J. Munakata-Marr.

2009. Influent Constituent Characteristics of the Modern Waste Stream from Single Sources. Iwa.

Mahuta, F., and W. C. Boyle. “Gas Transport in the Unsaturated Zone of Soil Absorptions Systems, December 1991.” In Proceedings of the 6th National Symposium on Individual and Small Community Sewage Systems.

Mancl, K. M., and L. A. Peeples. 1991. “One Hundred Years Later. Reviewing the Work of the Massachusetts State Board of Health on the Intermittent Sand Filtration of Wastewater from Small Communities.” In The 6 Th National Symposium on Individual and Small Community Sewage Systems, Chicago, IL, USA, 12/16-17/91, 22–30.

Mara, Duncan, and Nigel J. Horan. 2003. Handbook of Water and Wastewater Microbiology. Academic press. Matejcek, Brian C. 2000. “Determination of Properties and the Long Term Acceptance Rate of Effluents from Food Service Establishments That Employ Onsite Sewage Treatment”. University of Florida.

Maxfield, Meliss, William E Daniell, Charles D Treser, and Jim VanDerslice. 2003. “Aerobic Residential Onsite Sewage Systems: An Evaluation of Treated-Effluent Quality.” Journal of Environmental Health 66 (3): 14–20; quiz 21–22.

Mayer, P. W, and W. B DeOreo. 1999. Residential End Uses of Water. American Water Works Association. McCarthy, Barbara, Stephen Monson Geerts, Richard Axler, and Jerald Henneck. 2001. Performance of an

Aerobic Treatment Unit and Drip Dispersal System for the Treatment of Domestic Wastewater at the Northeast Regional Correction Center. NRRI Technical Report TR-01/33, Natural Resources Research Institute, University of Minnesota–Duluth.

McCray, J, and Et Al. 2010. “Quantitative Tools to Determine the Expected Performance of Wastewater Soil Treatment Units”. Water Environment Research Foundation.

McCray, J. E., D. N. Huntzinger, S. Van Cuyk, and R. Siegrist. 2000. “Mathematical Modeling of Unsaturated Flow and Transport In Soilbased Wastewater Treatment Systems.”

McDonnell, J. J. 1990. “A Rationale for Old Water Discharge through Macropores in a Steep, Humid Catchment.” Water Resour. Res 26 (11): 2821–32.

Minnesota Pollution Control Agency. 2010. “Design Guidance for Large Subsurface Wastewater Treatment Systems (LSTS)”. Minnesota Pollution Control Agency.

Mokma, D. L., T. L. Loudon, and L. P. Miller. 2001. “Rationale for Shallow Trenches in Soil Treatment Systems.” In , 71–79. American Society of Agricultural Engineers.

Moldrup, P., T. Olesen, P. Schjonning, T. Yamaguchi, and D.E. Rolston. 2000. “Predicting the Gas Diffusion Coefficient in Undisturbed Soil from Soil Water Characteristics.” Soil Sci Soc Am J 64 (1): 94–100.

Motz, E. C., E. Cey, M. C. Ryan, and Angus Chu. 2012. “Vadose Zone Microbial Transport Below At-Grade Distribution of Wastewater Effluent.” Water, Air, & Soil Pollution 223 (2): 771–85. doi:10.1007/s11270- 011-0901-y.

Nova Scotia Environment. 2009. “On-Site Sewage Disposal Systems Technical Guidelines”. Nova Scotia Environment.

NRCS. 1984. Permeability of Selected Clean Sands and Gravels. 9. Soil Mechanics Note. USDA Soil Conservation Service.

Onsite Sewage Treatment Program. 2009. “Manual for Septic System Professionals in Minnesota”. University of Minnesota.

Otis, R. J, J. Kreissl, Frederick, R Goo, P. Casey, and B. Tonning. 2002. Onsite Wastewater Treatment Systems Manual. EPA/625/R-00/008. United States Environmental Protection Agency, Office of Water, Office of Research and Development.

Otis, R. J., J. C. Converse, B. L. Carlile, and J. E. Witty. 1977. “Effluent Distribution.” Home Sewage Treatment.

ASAE Pub, 5–77.

Patel, T., N. O’Luanaigh, and L. W. Gill. 2008. “A Comparison of Gravity Distribution Devices Used in On-Site Domestic Wastewater Treatment Systems.” Water, Air, & Soil Pollution 191 (1): 55–69.

Peeples, J. A. 1991. “Design, Set-Up, and Operation of a Pilot Scale Intermittent Sand Filter-Septic Tank System to Evaluate the Effects of Sand Dep’th and Infiltration Rate on Filter Treatment Efficiency”. The Ohio State University.

Potts, David A., Josef H. Gorres, Erika L. Nicosia, and Jose A. Amador. 2004. “Effects of Aeration on Water Quality from Septic System Leachfields.” J Environ Qual 33 (5): 1828–38.

Pundsack, Jonathan, Richard Axler, Randall Hicks, Jerald Henneck, Delwin Nordman, and Barbara McCarthy. 2001. “Seasonal Pathogen Removal by Alternative on-Site Wastewater Treatment Systems.” Water Environment Research, 204–12.

QSG. 2005. “Planning Guidelines for Water Supply and Sewerage”. Queensland State Government.

R. J. Miles, L. T. West. 2001. “Soil-Based Assessment of Site Suitability for On-Site Wastewater Treatment Systems: A Comparison of Georgia and Missouri Systems.” In . http://asae.frymulti.com/azdez.asp?search=1&JID=1&AID=6069&CID=w2001&v=&i=&T=1.

Radcliffe, D., B. Bumback, S. Udvardy, P. Hartel, L. West, and T. Rasmussen. 2006. Scientific Basis for Bacterial TMDLs in Georgia, A White Paper Submitted to the Georgia Environmental Protection Division to Support the Assimilative Capacity Technical Advisory Committee as Part of the Georgia Statewide Water Planning Process.

Radcliffe, D. E., and L. T. West. 2009. “Design Hydraulic Loading Rates for Onsite Wastewater Systems.”

Vadose Zone Journal 8 (1): 64.

Reneau, R. B. 1978. “Influence of Artificial Drainage on Penetration of Coliform Bacteria from Septic Tank Effluents into Wet Tile Drained Soils.” J Environ Qual 7 (1): 23–30.

RI NEMO. 2008. “A Guide to Monitoring the Depth and Duration of the Seasonal High Water Table in Rhode Island”. University of Rhode Island.

Robert L. Siegrist, Sheila Van Cuyk. 2001. “Wastewater Soil Absorptions Systems: The Performance Effects of Process and Environmental Conditions.” In . http://asae.frymulti.com/abstract.asp?aid=6050&t=1.

Robertson, W. D. 2003. “Enhanced Attenuation of Septic System Phosphate in Noncalcareous Sediments.”

Ground Water 41 (1): 48–56.

Robertson, W. D., S. L. Schiff, and C. J. Ptacek. 1998. “Review of Phosphate Mobility and Persistence in 10 Septic System Plumes.” Ground Water 36 (6): 1000–1010.

Rule Development Committee. 2002. Hydraulic Loading. T-2. Washington State Department of Health, Wastewater Management Program.

Rutledge, E. M., C. L. Griffis, C. R. Mote, C. R. Bell, and D. K. Shoemaker. 1985. “Climate as a Factor in Siting Septic Tank Filter Fields.”

Ryon, H. 1927. Notes on the Design of Sewage Disposal Works, with Special Reference to Small Installations.

S.D. Finch, L.T. West, D.E. Radcliffe, and E.V. Hufstetler. 2007. “Thickness and Hydraulic Properties of Drainfield Trench Biomats Formed in Georgia Soils.” In Eleventh Individual and Small Community Sewage Systems Conference Proceedings, (20-24 October 2007, Warwick, Rhode Island, USA) Editor K.M. Mancl. St. Joseph, Michigan ASABE. ,20 October 2007.

Salvato, Joseph A., Nelson L. Nemerow, and Franklin J. Agardy. 2003. Environmental Engineering. 5th ed.

Wiley.

Saxton, K. E., and W. J. Rawls. 2006. “Soil Water Characteristic Estimates by Texture and Organic Matter for Hydrologic Solutions.” Soil Sci Soc Am J 70 (5): 1569–78. doi:10.2136/sssaj2005.0117.

Schaap, Marcel G., Feike J. Leij, and Martinus Th van Genuchten. 2001. “Rosetta: A Computer Program for Estimating Soil Hydraulic Parameters with Hierarchical Pedotransfer Functions.” Journal of Hydrology 251 (3): 163–76.

Schijven, J., J. Mülschlegel, S. Hassanizadeh, P. Teunis, and A. Husman. 2006. “Determination of Protection Zones for Dutch Groundwater Wells against Virus Contamination-Uncertainty and Sensitivity Analysis.” J Water Health 4: 297–312.

Schijven, Jack F., and S. Majid Hassanizadeh. 2000. “Removal of Viruses by Soil Passage: Overview of Modeling, Processes, and Parameters.” Critical Reviews in Environmental Science and Technology 30

(1): 49–127.

Schoeneberger, Philip J., D. A. Wysocki, E. C. Benham, and Soil survey staff. 2012. Field Book for Describing and Sampling Soils. Version 3.0. National Soil Survey Center, Natural Resources Conservation Service, US Department of Agriculture.

Siegrist, Kathryn Lowe, Mengistu Geza, and John McCray. 2011. “Effluent Dispersal into Soil for Onsite Treatment and Discharge/Reuse”. presented at the Nordic Conference on the State of the Art concerning Soil Treatment Systems, Malmo, Sweden.

Siegrist, R. L., E. J. Tyler, and P. D. Jenssen. 2000. “Design and Performance of Onsite Wastewater Soil Absorption Systems.” In White Paper. Prepared for National Needs Conference, Risk-Based Decision Making Fo Onsite Wastewater Treatment. Washington University. St. Louis, Missouri, 19–20.

Siegrist, Robert L. 1987. “Hydraulic Loading Rates for Soil Absorption Systems Based on Wastewater Quality.” In Chicago: ASAE.

Simon, J. J., and R. B. Reneau. 1987. “Recommended Septic Tank Effluent Loading Rates for Fine-Textured, Structured Soils with Flow Restrictions.” In Proceedings of the Fifth National Symposium on Individual and Small Community Sewage Systems. ASAE.

Sinowski, W., A.C. Scheinost, and K. Auerswald. 1997. “Regionalization of Soil Water Retention Curves in a Highly Variable Soilscape, II. Comparison of Regionalization Procedures Using a Pedotransfer Function.” Geoderma 78 (3–4): 145–59. doi:10.1016/S0016-7061(97)00047-5.

Standridge, Jon, Jeremy Olstadt, and William Sonzogni. 2001. “Passage of Microorganisms in Septic Tank Effluents through Mound Sand in a Controlled Laboratory Environment.” http://digicoll.library.wisc.edu/cgi-bin/EcoNatRes/EcoNatRes- idx?type=header&id=EcoNatRes.StandridgePassage&isize=text.

State of Victoria. 2011. “Practical Note: Soil Colour.” http://vro.dpi.vic.gov.au/dpi/vro/vrosite.nsf/pages/soilhealth_prac_soil_colour.

State of Wisconsin. 1999. “Drip-Line Effluent Dispersal Component Manual for Private Onsite Wastewater Treatment Systems”. State of Wisconsin, Department of Commerce, Division of Safety and Buildings.

Stevik, Tor Kristian, Geir Ausl, Petter Deinboll Jenssen, and Robert L. Siegrist. 1999. “Removal of E. Coli during Intermittent Filtration of Wastewater Effluent as Affected by Dosing Rate and Media Type.” Water Research 33 (9): 2088–98. doi:10.1016/S0043-1354(98)00413-8.

Stevik, Tor Kristian, Geir Ausland, Petter Deinboll Jenssen, and Robert L Siegrist. 1999. “Removal of E. Coli during Intermittent Filtration of Wastewater Effluent as Affected by Dosing Rate and Media Type.” Water Research 33 (9): 2088–98. doi:10.1016/S0043-1354(98)00413-8.

Taylor, C., and J. Y. D. Jones. 1997. “An Evaluation of On-Site Technology in Indiana: A Report to the Indiana State Department of Health.” Agronomy and Agricultural and Biological Engineering. Purdue University. Indiana.

Taylor, Catherine, Joseph Yahner, and Don Jones. 1997. An Evaluation of On-Site Technology in Indiana: A Report to the Indiana State Department of Health. Agronomy and Agricultural and Biological Engineering. Purdue University. Indiana.

Tchobanoglous, George, Franklin Burton, and H. David Stensel. 2002. Wastewater Engineering: Treatment and Reuse. Metcalf & Eddy Inc. 4th ed. McGraw-Hill Science/Engineering/Math.

Torkzaban, S., S. M. Hassanizadeh, J. F. Schijven, H. A. M. de Bruin, and A. M. de Roda Husman. 2006. “Virus Transport in Saturated and Unsaturated Sand Columns.” Vadose Zone Journal 5 (3): 877–85.

Tyler, E. J., and J. C. Converse. 1994. “Soil Acceptance of Onsite Wastewater as Affected by Soil Morphology and Wastewater Quality.” In On-Site Wastewater Treatment. Proc. of the 8th International Symposium on Individual and Small Community Sewage Systems. ASAE. St. Joseph, MI, 185–94.

Tyler, E. J., E. M. Drozd, and J. O. Peterson. 1991. “Estimating Wastewater Loading Rates Using Soil Morphological Descriptions.” In The 6 Th National Symposium on Individual and Small Community Sewage Systems, Chicago, IL, USA, 12/16-17/91, 192–200.

Tyler, E.J. 2001. “Hydraulic Wastewater Loading Rates To Soil.” In Pp. 80-86 in On-Site Wastewater Treatment, Proc. Ninth Natl. Symp. on Individual and Small Community Sewage Systems (11-14 March 2001, Fort Worth, Texas, USA), Ed. K. Mancl., St. Joseph, Mich. ASAE. http://asae.frymulti.com/abstract.asp?aid=6074&t=1.

Uejio, Christopher K., Steven H. Yale, Kristen Malecki, Mark A. Borchardt, Henry A. Anderson, and Jonathan A. Patz. 2014. “Drinking Water Systems, Hydrology, and Childhood Gastrointestinal Illness in Central and Northern Wisconsin.” American Journal of Public Health 104 (4): 639–46.

USEPA. 2003. “Voluntary National Guidelines for Management of Onsite and Clustered (Decentralized) Wastewater Treatment Systems”. US Environmental Protection Agency, Office of Water.

Van Cuyk, S. S, R. L Lowe, K. Harvey, and W. Ronald. 2004. “Evaluating Microbial Purification during Soil Treatment of Wastewater with Multicomponent Tracer and Surrogate Tests.” Journal of Environmental Quality 33 (1): 316.

Van Cuyk, Sheila, Robert L. Siegrist, Kathryn Lowe, and Ronald W. Harvey. 2004. “Evaluating Microbial Purification during Soil Treatment of Wastewater with Multicomponent Tracer and Surrogate Tests.” Journal of Environmental Quality 33 (1): 316–29.

Van Genuchten, M. Th, and D. R. Nielsen. 1985. “On Describing and Predicting the Hydraulic Properties of Unsaturated Soils.” Ann. Geophys 3 (5): 615–28.

Washington State Department of Health. 1990. “Vertical Separation: A Review of Available Scientific Literature and a Listing from Fifteen Other States.”

———. 2002a. “Rule Development Committee Issue Research Report - Draft - Type 1a Soil Issues.”

———. 2002b. “Rule Development Committee Issue Research Report – Draft – Organic Loading Rates”.

Washington State Department of Health.

———. 2002c. “Rule Development Committee Issue Research Report - Draft - Hydraulic Loading”.

Washington State Department of Health.

WeIIs, M. 1987. “Assessment of Land Capability for on-Site Septic Tank Effluent Disposal.”

Wespetal, M. S., and L. L. C. Frekot. 2001. “Development and Implementation of Performance Standards Assessing Performance Designs.” In On-Site Wastewater Treatment: Proceedings of the Ninth National Symposium on Individual and Small Community Sewage Systems, 11–14.

Williamson, Eric. 2009. “Performance Analysis of Established Advanced Onsite Wastewater Treatment Systems in a Subarctic Environment: Recirculating Trickling Filters, Suspended Growth Aeration Tanks, and Intermittent Dosing Sand Filters.” University of Alaska.

———. 2010. “Cold Climate Performance Analysis of On-Site Domestic Wastewater Treatment Systems.”

Water Environment Research 82 (6): 512–18. doi:10.2175/106143009X12529484815557.

Winneberger, J. H. T. 1984. Septic-Tank Systems: A Consultant’s Toolkit. Butterworth.

Yates, Marylynn Villinski, Charles P. Gerba, and Lee M. Kelley. 1985. “Virus Persistence in Groundwater.”

Applied and Environmental Microbiology 49 (4): 778–81.

Zangar, Carl N. 1953. “Theory and Problems of Water Percolation.”